95-18168. Rhinelander Paper Company; Notice of Intent To File an Application for a New License  

  • [Federal Register Volume 60, Number 142 (Tuesday, July 25, 1995)]
    [Notices]
    [Page 38041]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-18168]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Project No. 2161 Wisconsin]
    
    
    Rhinelander Paper Company; Notice of Intent To File an 
    Application for a New License
    
    July 19, 1995.
    
        Take notice that the Rhinelander Paper Company, the existing 
    licensee for the Rhinelander Hydroelectric Project No. 2161, filed a 
    timely notice of intent to file an application for a new license, 
    pursuant to 18 CFR 16.6 of the Commission's Regulations. The original 
    license for Project No. 2161 was issued effective January 31, 1981, and 
    expires June 30, 2000.
    
        The project is located on the Wisconsin River in Oneida County, 
    Wisconsin. The principal works of the Rhinelander Project include an 
    180-foot-long earth dam with a concrete section containing two waste 
    gates; a 3,576-acre reservoir with a normal water surface elevation at 
    1555.33 feet msl; an intake structure containing 14 gates; an intake 
    canal about 965 feet long and 60 feet wide; a 36-foot wide tainter gate 
    spillway adjacent to the intake canal; a brick powerhouse containing 
    two 560-KW and one 1,000-kW generating units; transmission line 
    connections; and appurtenant facilities.
    
        Pursuant to 18 CFR 16.7, the licensee is required henceforth to 
    make available certain information to the public. This information is 
    now available from the licensee at 515 West Davenport Street, 
    Rhinelander, WI 54501.
    
        Pursuant to 18 CFR 16.8, 16.9 and 16.10, each application for a new 
    license and any competing license applications must be filed with the 
    Commission at least 24 months prior to the expiration of the existing 
    license. All applications for license for this project must be filed by 
    June 30, 1998.
    
    Lois D. Cashell,
    
    Secretary.
    
    [FR Doc. 95-18168 Filed 7-24-95; 8:45 am]
    
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
07/25/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-18168
Pages:
38041-38041 (1 pages)
Docket Numbers:
Project No. 2161 Wisconsin
PDF File: