[Federal Register Volume 63, Number 142 (Friday, July 24, 1998)]
[Notices]
[Pages 39866-39867]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-19885]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-5493-9]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 OR (202) 564-7153.
Weekly receipt of Environmental Impact Statements
Filed July 13, 1998 Through July 17, 1998
Pursuant to 40 CFR 1506.9
EIS No. 980269, Draft EIS, AFS, ID, Eagle Bird Project Area, Timber
Harvesting and Road Construction, Idaho Panhandle National Forests, St.
Joe Ranger District, Shoshone County, ID, Due: September 07, 1998,
Contact: Cameo Flood (208) 245-4517.
EIS No. 980270, Final EIS, FHW, NC, US 70 Improvements Project, I-40 to
the Intersection of US 70 and US 70 Business, Funding and COE Section
404 Permit, Wake and Johnston Counties, NC, Due: August 24, 1998,
Contact: Nicholas L. Graf, P.E. (919) 733-7842 ext. 260.
EIS No. 980271, Draft EIS, FHW, IN, US 231 Transportation Project, New
Construction from CR-200 N to CR-1150'1, Funding, Right-of-Way Permit
and COE Section 404 Permit, Spencer and Dubois Counties, IN, Due:
October 15, 1998, Contact: Douglas N. Head (317) 226-7487.
EIS No. 980272, Draft EIS, NOA, MS, Grand Bay National Estuarine
Research Reserve (NERR), Designation, To Conduct Research, Educational
Project and Construction, East of the City of Biloxi, Jackson County,
MS, Due: September 07, 1998, Contact: Stephanie Thornton (301) 713-3125
ext. 110
EIS No. 980273, Draft Supplement, FTA, PR, Tren Urbano Transit Project,
Updated Information for the Minillas Extension, Construction and
Operation, San Juan Metropolitan Area, Funding, NPDES Permit, US Coast
Guard Bridge Permit and COE Section 10 and 404 Permits, PR, Due:
September 07, 1998, Contact: Alex McNeil (404) 562-3511.
EIS No. 980274, Final EIS, FRC, NB, Kingsley Dam Project (FERC. No.
1417) and North Platte/Keystone Diversion Dam (FERC. No. 1835)
Hydroelectric Project, Application for Licenses, Near the confluence of
the North/South Platte Rivers, Keith, Lincoln, Garden, Dawson and
Gasper Counties, NB, August 24, 1998, Contact: Frankie Green (202) 501-
7704.
[[Page 39867]]
EIS No. 980275, Draft EIS, FAA, NC, Charlotte/Douglas International
Airport, Construction and Operation, New Runway 17/35 (Future 18L/36R
Associated Taxiway Improvements, Master Plan Development, Approval
Airport Layout Plan (ALP) and COE Section 404 Permit, Mecklenburg
County, NC, Due: September 07, 1998, Contact: Thomas M. Roberts (404)
305-7153.
EIS No. 980276, Draft EIS, BOP, PA, Greater Scranton Area, United
States Penitentiary (USP) Construction and Operation, Site Selection,
Lackawanna and Wayne Counties, PA, Due: September 8, 1998, Contact:
David J. Dorworth (202) 514-6470.
EIS No. 980277, Draft EIS, DOE, ID, Advanced Mixed Waste Treatment
Project, Construction and Operation, Site Selected, Idaho National
Engineering and Environmental Laboratory (INEEL), Eastern Snake River
Plain, ID, Due: September 11, 1998, Contact: John Medema (208) 526-
1407.
EIS No. 980278, Final EIS, AFS, ID, North Round Valley Timber Sales and
Road Construction, Implementation, Payette National Forest, New Meadows
Ranger District, Adams County, ID, Due: August 24, 1998, Contact:
Kimberly Brandel (208) 347-0300.
Amended Notices
EIS No. 980171, Draft EIS, COE, TX, Dallas Floodway Extension,
Implementation, Trinity River Basin, Flood Damage Reduction and
Environmental Restoration, Dallas County, TX, Due: August 14, 1998,
Contact: Gene T. Rice, Jr. (817) 978-2110. Published FR 05-15-98--
Review Period extended.
EIS No. 980267, Draft EIS, DOE, CA, NM, TX, ID, C, WA, Surplus
Plutonium Disposition (DOE/EIS-0283) for Siting, Construction and
Operation of three facilities for Plutonium Disposition, Possible Sites
Hanford, Idaho National Engineering and Environmental Laboratory,
Pantex Plant and Savannah River, CA, ID, NM, SC, TX and WA, Due:
September 16, 1998, Contact: G. Bert Stevenson (202) 586-5368. This EIS
was inadvertently omitted from the 07-17-98 Federal Register. The
official 45 days NEPA review period is calculated from 07-17-98.
Dated: July 21, 1998.
William D. Dickerson,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 98-19885 Filed 7-23-98; 8:45 am]
BILLING CODE 6560-50-P