97-19572. Ozark Gas Transmission System; Notice of Application  

  • [Federal Register Volume 62, Number 143 (Friday, July 25, 1997)]
    [Notices]
    [Page 40067]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-19572]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP97-645-000]
    
    
    Ozark Gas Transmission System; Notice of Application
    
    July 21, 1997.
        Take notice that on July 16, 1997, Ozark Gas Transmission System 
    (Applicant), 1,000 Louisiana, Suite 5800, Houston, Texas 77002 has 
    filed under Section 7(c) of the Natural Gas Act (NGA), for a 
    certificate to construct a delivery point for Arkansas Western Gas 
    Company (AWG) in Township 9N, Range 26W in Franklin County, Arkansas. 
    Under the terms of the Consent Decree issued in Docket No. CP78-532-
    000, 22 FERC para. 61,334 (1983) Applicant must obtain a certificate 
    from the Commission when it installs facilities to connect with any 
    other entity at the location where construction is proposed.
        The proposed construction will allow Applicant to deliver 17,400 
    Dth/d to AWG. Applicant estimates the cost of this project to be 
    $11,900. In addition, Applicant states that the construction will be 
    financed from funds on hand.
        Any person desiring to be heard or to make any protest with regard 
    to this application should on or before August 11, 1997, file with the 
    Federal Energy Regulatory Commission, 888 First Street, NE., 
    Washington, DC 20426, a motion to intervene or a protest in accordance 
    with the requirements of the Commission's Rules of Practice and 
    Procedure (18 CFR 385.214 or 385.211) and the Regulations under the 
    Natural Gas Act (18 CFR 157.10). All protests filed with the Commission 
    will be considered by it in determining the appropriate action to be 
    taken but will not serve to make the protestants parties to the 
    proceeding. Any person wishing to become a party to the proceeding or 
    to participate as a party in any hearing therein must file a motion to 
    intervene in accordance with the Commission's Rules.
        Take further notice that, pursuant to the authority contained in 
    and subject to the jurisdiction conferred upon the Federal Energy 
    Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and 
    the Commission's Rules of Practice and Procedure, a hearing will be 
    held without further notice before the Commission or its designee on 
    this application if no motion to intervene is filed within the time 
    required herein, if the Commission on its own review of the matter 
    finds that a grant of the certificate is required by the public 
    convenience and necessity. If a motion for leave to intervene is timely 
    filed, or if the Commission on its own motion believes that a formal 
    hearing is required, further notice of such hearing will be duly given.
        Under the procedure herein provided for, unless otherwise advised, 
    it will be unnecessary for Applicant to appear or be represented at the 
    hearing.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 97-19572 Filed 7-24-97; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
07/25/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-19572
Pages:
40067-40067 (1 pages)
Docket Numbers:
Docket No. CP97-645-000
PDF File:
97-19572.pdf