[Federal Register Volume 59, Number 141 (Monday, July 25, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-17988]
[[Page Unknown]]
[Federal Register: July 25, 1994]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
Detroit Edison Co.; Notice of Denial of Amendment to Facility
Operating License and Opportunity for Hearing
[Docket No. 50-341]
The U.S. Nuclear Regulatory Commission (the Commission) has
partially denied a request by Detroit Edison Company, (licensee) for an
amendment to Facility Operating License No. NPF-43 issued to the
licensee for operation of the Fermi 2 facility, located in Monroe
County, Michigan. Notice of Consideration of Issuance of this amendment
was published in the Federal Register on September 2, 1993 (58 FR
46664).
The purpose of the licensee's amendment request was to make changes
to job titles, including a provision to allow for future job title
changes, changes to the onsite review organization (OSRO), and changes
to the overtime limit restrictions and control requirements of Section
6.0 of the Technical Specifications (TS).
The Commission has concluded that the licensee's request cannot be
fully granted. Certain requested title changes and changes to the
overtime limits, and a proposed change to the authority to specify the
number of surveillances under a radiation work permit, are denied. The
licensee was notified of the Commission's denial of the proposed change
by a letter dated
By August 24, 1994, the licensee may demand a hearing with respect
to the denial described above. Any person whose interest may be
affected by this proceeding may file a written petition for leave to
intervene.
A request for hearing or petition for leave to intervene must be
filed with the Secretary of the Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555, Attention: Docketing and Services
Branch, or may be delivered to the Commission's Public Document Room,
the Gelman Building, 2120 L Street, NW., Washington, DC 20555 by the
above date.
A copy of any petitions should also be sent to the Office of the
General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC
20555, and to John Flynn, Esq., Detroit Edison Company, 2000 Second
Avenue, Detroit, Michigan 48226, attorney for the licensee.
For further details with respect to this action, see (1) the
application for amendment dated May 24, 1993, and (2) the Commission's
letter to the licensee dated July 18, 1994.
These documents are available for public inspection at the
Commission's Public Document Room, the Gelman Building, 2120 L Street,
NW., Washington, DC 20555, and at the Monroe County Public Library
System, 3700 South Custer Road, Monroe, Michigan 48161. A copy of item
(2) may be obtained upon request addressed to the U.S. Nuclear
Regulatory Commission, Washington, DC 20555, Attention: Document
Control Desk.
Dated at Rockville, Maryland, this 18 day of July 1994.
For the Nuclear Regulatory Commission.
Ledyard B. Marsh,
Project Director, Project Directorate III-I, Division of Reactor
Projects III/IV, Office of Nuclear Reactor Regulation.
[FR Doc. 94-17988 Filed 7-22-94; 8:45 am]
BILLING CODE 7590-01-M