E8-17109. Special Areas; Roadless Area Conservation; Applicability to the National Forests in Colorado
-
Start Preamble
Start Printed Page 43544
AGENCY:
Forest Service, USDA Forest Service.
ACTION:
Notice of proposed rulemaking; request for comment.
SUMMARY:
The Forest Service, U.S. Department of Agriculture (USDA), is proposing to establish a State-specific rule to provide management direction for conserving Colorado roadless areas. The USDA invites written comments on both the proposed rule and the draft environmental impact statement (DEIS) and will consider those comments in developing a final rule and final environmental impact statement (FEIS). The final rule will be published in the Federal Register.
DATES:
Comments must be received in writing 90 days from the date the rule is published in the Federal Register.
ADDRESSES:
Comments may be sent via e-mail to COcomments@fsroadless.org. Comments also may be submitted via the internet at http://www.regulations.gov. Written comments concerning this notice should be addressed to Roadless Area Conservation—Colorado, P.O. Box 162909, Sacramento, CA 95816-2909, or via facsimile to 916-456-6724.
All comments, including names and addresses, when provided, are placed in the record and are available for public inspection and copying.
A copy of this proposed rule, draft environmental impact statement (DEIS), the DEIS summary, dates and locations of public meetings, and other information related to this rulemaking will be available at the national roadless Web site http://www.roadless.fs.fed.us. Reviewers may request printed copies or compact disks of the DEIS and the summary by writing to Colorado Roadless Team/Planning, USDA Forest Service, Rocky Mountain Regional Office, 740 Simms Street, Golden, CO 80401-4720, or by e-mail to comments-rocky-mountain-regional-office@fs.fed.us, or by Fax to 303-275-5134. When ordering, requesters must specify their address, if they wish to receive the summary or full set of documents, and if the material should be provided in print or compact disk. Printed copies will be available for public viewing at Forest Service district and supervisor's offices within the State of Colorado.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Colorado Roadless Rule Team Leader Kathy Kurtz at (303) 275-5083. Individuals using telecommunication devices for the deaf (TDD) may call the Federal Information Relay Service (FIRS) at 1-800-877-8339 between 8 a.m. and 8 p.m. Eastern Standard Time, Monday through Friday.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Background
As a leader in natural resource conservation, the Forest Service provides direction for the management and use of the Nation's forests, rangeland, and aquatic ecosystems under its jurisdiction. Similarly, the State of Colorado is committed to sustained natural resource use and conservation of State and Federal land within its borders. Furthermore, the Forest Service is charged to collaborate cooperatively with states and other interested parties regarding the use and management of the National Forest System (NFS).
State of Colorado Petition
On July 14, 2005, the State of Colorado announced it would submit a petition requesting specific regulatory protections for the inventoried roadless areas within the State. The State's commitment to participate was evidenced by Senate Bill 05-243, the “Roadless Areas Review Task Force” legislation signed into law on June 8, 2005. The bill outlined membership and responsibilities of a 13-member bipartisan task force to make recommendations to the Governor regarding inventoried roadless areas in NFS lands in Colorado. The task force held nine public meetings throughout the State, reviewed over 40,000 public comments, and conducted a comprehensive review of Colorado's 4.4 million acres of roadless areas (2001 Roadless Rule).
Colorado's petition (2006 petition) was submitted to the Secretary of Agriculture for consideration on November 13, 2006, by then-Governor Owens with the provision it be considered under section 553(e) of the Administrative Procedure Act and USDA regulations at 7 CFR 1.28. On April 11, 2007, Governor Ritter resubmitted the 2006 petition with a substantive letter of transmittal, which became the 2007 petition. Governor Ritter's transmittal letter requested that state-specific rulemaking be undertaken to provide an “insurance policy for protection of our roadless areas,” given ongoing legal uncertainty. The 2007 petition took into account State and local resource management challenges along with the national interest in maintaining roadless characteristics and the need for management flexibility in certain circumstances.
The Roadless Area Conservation National Advisory Committee (RACNAC) reviewed the 2007 petition on June 13 and 14, 2007, in Washington, DC. Harris Sherman, executive director of the Colorado Department of Natural Resources, representing Governor Ritter, described the scope and intent of the 2007 petition. The RACNAC also heard comments from other State and Forest Service officials, task force members, and members of the public. On August 8, 2007, the RACNAC issued a unanimous consensus-based recommendation to the Secretary to direct the Forest Service, with the State of Colorado as a cooperating agency, to proceed with rulemaking based on the 2007 petition.
After reviewing the RACNAC's recommendation, the Secretary accepted the 2007 petition on August 24, 2007, and directed the Forest Service to initiate rulemaking based on the petition. The proposed rule would respond to the 2007 petition by establishing a system of Colorado Roadless Areas (CRAs) with protections for these areas that would supersede the 2001 Roadless Rule.
The USDA, State, and Forest Service are committed to conserving and managing roadless areas and consider these areas an important and exceptional component of the NFS. The USDA, State, and Forest Service believe the most viable path for lasting conservation of these areas is through properly integrating local, State, and national perspectives on roadless area management on NFS lands located within the State of Colorado.
Through a memorandum of understanding dated January 8, 2008, the State of Colorado was granted cooperating agency status with the Forest Service, under 40 CFR 1508.5, for the preparation of the environmental impact statement (EIS) associated with this rulemaking.
Within the 2007 petition, the State requested the Colorado Department of Natural Resources and/or the Colorado Division of Wildlife be offered cooperating agency status to assure participation in the evaluation of future proposed activities in CRAs associated with Federal coal reserves under certain lands in the North Fork coal mining area on the Grand Mesa, Uncompahgre, and Gunnison National Forests, and Start Printed Page 43545proposed activities associated with ski area lands proposed for removal from roadless designation, listed in Table 2. In addition, the Forest Service will offer cooperating agency status to the State where it expresses an interest for any Forest Service project or planning activity on NFS lands located within CRAs, pursuant to the Council on Environmental Quality implementing National Environmental Policy Act (NEPA) regulations at 40 CFR 1500-1508. Where the Forest Service does not have the authority to grant cooperating agency status, the Forest Service will coordinate with the State.
National Forest System Land Inventories in Colorado
The 2007 petition proposed using the 2001 Roadless Rule inventoried roadless areas as a basis for identifying CRAs. These inventories would be updated by technical corrections to the inventory, such as but not limited to, congressionally-designated areas as defined in Table 3, land exchanges, and any boundary line revisions including additions and deletions to the inventory through revised forest plans (Arapaho and Roosevelt, Routt, Rio Grande and White River National Forests) and ongoing forest plan revisions (Grand Mesa, Uncompahgre, and Gunnison; San Juan; Pike and San Isabel; and Manti-La Sal National Forests). Finally, the 2007 petition identified that certain portions of ski areas (described in Table 2) were not to be included in CRAs. Table 1 displays the acreage changes between the 2001 inventoried roadless areas (IRAs) and the proposed CRA boundaries.
Table 1.—Net Change in Roadless Acres Designations by Forest—Inventoried Roadless Area Acres to Colorado Roadless Area Acres
2001 Rule total IRA acres 1 Congressionally designated as wilderness or special areas 2 not included in IRAs or CRAs Total IRA acres without congressionally designated acres IRA acres not included within CRAs Unroaded acres added to CRAs Total roadless acres in CRAs Net change between IRA and CRA acres Arapaho-Roosevelt 391,000 (1997) (37,000) 354,000 (5,000) 1,000 350,000 (4,000) GMUG 1,127,000 (1979) (67,000) 1,060,000 (329,000) 120,000 853,000 (2005 draft) (207,000) Pike-San Isabel 688,000 (1979) (19,000) 669,000 (77,000) 82,000 674,000 (2006 draft) 5,000 Rio Grande 530,000 (1996) 530,000 (16,000) 4,000 518,000 (12,000) Routt 442,000 (1998) 442,000 (10,000) 2,000 434,000 (8,000) San Juan 604,000 (1979) (60,000) 544,000 (84,000) 99,000 558,000 (2006 draft) 14,000 White River 640,000 (2002) 640,000 (5,000) 1,000 636,000 (4,000) Manti La Sal in Colorado 11,000 (1979) 11,000 (4,000) 500 8,000 (2006 draft) (3,000) Total State of Colorado 4,433,000 (184,000) 4,249,000 (529,000) 309,000 4,031,000 (218,000) Acres may not add due to rounding (ref. DEIS). 1 The 2001 Roadless Rule used inventoried roadless areas from forest plans that were in effect at the time the 2001 Rule was developed, or a roadless inventory that had undergone public involvement. The date of each forest's inventory used for the 2001 Rule is shown here. Acreages are from the 2001 Roadless Rule FEIS. 2 This column includes acres for the James Peak and Spanish Peak Wildernesses and additions to the Indian Peaks Wilderness, and Bowen Gulch and James Peak Protection Areas, Roubideau and Tabeguache Special Areas, Fossil Ridge Recreation Management Area, and the Piedra Special Management Unit all designated by Congress but not excluded from the 2001 RACR inventory. 3 Acres not included are those identified as substantially altered, mapping errors, updated GIS technology, land exchanges, and ski area acres. Table 2.—Ski Area Acres in 2001 IRAs or Forest Plan Inventories Not Included in CRAs per 2007 Petition
National Forest ski areas Colorado roadless area(s) Ski area permitted acres Additional ski area allocation 1 acres Total ski acres not included in CRAs Arapaho-Roosevelt National Forest Loveland Bard Creek, Mount Sniktau 1,370 1,620 2,990 Grand Mesa, Uncompahgre, and Gunnison National Forest Crested Butte Gothic 900 0 900 Pike-San Isabel National Forest Ski Cooper Mad Creek DB & DB1 560 0 560 Start Printed Page 43546 Routt National Forest Steamboat Springs Long Park 180 0 180 San Juan National Forest—(Draft Revised Forest Plan) Durango Mountain Resort San Miguel 0 2 90 90 White River National Forest Arapahoe Basin Porcupine Peak 1,050 0 1,050 Aspen Mt McFarlane 50 0 50 Beaver Creek Meadow Mountain A & B 510 0 510 Breckenridge Tenmile 150 0 150 Buttermilk Burnt Mountain 50 0 50 Copper Mountain Ptarmigan Hill 720 0 720 Snowmass Burnt Mountain 80 0 80 Vail Game Creek 900 0 900 Total 6,500 1,700 8,200 Ski area acres rounded to nearest 10 acres and total acres rounded to nearest 100 acres. Totals may not add due to rounding. Ski areas on National Forest System lands in the State of Colorado that are not listed here do not contain roadless acres within their permit or allocation boundary. 1 Acres allocated in forest plans to ski area management that adjoin currently operating ski areas but are not within the current permitted area. 2 Expansion of Durango Mountain Resort is included within the San Juan's forest plan revision, draft preferred alternative. There are 90 acres of roadless area to be excluded from the CRA inventory. Table 3.—Congressionally Designated Acres Included in 2001 IRAs and Not Included in CRAs
Congressional designations National Forest Acres within roadless areas Bowen Gulch Protection Area Arapaho-Roosevelt 8,600 Indian Peaks Wilderness additions Arapaho-Roosevelt 3,000 James Peak Protection Area Arapaho-Roosevelt 11,300 James Peak Wilderness Arapaho-Roosevelt 14,300 Fossil Ridge Recreation Management Area Grand Mesa, Uncompahgre, and Gunnison 39,800 Roubideau Area Grand Mesa, Uncompahgre, and Gunnison 18,600 Tabeguache Area Grand Mesa, Uncompahgre, and Gunnison 8,900 Spanish Peak Wilderness Pike-San Isabel 18,700 Piedra Special Management Unit San Juan 60,400 Total 184,000 Using these inventories, the Forest Service has identified 4.031 million acres of roadless areas that would be subject to this proposed rule. This rule, if finalized as proposed, would establish CRA maps defining the boundaries of these areas and would be maintained at the national headquarters office of the Forest Service as provided in section 294.32 of this rule. These maps and acreages may be modified with additions or deletions to boundary lines only as outlined in section 294.37. Acres not included in the CRAs that were within the boundaries of the 2001 Roadless Rule IRAs would not be subject to the 2001 Roadless Rule and would be managed under their respective forest plan direction as provided in section 294.36(i).
Proposed Roadless Area Conservation Rule for Colorado
The USDA, State, and Forest Service believe this proposed rule for Colorado represents a unique opportunity to collaboratively manage and protect roadless areas within the State of Colorado. The petitioning process and the proposed rule enables the Forest Service to consider the comments of people most affected by or concerned about the contents of state-specific rulemaking for roadless areas across the State in balance with national concerns for these areas. The proposed rule represents a balanced solution for retaining the integrity and natural beauty of Colorado's roadless areas while maintaining management flexibility to affect future changes where needed.
The Forest Service, in cooperation with the State, has completed a review of the social, economic, and environmental characteristics and values associated with the IRAs in Colorado. With public input, the Forest Service has considered the question of how these roadless lands should be managed within the scope of the Forest Service's authority. The management direction proposed by these regulations would take precedence over any inconsistent regulatory provision or land management plan but would not supersede valid existing rights. All forests must meet the requirements of the proposed rule, regardless of their forest plan guidance. However, the Start Printed Page 43547proposed rule at sections 294.33 and 294.34 does allow restrictions from forest plans to apply if they are more stringent than the proposed rule. Forest plans are revised at approximately 15-year intervals and are amended as needed. A revision or amendment could result in more restrictive direction for an individual CRA, but any forest plan direction with less restrictive direction, would have no force or effect (sec. 294.36(d)).
Ski Areas
The State of Colorado's petition requested the Forest Service not include within CRAs, certain acres that are within the 2001 IRAs and allocated in forest plans to a ski-based management area prescription. This includes acres that are currently within the ski area permitted boundaries (6,500 acres) as well as acres that have been allocated in forest plans (current or draft, 1,700 acres) to a ski-based management area prescription that are not currently within the permitted areas but directly adjoin current operating ski areas. A list of the acres not included in the CRAs by ski area can be found in Table 2.
The combined 8,200 ski area acres that are not proposed for CRA designation would remain subject to their respective forest plan direction and applicable terms and conditions of special use authorizations. Any proposal for these ski area acres, including expanding a ski area permit boundary into an area allocated to a ski-based management prescription would be subject to all appropriate environmental analysis, including NEPA analysis.
Limited Road Construction and Reconstruction
The proposed rule at section 294.33 prohibits road building in CRAs except under certain circumstances. The circumstances in section 294.33(b) allow for a road, whereas circumstances in section 294.33(c) are specific to temporary roads. Whenever a forest road is proposed, an EIS will be prepared (sec. 294.33(e)). For all other circumstances, NEPA requirements will be used to determine the level of environmental analysis needed.
Many exceptions in the proposed rule mirror the exceptions for road building provided in the 2001 Roadless Rule, but several additional circumstances allowing road building are proposed. The proposed rule at section 294.33(b)(6) includes an additional circumstance that would allow for the construction and maintenance of roads for existing and future utility and water conveyance structures. The Forest Service and the State believe this is a needed exception so Colorado's water and utility infrastructure can be properly operated and maintained. This provision is only intended to apply to existing and future authorized utility and water conveyance structures. The proposed rule at section 294.31 provides the definition for utility and water conveyance structures. The definition does not include road construction or reconstruction for the construction or maintenance needed for reservoirs. In addition, the proposed rule at section 294.33(b)(7) includes an additional circumstance that would allow for the construction and maintenance of roads needed for the management of livestock grazing. The Forest Service and State recognize the importance of maintaining a viable ranching industry in Colorado. Conserving sustainable, working grasslands reduces development pressure on these lands and is a component of the Forest Service's Open Space Conservation Strategy.
Another change from the 2001 Roadless Rule is the emphasis the proposed rule places on using temporary roads to the extent possible for any of the circumstances allowing for road building (sec. 294.33(c) and (e)). The proposed rule also emphasizes restoration of temporary roads at section 294.33(c).
The Forest Service is charged with managing the National Forest transportation system, including requirements for temporary roads to be designed with the goal of reestablishing vegetative cover on the roadway and areas where the vegetative cover has been disturbed by road construction within ten years after the termination of a contract, permit, or lease through either artificial or natural means (ref. 16 U.S.C. 1608). The Forest Service and State have considerable experience dealing with road restoration activities across many types of programs and activities. For example, the State administers a federally-funded abandoned mine reclamation program in which one principal goal is to identify environmental problems arising from abandoned mines and then to design appropriate closure methods and reclamation techniques (including restoring roads) at project sites. The State has restored over 1,500 acres of abandoned mine lands statewide since 1980.
The proposed rule anticipates that lands affected will be returned to a condition consistent with the preexisting roadless characteristics (sec. 294.33(c)). However, the proposed rule recognizes that restoration efforts are to proceed in an environmentally sound way. In rare instances, complete obliteration and restoration (such as fully recontouring the roadway to its natural state) may cause more environmental harm than recontouring to a level that stabilizes against soil loss or other damage. For example, when the Forest Service decommissions temporary roads, restoration and obliteration are intended to make the corridor unusable as a road, stabilize it against soil loss or other damage, and reestablish the affected land's natural resource capabilities through such actions as: removing bridges and culverts and reestablishing normal maximum water flow, eliminating ditches, out-sloping the roadbed, removing ruts and berms, and recontouring road cuts. However, fully recontouring a road cut may set the stage for higher levels of soil loss due to unsuccessful revegetation on a steep slope as compared to partial recontouring incorporating a design that facilitates revegetation.
Roads built for access to existing oil and gas leases as of the date of the Colorado Rule (sec. 294.33(c)(3)) and roads built to accommodate coal mining exploration and coal-related surface activities in the North Fork coal mining area (sec. 294.33(c)(4)) would be classified as temporary or long-term temporary roads. The proposed rule would establish a new category of road, long-term temporary road, which would have application only in CRAs. The intent is to provide a classification for roads associated with oil and gas, or coal leases that better recognizes the longer term, but non-permanent nature that is typical of such roads. Long-term temporary roads would be expected to be in place anywhere from 10 to 30 years. They would be included in the forest transportation system, ensuring they will be monitored and maintained in compliance with the terms of the applicable permit or special use authorization. However, as with other temporary roads, any long-term temporary roads constructed pursuant to an oil and gas lease or pursuant to a coal exploration license or a coal lease shall be decommissioned and the affected landscape restored when the road is no longer needed, or upon termination of the lease or license. The intent of this provision is to preserve the roadless character of CRAs to the maximum extent practicable.
Except for emergency purposes, administrative use, or motorized vehicle use that is specifically authorized, all roads constructed in CRAs will be closed to motorized vehicles, including off-highway vehicles (OHVs) not authorized for the specific activity for Start Printed Page 43548which the road was constructed (sec. 294.33(d)). Any temporary roads, including long-term temporary roads, built in a CRA would not serve as the basis for altering the management status for that CRA. (sec. 294.33(c)).
Colorado State Land Board Mineral Interests
The proposed rule at section 294.33(b)(2) aligns with the Colorado State Land Board's current ability to develop its mineral interests that underlie NFS lands in CRAs. Access to such mineral interests would continue to be governed by operation of the standard applicable laws and regulations rather than by this rule. The Forest Service and the State are committed to exploring opportunities for land exchanges whereby the State could acquire other property interests of equal value, outside of roadless areas. Such exchanges would provide the Forest Service with unified administration of both surface and mineral interests in CRAs.
Public and Safety
The USDA, Forest Service, and State are committed to preserving roadless area characteristics while also protecting human health and safety. In an effort to achieve a proper balance, the proposed rule would allow for the construction of a temporary road if it is needed to safeguard public health when there is a catastrophic event, such as a flood or fire, which would cause the loss of life or property (sec. 294.33(c)(2)).
Locatable Minerals
Development of locatable minerals is subject to the General Mining Law of 1872, as amended. Like the 2001 Roadless Rule the proposed rule does not seek to impose any limits on activities related to the exploration for or development of locatable minerals. The proposed rule at section 294.33(b)(2) allows for roads provided for by statute or treaty, which includes roads provided under the General Mining Law of 1872, as amended. The proposed rule does not affect or seek any withdrawal of the mineral estate in CRAs. Therefore, the proposed rule will not affect rights of reasonable access to prospect and explore lands open to mineral entry and location, or to develop any minerals discovered.
Saleable Minerals
Disposal of saleable minerals (mineral materials) is at the discretion of the Forest Service, subject to the provisions of 36 CFR 228 subpart C. The proposed rule prohibits road construction or reconstruction associated with developing new mineral material sites in roadless areas, unless this material is necessary to and accessible from roads allowed to be constructed under other provisions of the rule.
Leasable Minerals—Oil and Gas
Like the 2001 Roadless Rule the proposed rule does not prohibit oil and gas leasing. However, prohibitions on road construction and reconstruction provided in the proposed rule (sec. 294.33), would affect Federal oil and gas leases, subject to valid and existing rights. The proposed rule (sec. 294.33 (c)(3)) would require future leases within CRAs include stipulations that prohibit road construction. Drilling and production may be allowed on leases in roadless areas issued after the effective date of the rule, but new roads to access sites for drilling and production will not be allowed. Oil and gas resources in roadless areas under leases issued after the effective date of the final rule may be developed by helicopter access or by other means such as directional drilling from outside the roadless areas. These provisions bar roading, but would not restrict the construction of oil and gas pipelines in CRAs where the construction of a pipeline is necessary to transport the product of an oil and gas lease on lands within a CRA that are under lease by the Secretary of the Interior as of the effective date of the final rule.
The proposed rule at section 294.33(c)(3) would allow for temporary or long-term temporary road construction or reconstruction for access on and to Federal oil and gas leases that were issued before the effective date of the final rule and that allow road construction. Such access will be allowed pursuant to valid existing rights but restricted to lessees, operators, and their designated contractors; Forest Service and Bureau of Land Management (BLM) personnel and other federal and state agencies with jurisdictional authority over mineral development activity allowed under the proposed rule; and fire, emergency, or law enforcement personnel.
The proposed rule does not allow the Forest Service to authorize the BLM to grant a waiver (permanent removal), exception (case-by-case exemption), modification (permanent changes), or otherwise remove stipulations prohibiting surface occupancy or road construction or reconstruction on existing leases or on any future lease in any CRAs where these stipulations occur, It is the intent of the proposed rule to maintain all no surface occupancy, controlled surface use and other stipulations that restrict road construction and reconstruction on all existing leases, including those specifically tied to the 2001 Roadless Rule.
Leasable Minerals—Coal
The proposed rule at section 294.33(c)(4) provides for temporary or long-term temporary roads associated with the exploration and mining of coal resources in roadless areas in the North Fork coal mining area on the Grand Mesa, Uncompahgre, and Gunnison National Forests. This area is identified on the North Fork coal mining area map within the DEIS for the proposed Colorado Roadless Rule. This area would be included in the CRAs and will be managed in a way that permits temporary or long-term temporary roads and other coal related surface activities associated with coal exploration and coal mining to occur (sec. 294.33(c)(4)). Such temporary or long-term temporary roads will be closed to the public. The use of these roads will be restricted to coal mine and oil and gas operations, the Forest Service and other Federal and State agencies with jurisdictional authority, including emergency response, fire, and law enforcement personnel.
Temporary and long-term temporary coal mine roads may be constructed for exploration drilling, resource monitoring, safety, or installation and operation of surface facilities needed to operate coal mines, including methane venting wells. In some instances roads are necessary to comply with Mine Safety and Health Administration (MSHA) requirements for mine safety, and to meet Colorado Division of Reclamation, Mining, and Safety requirements for resource monitoring. For example, roads may be constructed to facilitate the venting of coal mine methane gas. Methane is a by-product of coal mining in the North Fork area and must be removed from the mines to protect miner health and safety.
The proposed rule also provides the opportunity for an oil and gas lessee to use roads for the purpose of collecting and transporting coal mine methane rather than venting the methane into the atmosphere. These activities will remain within the authorized right of way for the long-term temporary roads; no additional roads or pipelines outside the right-of-way will be constructed. Any roads constructed pursuant to a coal lease or exploration license and used for collection and transportation of coal mine methane under an oil and gas lease shall be decommissioned and the affected landscape restored when the road is no longer needed for coal mining Start Printed Page 43549purposes or coal mine methane collection, whichever is later.
Leasable Resources—Geothermal Energy
Colorado has high geothermal energy potential on NFS lands both inside and outside roadless areas. However, site-specific information on this resource in CRAs is limited. At this time, the proposed Colorado Roadless Rule does not include a specific exemption for geothermal energy resources. The proposed rule makes no special provision for road construction and reconstruction associated with geothermal energy sources. Once additional information becomes available, the State or other parties could choose to seek a change in the rule's restrictions.
Road Closures
The proposed rule does not provide direction about where and when OHV use would be permissible except roads constructed under this provision would be closed to OHVs pursuant to section 294.33(d). Travel planning-related actions will continue to be addressed through travel management and individual forest plans.
Tree Cutting, Sale, or Removal—Forest Health
In order to reduce the hazard of wildfire near communities and after careful consideration of roadless area characteristics, the proposed rule at sections 294.34(b)(1)(ii) and 294.33 (c)(1) allows for forest health treatments and temporary road construction to meet needs described in Community Wildfire Protection Plans (CWPPs) or, if a CWPP is not in place, within the Wildland Urban Interface (WUI). CWPPs are collaborative agreements in which local communities identify and prioritize areas for hazardous fuel reduction treatments. The Forest Service and the State believe that allowing forest health treatments for projects identified in CWPPs or within WUIs strike the proper balance of protecting roadless area characteristics while allowing forest health and community protection needs to be addressed.
Oil and Gas Pipelines
After the petition was submitted the State requested that the proposed rule (sec. 294.35) restrict the construction of oil and gas pipelines through CRAs where a source or sources of the oil and/or gas are exclusively outside CRAs. The proposed rule would not prohibit the construction of pipelines that were authorized by the Forest Service or another jurisdictional agency prior to the effective date of the final rule. The proposed rule would not restrict the construction of oil and gas pipelines in CRAs where the construction of a pipeline is necessary to transport the product of an oil and gas lease on lands within a CRA that are under lease by the Secretary of the Interior as of the effective date of the final rule.
Access
The Forest Service and State are committed to conserving roadless area characteristics while also providing reasonable access to public and private property and facilities. Several aspects of the proposed rule address the need for the State and/or private parties to access property and/or facilities (sec. 294.33(b)(2) and (6); (sec. 294.33(c)(3) and (4); sec. 294.36(g)).
Regulatory Certifications
Regulatory Planning and Review
This proposed rule was reviewed under USDA procedures, Executive Order 12866 issued September 30, 1993 (E.O. 12866), as amended by E.O. 13258 and E.O. 13422 on Regulatory Planning and Review, and the major rule provisions of the Small Business Regulatory Enforcement and Fairness Act (5 U.S.C. 800). These executive orders address regulatory planning and review and require that agencies conduct a regulatory analysis for economically significant regulatory actions. Economically significant regulatory actions are those that have an annual effect on the economy of $100 million or more or adversely affect the economy or economic sectors. Because this rule is projected to have an annual effect on the economy of approximately $500 million, this proposed rule has been designated as significant and is subject to Office of Management and Budget (OMB) review under E.O. 12866. This proposed rule is not expected to interfere with an action taken or planned by another agency nor raise new legal or policy issues. This action will not alter the budgetary impact of entitlements, grants, user fees, or loan programs or the rights and obligations of recipients of such programs.
A regulatory impact analysis has been prepared for this proposed rule. OMB Circulars as well as guidance regarding E.O. 12866 indicate that regulatory impact analysis should include benefit cost analysis and an assessment of distributional effects. We are seeking comments on assumptions, methods, and conclusions in the Regulatory Impact Analysis and Cost-Benefit Analysis. The benefits, costs, and distributional effects of three alternatives referred to as follows: the proposed Colorado Roadless Rule (proposed rule), 2001 Roadless Rule (2001 rule) and land management plans (LMPs) are analyzed over a 15 year time period. As of the printing of this proposed rule, the 2001 rule is in operation. For the purpose of regulatory impact analysis, the 2001 rule represents baseline conditions or goods and services provided by NFS lands in the near future in the absence of the proposed rule.
The proposed rule is programmatic in nature and intended to guide future development of proposed actions within roadless areas. The proposed rule is intended to provide greater management flexibility under certain circumstances to address unique and local land management challenges, while continuing to conserve roadless values and characteristics. Increased management flexibility is primarily needed to reduce hazardous fuels and large-scale insect and disease outbreaks, allow access to coal reserves in the North Fork coal mining areas and ski area development, and to allow access to future utility and water conveyances, while continuing to conserve roadless area values and characteristics.
This proposal does not authorize the implementation of any ground-disturbing activities, but rather it describes circumstances under which certain activities may be allowed or restricted within roadless areas. Before authorizing land use activities in roadless areas, the Forest Service must complete a more detailed and site-specific environmental analysis pursuant to the NEPA and its implementing regulations at 40 CFR 1500-1508.
Because the proposed rule does not prescribe site-specific activities, it is difficult to predict the benefits and costs or other changes of the different alternatives. In addition, the types of benefits derived from roadless characteristics and the uses of roadless areas are far ranging and include a number of non-market and non-use benefit categories that are difficult to measure in monetary terms. As a consequence, benefits are not monetized, nor are net present values or benefit cost ratios estimated. Instead, increases and/or losses in benefits are discussed separately for each resource area in a quantitative or qualitative manner. Benefits and costs are organized and discussed in the context of local land management challenges or concerns (‘local challenges') and ‘roadless characteristics' in an effort to remain consistent with the overall purpose of the proposed rule, recognizing that benefits associated Start Printed Page 43550with local challenges may trigger or overlap with benefits associated with roadless characteristics in some cases (e.g., forest health). Access and designations for motorized versus non-motorized recreation is a topic raised in comments during scoping, however, the proposed rule does not provide direction on where and when off-highway vehicle (OHV) use would be permissible and makes clear that travel planning-related actions should be addressed through travel management planning and individual land management plans.
Distributional effects or economic impacts, in terms of jobs and labor income, are quantified for the oil and gas and the coal sectors for an economic area consisting of five Colorado counties (Delta, Garfield, Mesa, Montrose, and Rio Blanco) using a regional impact model. Fiscal impacts (i.e., mineral lease payments) are estimated for counties where changes in mineral activity are expected to be physically located (Delta, Garfield, Gunnison, Mesa, Montrose, and Pitkin). The distributional effects associated with protecting values at risk from wildfire are characterized by estimating the number of communities-at-risk expecting to benefit from fuel treatments in roadless areas. Distributional effects or economic impacts are not evaluated for other economic sectors (e.g., timber harvest, recreation) due to evidence presented in respective resource sections suggesting that the extent or magnitude of changes in output or services are not sufficient to cause significant changes in distributional effects.
Details about the environmental effects of the proposed rule can be found in the Roadless Area Conservation; National Forest System Lands in Colorado Draft Environmental Impact Statement (DEIS). Effects on opportunities for small entities under the proposed rule are discussed in the context of Executive Order 13272 regarding proper consideration of small entities and the Small Business Regulatory Enforcement Fairness Act of 1996 (SBREFA), which amended the Regulatory Flexibility Act (5 U.S.C. 601 et seq.). The results of the regulatory impact analysis for the proposed rule are summarized in the following tables. Table 1 provides information related to roadless area acreage, road miles and tree-cutting. Table 2 summarizes the potential benefits and costs of the proposed rule, the 2001 roadless rule, and land management plans alternatives. Table 3 summarizes distributional effects and economic impacts of the proposed rule and alternatives.
Start Printed Page 43551 Start Printed Page 43552 Start Printed Page 43553 Start Printed Page 43554 Start Printed Page 43555 Start Printed Page 43556 Start Printed Page 43557 Start Printed Page 43558Proper Consideration of Small Entities
This proposed rule has also been considered in light of Executive Order 13272 regarding proper consideration of small entities and the Small Business Regulatory Enforcement Fairness Act of 1996 (SBREFA), which amended the Regulatory Flexibility Act (5 U.S.C. 601 et seq.). The Forest Service with the assistance of the State of Colorado has determined that this action will not have a significant economic impact on a substantial number of small entities as defined by the E.O. 13272 and SBREFA, because the proposed rule does not subject small entities to regulatory requirements. Therefore, an initial regulatory flexibility analysis is not required for this proposed rule.
For small businesses affiliated with most industry sectors involved with activities in roadless areas (e.g., coal, oil and gas), potential opportunities increase due to easing of restrictions on road construction and tree-cutting in certain circumstanced under the proposed rule. As a result, there is little or no potential for significant adverse economic impacts to small businesses under the proposed rule relative to no-action conditions (i.e., 2001 rule).
There are about 1,390 recreation special use permits currently authorized within NFS lands in Colorado of which a large majority are small businesses, and 1,066 (77%) are associated with outfitter and guide permits, some of which are likely to operate within roadless areas. However, there is little difference between alternatives with respect to recreation special use authorizations in roadless areas, because limitations on roading and tree-cutting under any alternative would not be likely to affect ability to obtain or use a recreation use authorizations. Exceptions might be special-use permit holders who rely on primitive or semi-primitive recreational settings to maintain the quality of the outdoor or remote experience. Increases in road construction and tree-cutting may have adverse impacts on permit holders in specific areas under the proposed rule, but impacts are not expected to be significant due to the small percentage (0.2%) of acreage affected (7,600 acres of tree-cutting per year) and roads constructed (21 miles per year) spread across 4 million acres of Colorado Roadless Areas. It is also noted that a significant percentage of roads and tree-cutting activity will occur within or near the wildland urban interface areas where primitive or semi-primitive settings may already be affected.
Projected harvest volumes from roadless areas from the seven affected National Forest units are all greater under the proposed rule and land management plans relative to the no-action alternative (2001 rule). As such there is little or no potential for adverse impacts to small entity opportunities, relative to no-action, in aggregate or in the context of individual forest unit areas. Volumes are projected to be 17,700 hundred cubic feet (ccf) less under the proposed rule, relative to the land management plans, and approximately 70% of the decrease is due to volume changes on the Pike San Isabel National Forest (decrease of 12,720 ccf). All seven National Forest units have been in compliance with small business set aside shares for the period 1/1/2000 to 9/30/2005. The proposed rule, relative to the land management plans alternative, may decrease small entity opportunities for wood products businesses associated with the Pike San Isabel National Forest, recognizing that small business shares are already being met and that aggregate volumes sold from NFS lands may not change significantly under any alternative due to flat budget assumptions. Flat budgets imply that the percentage of harvest from roadless areas may change under the alternatives, but aggregate volumes across all NFS land are expected to remain relatively unchanged, on average, implying little potential for adverse impacts to small entities.
For leasable minerals associated energy resources (coal, oil and gas), significant changes in output are projected across alternatives. More than 95 percent of the firms associated with these sectors can be classified as small as defined by Small Business Administration standards. Any changes in oil and gas, or coal development or production can therefore have an effect on small business opportunities in these sectors. A five-county region has been defined to model the economic impacts associated with energy resources (Delta, Garfield, Mesa, Montrose, and Rio Blanco counties). A total of 355 firms associated with oil and gas, and coal development and extraction are estimated to be located within this region, of which 95% are likely to be small (337 firms). However, energy resource sector jobs, supported annually by projected activity within roadless areas, are estimated to increase from 297 under no-action (2001 rule) to 1,481 jobs under the proposed rule. Labor income increases by a similar degree from $17.5 million to $96.2 million per year. There is a slight increase in job numbers under land management plans (1,592 jobs), relative to the proposed rule, but the magnitude of the difference between the two alternatives does not suggest that adverse impacts will be significant if choosing between the proposed rule and land management plans. These results indicate that there is no potential for adverse impacts to small entities associated with energy resource development and extraction under the proposed rule relative to the 2001 rule, and that potential adverse impact under the proposed rule relative to land management plans are not significant.
For all other economic sectors considered, changes in resource outputs are not projected to be significant to the extent that adverse impacts to small entities could occur in aggregate or within regions.
Among 64 counties in the state of Colorado, 36 counties (56%) are considered to be small governments (population less than 50,000). These 36 counties are considered to be small rural counties having NFS lands within IRAs/CRAs. Six counties are energy (coal, oil and gas) producing counties. These six counties (Delta, Garfield, Gunnison, Mesa, Montrose, and Pitkin) are expected to be the counties most likely to benefit from mineral lease payments and revenue sharing under the proposed rule and land management plans. All of these counties, with the exception of Mesa can be considered small governments (population less than 50,000), and all are forecast to receive significant increases in property tax receipts from coal, and oil and gas production, as well as state distributions of severance taxes and federal royalties under the proposed rule and land management plans relative to the no-action alternative. There are slight increases in payments under land management plans, relative to the proposed rule (aggregate payments increase from $6.8 million to $7.7 million per year). Payments associated with the Secure Rural Schools and Self Determination Act (SRSA) and Payments in Lieu of Taxes (PILT) are not expected to change significantly, or any decreases would be largely offset by increases in federal mineral lease payments.
The number of at-risk-communities that may potentially benefit from fuel treatments in the wildland urban interface (WUI) areas are projected to increase under the proposed rule and land management plans relative to the 2001 rule (no-action alternative). The likelihood of tree-cutting or fuel treatments and corresponding reduction in wildfire hazard is projected to increase for a total of 90 at-risk-communities in 16 counties with small populations (<50,000) under the Start Printed Page 43559proposed rule, relative to no-action. Similarly, the likelihood of reduced wildfire hazard is projected to increase for 150 at-risk-communities in 18 small counties under land management plans, compared to no-action. No counties are projected to experience a decrease in the likelihood of road construction or tree-cutting in the WUI under the proposed rule or land management plans, compared to the no action alternative. A total of 10 counties may experience a decrease in the likelihood of tree-cutting or road construction in the WUI under the proposed rule, relative to land management plans. These results indicate that adverse impacts to small governments, in association with protection of values at risk from wildfire, are not likely, when comparing the action alternatives with no-action.
Therefore, for small governments, including counties with small populations and at-risk-communities from wildfire within those counties, opportunities for revenue sharing, as well as protection of values-at-risk are expected to be maintained or increase for all counties under the proposed rule and land management plans compared to no-action conditions under the 2001 rule.
Mitigation measures for small entity impacts associated with the proposed rule are not relevant in many cases, because the proposed rule eases restrictions on a number of activities in many areas, implying increases in potential opportunities for small entities, as noted above. Mitigation measures associated with existing programs and laws regarding revenue sharing with counties and small business shares or set-asides will continue to apply.
Controlling Paperwork Burdens on the Public
This proposed rule does not call for any additional record keeping or reporting requirements or other information collection requirements as defined in 5 CFR part 1320 that are not already required by law or not already approved for use and, therefore, imposes no additional paperwork burden on the public. Accordingly, the review provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et. seq.) and its implementing regulations at 5 CFR part 1320 do not apply.
Regulatory Risk Assessment
This is a proposed major regulation as defined in 7 U.S.C. Section 2204e and a regulatory risk assessment is being prepared. The regulatory risk assessment will be made available during the comment period. A Notice of Availability of the risk assessment will be published in the Federal Register and it will be available at the Forest Service Internet roadless Web site (http://www.roadless.fs.fed.us).
Federalism
The Department has considered this proposed rule under the requirements of Executive Order 13132 issued August 4, 1999 (E.O. 13132), Federalism. The Department has made an assessment that the proposed rule conforms with the Federalism principles set out in E.O. 13132; would not impose any compliance costs on the states; and would not have substantial direct effects on the states, on the relationship between the national government and the states, nor on the distribution of power and responsibilities among the various levels of government. Therefore, the Department concludes that this proposed rule does not have Federalism implications. This proposed rule is based on a petition submitted by the State of Colorado under the Administrative Procedure Act at 5 U.S.C. 553(e) and pursuant to Department of Agriculture regulations at 7 CFR 1.28. The State's petition was developed through a task force with involvement of local governments. The State has been a cooperating agency for the development of this proposed rule. State and local governments are encouraged to comment on this proposed rule, in the course of this rulemaking process.
Consultation With Indian Tribal Governments
The United States has a unique relationship with Indian Tribes as provided in the Constitution of the United States, treaties, and federal statutes. These relationships extend to the Federal government's management of public lands and the Forest Service strives to assure that its consultation with Native American Tribes is meaningful, in good faith, and entered into on a government-to-government basis.
On September 23, 2004, President George W. Bush issued Executive Memorandum Government-to-Government Relationship with Tribal Governments recommitting the Federal government to work with federally recognized Native American Tribal governments on a government-to-government basis and strongly supporting and respecting Tribal sovereignty and self-determination.
Management of roadless areas has been a topic of interest and importance to Tribal governments. During promulgation of the 2001 Roadless Rule, Forest Service line officers in the field were asked to make contact with Tribes to ensure awareness of the initiative and of the rulemaking process. Outreach to Tribes was conducted at the national forest and grassland level, which is how Forest Service government-to-government dialog with Tribes is typically conducted. Tribal representatives remained engaged concerning these issues during the subsequent litigation and rulemaking efforts.
The State's petition identifies that a vital part of its public process in developing its petition were the recommendations and comments received from Native American Tribes. The Governor's office was keenly aware of the spiritual and cultural significance some of these areas hold for the Tribes.
There are two resident tribes in Colorado, both retaining some of their traditional land base as reservations via a series of treaties, agreements, and laws. The Ute Mountain Ute and Southern Ute Tribes (consisting originally of the Weeminuche, Capote, Tabeguache, and Mouaches Bands)—each a “domestic sovereign” nation—have reserved some specific off-reservation hunting rights in Colorado and retain inherent aboriginal rights throughout their traditional territory. Many other tribes located outside Colorado maintain tribal interests, including aboriginal and ceded territories, and retain inherent aboriginal rights within the state.
The Forest Service has been consulting with Colorado-affiliated tribes regarding this proposed rulemaking action and analysis process (see chapter 1). Tribal concerns surfaced during phone or e-mail consultations. Those concerns related to: maintaining existing tribal hunting and access rights within roadless areas, limiting public use of temporary roads, and decommissioning temporary roads after they are no longer needed. Those land uses and management activities would not be affected by the proposed Colorado Roadless Rule; therefore, those concerns are briefly discussed but not analyzed in detail in this EIS. Consultation with interested or affected tribes will continue throughout the analysis and decisionmaking process.
Pursuant to Executive Order 13175 of November 6, 2000, “Consultation and Coordination with Indian Tribal Governments,” the Department has assessed the impact of this proposed rule on Indian Tribal governments and has determined that the proposed rule does not significantly or uniquely affect Indian Tribal government communities. Start Printed Page 43560The proposed rule would establish direction governing the management and protection of Colorado Roadless Areas, however, the proposed rule respects prior existing rights, and it addresses discretionary Forest Service management decisions involving road construction, timber harvest, and some mineral activities. The Department has also determined that this proposed rule does not impose substantial direct compliance costs on Indian Tribal governments. This proposed rule does not mandate Tribal participation in roadless management of the planning of activities in Colorado Roadless Areas. Rather, the Forest Service officials are obligated by other agency policies to consult early with Tribal governments and to work cooperatively with them where planning issues affect Tribal interests.
No Takings Implications
This proposed rule has been analyzed in accordance with the principles and criteria contained in Executive Order 12630 issued March 15, 1988. It has been determined that the proposed rule does not pose the risk of a taking of private property.
Civil Justice Reform
This proposed rule has been reviewed under Executive Order 12988, Civil Justice Reform. After adoption of this proposed rule, (1) all State and local laws and regulations that conflict with this proposed rule or that would impede full implementation of this proposed rule will be preempted; (2) no retroactive effect would be given to this proposed rule; and (3) this proposed rule would not require the use of administrative proceedings before parties could file suit in court challenging its provisions.
Unfunded Mandates
Pursuant to Title II of the Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538), the Department has assessed the effects of this proposed rule on State, local, and Tribal governments and the private sector. This proposed rule does not compel the expenditure of $100 million or more by State, local, or Tribal governments or anyone in the private sector. Therefore, a statement under section 202 of the Act is not required.
Energy Effects
This proposed rule has been reviewed under Executive Order 13211 of May 18, 2001, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use. It has been determined that this proposed rule does not constitute a significant energy action as defined in the executive order.
Based on guidance for implanting EO 13211 (Actions concerning regulations that significantly affect energy supply, distribution and use) issued by Office of Management and Budget (Memorandum for Heads of Executive Departments and Agencies, and Independent Regulatory Agencies (M-01-27), July 13, 2001), this proposed rule would not create significant adverse effects in a material way the productivity, competition, or prices in the energy sector for the reasons discussed below.
The difference in potential natural gas production between the proposed rule and the 2001 Rule (i.e., conditions under the no action alternative) is positive, as is the difference between land management plans and the no action alternative. The only potential adverse impact would be a comparison of potential gas production under the proposed rule and the land management plans alternative; the estimated difference in potential gas production in this case is only 3.6 million mcf and is below the criteria of 25 million mcf under EO 13211. The difference in oil production is approximately 350 barrels, well below the criteria of 4,000 barrels.
Potential coal production is estimated to increase by 4 million tons under the proposed rule as well as the third alternative considered (management of inventoried roadless areas under Land management plans) compared to conditions under the no action alternative (continuance of 2001 Roadless Rule). No adverse outcomes are anticipated in association with energy supply, distribution or use related to coal production.
The proposed rule is expected to result in an increase in potential opportunities for gas production, relative to conditions under the no action alternative (i.e., the 2001 Roadless Rule). When comparing the proposed rule to the third alternative considered (i.e., management of inventoried roadless areas in accordance with relevant Land management plans), there is slight potential for a decrease in opportunities for gas production. However, this decrease (3.6 million mcf) is estimated to be only 0.3% of total gas production from Colorado wells in 2006 (1.21 billion mcf) and is not anticipated to affect regional (or national) productivity, competition, or prices.
No novel legal or policy issues regarding adverse effects to supply, distribution or use of energy are anticipated beyond what has already been addressed in the draft EIS, or the Regulatory Impact Analysis (RIA). None of the proposed corridors designated for oil, gas, and/or electricity under Section 368 of the Energy Policy Act of 2005 are within Colorado Roadless Areas.
The proposed rule does not disturb existing access or mineral rights and restrictions on saleable mineral materials are narrow. The proposed rule also provides regulatory mechanism for consideration of requests for modification of restrictions if adjustments are determined to be necessary in the future. Therefore, this action is not a significant energy action and no Statement of Energy Effects is required.
Start List of SubjectsList of Subjects in 36 CFR Part 294
- National Forests
- Recreation areas
- Navigation (air)
- State petitions for inventoried roadless area management
Therefore, for the reasons set forth in the preamble, the Forest Service proposes to amend part 294 of Title 36 of the Code of Federal Regulations by adding new subpart D to read as follows:
Start PartPART 294—SPECIAL AREAS
* * * * *- 294.30
- Purpose.
- 294.31
- Definitions.
- 294.32
- Colorado Roadless Areas.
- 294.33
- Road construction and reconstruction in Colorado Roadless Areas.
- 294.34
- Prohibition on timber cutting, sale, or removal in Colorado Roadless Areas.
- 294.35
- Oil and gas pipelines.
- 294.36
- Scope and applicability.
- 294.37
- Administrative corrections.
- 294.38
- List of designated Colorado Roadless Areas.
Subpart D—Colorado Roadless Areas Management Subpart D—Colorado Roadless Areas Management
Purpose.The purpose of this subpart is to provide, within the context of multiple-use management, lasting protection for roadless areas within the National Forests in Colorado.
Definitions.The following terms and definitions apply to this subpart.
At-Risk Community: As defined under section 101 of the Healthy Forest Restoration Act (Pub. L. 108-148).
Colorado Roadless Area (CRA): Areas identified in a set of roadless area maps maintained at the national headquarters office of the Forest Service, including Start Printed Page 43561records regarding any corrections or modifications to such maps pursuant to § 294.37.
Community Wildfire Protection Plan (CWPP): As defined under section 101 of the Healthy Forest Restoration Act (Pub. L. 108-148), the term “community wildfire protection plan” means a plan for an at-risk community that:
(1) Is developed within the context of the collaborative agreements and the guidance established by the Wildland Fire Leadership Council and agreed to by the applicable local government, local fire department, and State agency responsible for forest management, in consultation with interested parties and the Federal land management agencies managing land in the vicinity of the at-risk community;
(2) Identifies and prioritizes areas for hazardous fuel reduction treatments and recommends the types and methods of treatment on Federal and non-Federal land that will protect one or more at-risk communities and essential infrastructure; and
(3) Recommends measures to reduce structural ignitability throughout the at-risk community.
Condition Class 3: As defined under section 101 of the Healthy Forests Restoration Act (Pub. L. 108-148) the term “condition class 3” means an area of Federal land, under which:
(1) Fire regimes on land have been significantly altered from historical ranges;
(2) There exists a high risk of losing key ecosystem components from fire;
(3) Fire frequencies have departed from historical frequencies by multiple return intervals, resulting in dramatic changes to:
(i) The size, frequency, intensity, or severity of fires; or
(ii) Landscape patterns; and
(iii) Vegetation attributes have been significantly altered from the historical range of the attributes.
Forest transportation atlas: As defined at 36 CFR 212.1, a display of the system of roads, trails, and airfields of an administrative unit.
Forest road: As defined at 36 CFR 212.1, a road wholly or partly within or adjacent to and serving the National Forest System that the Forest Service determines is necessary for the protection, administration, and utilization of the National Forest System and the use and development of its resources.
Long-term temporary road: A road necessary for oil and gas, or coal operations in CRAs and authorized by contract, permit, lease, or other written authorization. A long-term temporary road is not a forest road, but is included in a forest transportation atlas, and is expected to be in place during the lease period. When no longer needed for the established purpose or upon termination or expiration of the contract, permit, lease or written authorization, whichever is sooner, the road shall be decommissioned and the affected landscape restored.
National Forest System road: As defined at 36 CFR 212.1, a forest road other than a road which has been authorized by a legally documented right-of-way held by a State, county, or other local public road authority.
Off-Highway Vehicles (OHV): As defined at 36 CFR 212.1, any motor vehicle designed for or capable of cross-country travel on or immediately over land, water, sand, snow, ice, marsh, swampland, or other natural terrain.
Responsible official: The Forest Service line officer with the authority and responsibility to make decisions regarding protection and management of CRAs pursuant to this subpart.
Road: As defined at 36 CFR 212.1, a motor vehicle route over 50 inches wide, unless identified and managed as a trail.
Road construction or reconstruction: As defined at 36 CFR 212.1, supervising, inspecting, actual building, and incurrence of all costs incidental to the construction or reconstruction of a road.
Road maintenance: As defined in FSM 7705, the ongoing upkeep of a road necessary to retain or restore the road to the approved road management objective.
Roadless area characteristics: Resources or features that are often present in and characterize CRAs. The enumeration of these resources and features does not constitute in any way the establishment of any legal standard, requirement, or cause for any administrative appeal or legal action related to any project or activity otherwise authorized by this rule. These characteristics include:
(1) High quality or undisturbed soil, water, and air;
(2) Sources of public drinking water;
(3) Diversity of plant and animal communities;
(4) Habitat for threatened, endangered, proposed, candidate, and sensitive species, and for those species dependent on large, undisturbed areas of land;
(5) Primitive, semi-primitive non-motorized, and semi-primitive motorized classes of dispersed recreation;
(6) Reference landscapes;
(7) Natural-appearing landscapes with high scenic quality;
(8) Traditional cultural properties and sacred sites; and
(9) Other locally identified unique characteristics.
Temporary road: A road necessary for emergency operations or authorized by contract, permit, lease, or other written authorization that is not a forest road and that is not included in a forest transportation atlas (ref 36 CFR 212.1), and is not necessary for long-term management. When a temporary road is no longer needed for the established purpose or upon termination or expiration of the lease, contract, or permit, whichever is sooner, it shall be decommissioned and the affected landscape restored.
Utility and water conveyance structures: Facilities associated with the transmission and distribution of utilities and water across National Forest System lands. For purposes of this rule, utilities are existing and future transmission lines used for electrical power and water conveyance structures are existing and future diversion structures, headgates, pipelines, ditches, canals, and tunnels (but shall not include reservoirs).
Wildland-Urban Interface: As defined under section 101 of the Healthy Forest Restoration Act (Pub. L.108-148), the term “wildland-urban interface” means—
(1) An area within or adjacent to an at-risk community that is identified in recommendations to the Secretary in a community wildfire protection plan; or
(2) In the case of any area for which a community wildfire protection plan is not in effect:
(i) An area extending 1/2-mile from the boundary of an at-risk community;
(ii) An area within 11/2-miles of the boundary of an at-risk community, including any land that:
(A) Has a sustained steep slope that creates the potential for wildfire behavior endangering the at-risk community;
(B) Has a geographic feature that aids in creating an effective fire break, such as a road or ridge top; or
(C) Is in condition class 3, as documented by the Secretary in the project-specific environmental analysis; and
(iii) An area that is adjacent to an evacuation route for an at-risk community that the Secretary determines, in cooperation with the at-risk community, requires hazardous fuel reduction to provide safer evacuation from the at-risk community.
Colorado Roadless Areas.(a) Designations. All National Forest System lands within the State of Start Printed Page 43562Colorado identified in § 294.38 are hereby designated as Colorado Roadless Areas (CRAs).
(b) Maps. The Chief of the Forest Service shall maintain and make available to the public a map of each CRA, including records regarding any corrections or modifications to such maps pursuant to § 294.37.
Road construction and reconstruction in Colorado Roadless Areas.(a) General. A road may not be constructed or reconstructed in a CRA except as provided in paragraphs (b) and (c) of this section.
(b) Roads. Notwithstanding the prohibition in paragraph (a) of this section, a road may be constructed or reconstructed in a CRA if the responsible official determines that one of the following circumstances exists:
(1) A road is needed to conduct a response action under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), Section 311 of the Clean Water Act, or the Oil Pollution Act;
(2) A road is needed pursuant to reserved or outstanding rights, authorizations, or as provided for by statute or treaty;
(3) Road realignment is needed to prevent irreparable resource damage that arises from the design, location, use, or deterioration of a forest road and that cannot be mitigated by road maintenance;
(4) Road reconstruction is needed to implement a road safety improvement project on a forest road determined to be hazardous on the basis of accident experience or accident potential on that road;
(5) The Secretary of Agriculture determines that a Federal Aid Highway project, authorized pursuant to Title 23 of the United States Code, is in the public interest or is consistent with the purposes for which the land was reserved or acquired and no other reasonable and prudent alternative exists;
(6) Consistent with applicable land management plan, a road is needed to allow for construction, reconstruction, or maintenance of existing or future authorized utility and water conveyance structures as defined by this rule in section § 294.31.
(7) Consistent with applicable land management plan and allotment management plans, a road is needed for the management of livestock grazing.
(c) Temporary Road (including Long-Term Temporary Road).
(1) Notwithstanding the prohibition in paragraph (a) of this section, a temporary road may be constructed or reconstructed in a CRA as set forth in subparagraphs 1 through 4.
(2) For all temporary roads authorized under this rule, the responsible official may only consider construction of a temporary road after reviewing and rejecting other access options, resource and community protection needs, and consistency with applicable forest plans. If it is determined that a temporary road is needed, construction must be conducted in a manner that minimizes effects on surface resources, prevents unnecessary or unreasonable surface disturbances, and complies with all applicable land management plan directions, regulations, and laws. When a temporary road is no longer needed (for the established purpose) or upon termination or expiration of a contract, authorization, or permit, whichever is sooner, all temporary roads shall be decommissioned and the affected landscape restored. Restoration shall be designed considering safety, costs, and impacts on land and resources (16 U.S.C. 1608) to achieve complete stabilization and restoration to a condition generally consistent with the pre-existing roadless characteristics. Except as allowed under this rule in § 294.33(b), a temporary road shall not change designation to a forest road, nor will the construction of a temporary road, including long-term temporary road alter the management status of any designated CRA. A temporary road constructed for oil and gas, or coal related activities may include as part of its established purpose, the potential need to be used as a long-term temporary road.
(3) A temporary road is needed for treatment actions and in areas identified in a community wildfire protection plan or, if a community wildfire protection plan is not present, within areas of the wildland-urban interface; or
(4) A temporary road is needed for public health and safety in cases of threat of flood, fire, or other potential catastrophic event that, without intervention, would cause the loss of life or property; or
(5) A temporary or long-term temporary road is needed in conjunction with an oil and gas lease, including the construction of infrastructure necessary to transport the product, on lands that are under lease by the Secretary of the Interior as of the effective date of this rule. The Forest Service shall not agree to waive, except, modify or otherwise remove any oil and gas lease stipulation that prohibits or restricts road building or otherwise prohibits surface occupancy within CRAs; or
(6) A temporary or long-term temporary road is needed for coal exploration and coal-related surface activities for certain lands within CRAs in the North Fork coal mining area of the Grand Mesa, Uncompahgre, and Gunnison National Forests as defined by the North Fork coal mining area map within the Colorado Roadless Area Conservation Rule environmental impact statement. Such roads may also be used for the purpose of collecting and transporting coal mine methane. All infrastructure needed for the capture of methane will be located within the road right-of-way of coal-related temporary and/or long-term temporary roads or within areas of surface disturbance for methane venting wells otherwise needed for coal mining purposes. No additional roads shall be constructed to facilitate capture of coal mine methane. When a road is no longer needed for coal mining purposes or coal mine methane capture, the road shall be decommissioned and the affected landscape restored.
(d) Road Closures. All roads constructed pursuant to paragraphs (b) and (c) shall be closed to motorized vehicles (including OHVs) unless specifically used for the purpose for which the road was established; except the use of motor vehicles for administrative use by the Forest Service; emergency access for fire and law enforcement purposes; motor vehicle use that is specifically authorized under a written authorization issued under Federal law or regulations; or motor vehicle use by any fire, emergency, or law enforcement personnel.
(e) Environmental Documentation. An EIS will be prepared pursuant to section 102 of the National Environmental Policy Act and 40 CFR 1500 for any proposed action or alternative that includes constructing a forest road within a CRA. A no-road and a temporary road alternative shall be considered in the EIS. For projects proposing temporary roads within a CRA, an environmental analysis will be documented pursuant to the Council on Environmental Quality regulations at 40 CFR 1500-1508 and will include a no-road option.
(f) Road Maintenance. Maintenance of forest roads and NFS roads is permissible in CRAs.
Prohibition on tree cutting, sale, or removal in Colorado Roadless Areas.(a) Trees may not be cut, sold, or removed in CRAs, except as provided in paragraph (b) of this section.
(b) Notwithstanding the prohibition in paragraph (a) of this section, trees may be cut, sold, or removed in CRAs if the Start Printed Page 43563responsible official determines that one of the following circumstances exists and the activity is consistent with the applicable forest plan.
(1) The cutting, sale, or removal of trees is needed for one of the following purposes:
(i) For management and improvement of wildlife and plant species (including threatened, endangered, proposed, or sensitive species) in coordination with the Colorado Department of Natural Resources, including the Colorado Division of Wildlife. Such activities should be designed to maintain or improve roadless characteristics as defined by this rule.
(ii) To reduce the hazard of wildfire effects or large-scale insect and disease outbreaks, in areas covered by and as provided in a community wildfire protection plan or, if a community wildfire protection plan is not present, within areas of the wildland urban interface. Consistent with the purposes of this paragraph, the responsible official shall implement projects to reduce the wildfire hazard to communities after careful consideration to roadless area characteristics as defined by this rule.
(2) The cutting, sale, or removal of trees is incidental to the implementation of a management activity not otherwise prohibited by this subpart; or
(3) The cutting, sale, or removal of trees is needed and appropriate for personal or administrative use, as provided for in 36 CFR 223.
(c) In authorizing the cutting, selling, or removal of trees within a CRA, the responsible official shall consider the need for the cutting, sale, or removal of trees along with other resource and community protection needs and effects to roadless characteristics.
Oil and Gas Pipelines.The construction of permanent or temporary pipelines for the purposes of transporting oil or gas through a CRA, from a source or sources located exclusively outside of a CRA, shall be prohibited after [final rule effective date] of the rule and shall not be excepted, allowed, or otherwise authorized.
Scope and applicability.(a) This subpart does not revoke, suspend, or modify any permit, contract, or other legal instrument authorizing the occupancy and use of NFS land issued prior to [final rule effective date].
(b) This subpart does not revoke, suspend, or modify any project or activity decision made prior to [final rule effective date].
(c) This subpart does not compel the amendment or revision of any land management plan.
(d) The prohibitions and restrictions established in this subpart are not subject to reconsideration, revision, or rescission in subsequent project decisions or land management plan amendments or revisions undertaken pursuant to 36 CFR part 219. Nothing in this rule shall be construed as limiting the authority of a responsible official to establish additional restrictions regarding any management activities, including matters covered by this rule, within CRAs through a land management plan amendment or revision undertaken pursuant to 36 CFR Part 219.
(e) When the Forest Service is the lead agency, the Forest Service will offer cooperating agency status to the State of Colorado, pursuant to the Council on Environmental Quality regulations at 40 CFR 1500-1508 for all proposed projects and planning activities to be implemented on lands within CRAs, and those ski area acres identified in Table 50 of the Rulemaking for Colorado Roadless Areas final EIS. Where the Forest Service does not have the authority to offer cooperating agency status, the Forest Service shall coordinate with the State.
(f) Nothing in this rule shall be construed as expressly or implicitly affecting the current or future management of existing trails or existing roads in CRAs. Decisions concerning the future management and/or status of existing roads or trails within CRAs under this rule shall be made during the applicable forest travel management processes.
(g) Nothing in this rule shall be construed as limiting the authority of the Forest Service to issue grazing permits on lands within a CRA. An area's classification as a CRA shall not, by itself, be reason to not authorize grazing.
(h) If any provision this subpart or its application to any person or to certain circumstances is held invalid, the remainder of the regulations in this subpart and their application remain in force.
(i) After [final rule effective date] the rule promulgated on January 12, 2001, (66 F.R. 3244) shall have no effect within the State of Colorado.
Administrative corrections.Correction or modification of designations made pursuant to this rule may occur under the following circumstances, after coordination with the State:
(a) Administrative Corrections. Administrative corrections to the maps of lands identified in § 294.32(b) include, but are not limited to, adjustments that remedy clerical, typographical, mapping errors, or improvements in mapping technology. The Chief of the Forest Service may issue administrative corrections after 30 days public notice and opportunity to comment.
(b) Modifications. The Chief may add to, remove from, or modify the designations listed in § 294.38 based on changed circumstances or public need. The Chief shall provide at least 60 days public notice and opportunity to comment for all modifications.
List of Designated Colorado Roadless Areas.Arapaho-Roosevelt National Forest 1 Bard Creek 2 Byers Peak 3 Cache La Poudre Adjacent Area 4 Cherokee Park 5 Comanche Peak Adjacent Areas 6 Copper Mountain 7 Crosier Mountain 8 Gold Run 9 Green Ridge—East 10 Green Ridge—West 11 Grey Rock 12 Hell Canyon 13 Indian Peaks Adjacent Areas 14 James Peak 15 Kelly Creek 16 Lion Gulch 17 Mount Evans Adjacent Areas 18 Mount Sniktau 19 Neota Adjacent Area 20 Never Summer Adjacent Area 21 North Lone Pine 22 North St. Vrain 23 Rawah Adjacent Area 24 Square Top Mountain 25 Troublesome 26 Vasquez Adjacent Area 27 White Pine Mountain 28 Williams Fork Grand Mesa, Uncompahgre, Gunnison National Forest 29 Agate Creek 30 American Flag Mountain 31 Baldy 32 Battlements 33 Beaver 34 Beckwiths 35 Calamity Basin 36 Cannibal Plateau 37 Canyon Ck/Antero 38 Carson 39 Castle 40 Cataract 41 Cimarron Ridge 42 Clear Fork 43 Cochetopa Creek 44 Cochetopa Hills 45 Cottonwoods 46 Crystal Peak Start Printed Page 43564 47 Curecanti 48 Currant Creek 49 Deer Creek 50 Dominguez 51 Double Top 52 East Elk 53 Electric Mountain 54 Failes Creek/Soldier Creek 55 Flat Irons 56 Flattops/Elk Park 57 Gothic 58 Granite Basin 59 Hope Lake 60 Horse Ranch Park 61 Horsefly Canyon 62 Huntsman Ridge 63 Italian Mountain 64 Johnson Basin 65 Kannah Creek 66 Kelso Mesa 67 Last Dollar/Sheep Creek 68 Little Cimarron 69 Long Canyon 70 Matchless Mountain 71 Matterhorn 72 Mendicant 73 Mirror Lake 74 Mount Lamborn 75 Munsey Creek/Erickson Springs 76 Naturita Canyon 77 Pilot Knob 78 Poverty Gulch 79 Salt Creek 80 Sanford Basin 81 Sawtooth 82 Soap Creek 83 Steuben 84 Sunnyside 85 Sunset 86 Texas Creek 87 Tomahawk 88 Turner Creek 89 Turret Ridge 90 Unaweep 91 Union Park 92 Whetstone 93 Whitehouse Mountain 94 Wilson 95 Windy Point Manti-La Sal National Forest 96 Roc Creek Pike-San Isabel National Forest 97 Aspen Ridge 98 Badger Creek 99 Boreas 100 Buffalo Peaks East 101 Buffalo Peaks South 102 Buffalo Peaks West 103 Burning Bear 104 Chipeta 105 Cuchara North 106 Cuchara South 107 Elk Mountain-Collegiate North 108 Elk Mountain-Collegiate South 109 Elk Mountain-Collegiate West 110 Farnum 111 Green Mountain 112 Greenhorn Mountain: Badito Cone to Dry Creek 113 Greenhorn Mountain: Cisneros Creek to Upper Turkey Creek 114 Greenhorn Mountain: Graneros Creek to Section 10 115 Greenhorn Mountain: Little Saint Charles Creek to Greenhorn Creek 116 Gunbarrel 117 Hardscrabble 118 Highline 119 Holy Cross 120 Jefferson 121 Kreutzer-Princeton 122 Lost Creek East 123 Lost Creek South 124 Lost Creek West 125 Methodist Mountain 126 Mount Antero 127 Mount Elbert 128 Mount Evans 129 Mount Massive 130 Pikes Peak East 131 Pikes Peak West 132 Porphyry Peak 133 Puma Hills 134 Purgatoire 135 Rampart East 136 Rampart West 137 Romley 138 Saint Charles Peak 139 Sangre de Cristo: Alvarado Campground to Music Pass 140 Sangre de Cristo: Blanca Peak to Slide Mountain 141 Sangre de Cristo: Lake Creek to Hermit Creek 142 Sangre de Cristo: Medano Pass to Carbonate Mountain 143 Sangre de Cristo: Silverheels Gulch to Hunts Creek 144 Sangre de Cristo: West Creek to Big Cottonwood 145 Scraggy Peaks 146 Sheep Rock 147 Silverheels 148 Spanish Peaks 149 Square Top Mountain 150 Starvation Creek 151 Tanner Peak 152 Thirtynine Mile Mountain 153 Thunder Butte 154 Weston Peak Rio Grande National Forest 155 Alamosa River 156 Antora Meadows/Bear Creek 157 Beartown 158 Beaver Mountain 159 Bennet Mountain/Blowout/Willow Creek/Lion Point/Greenie Mountain 160 Big Buck/Kitty/Ruby 161 Box/Road Canyon 162 Bristol Head 163 Butterfly 164 Chama Basin 165 Conejos River/Lake Fork 166 Copper Mountain/Sulphur 167 Cotton Creek 168 Crestone 169 Cumbres 170 Deep Creek/Boot Mountain 171 Dorsey Creek 172 Elkhorn Peak 173 Four Mile Creek 174 Fox Creek 175 Fox Mountain 176 Gibbs Creek 177 Gold Creek/Cascade Creek 178 Hot Springs 179 Indian Ridge 180 Kitty Creek 181 La Garita 182 Lake Fork 183 Lower East Bellows 184 Middle Alder 185 Miller Creek 186 Pole Creek 187 Pole Mountain/Finger Mesa 188 Red Mountain 189 Ruby Lake 190 Sawlog 191 Sheep Mountain 192 Silver Lakes/Stunner 193 Snowshoe Mountain 194 Spectacle Lake 195 Spruce Hole/Sheep Creek 196 Stunner Pass/Dolores Canyon 197 Sulphur Tunnel 198 Summit Peak/Elwood Pass 199 Taylor Canyon 200 Tewksberry 201 Tobacco Lakes 202 Trout Mountain/Elk Mountain 203 Ute Pass 204 Wason Park 205 Wightman Fork/Upper Burro 206 Wightman Fork To Lookout 207 Willow Mountain Routt National Forest 208 Barber Basin 209 Black Mountain 210 Bunker Basin 211 Bushy Creek 212 Chatfield 213 Chedsey Creek 214 Dome 215 Dome Peak 216 Elkhorn 217 Gold Creek 218 Grizzly Helena 219 Kettle Lakes 220 Little Green Creek 221 Long Park 222 Mad Creek 223 Morrison Creek 224 Never Summer North 225 Never Summer South 226 Nipple Peak North 227 Nipple Peak South 228 Pagoda Peak 229 Shield Mountain 230 South Fork 231 Sugarloaf North 232 Sugarloaf South 233 Troublesome North 234 Troublesome South 235 Walton Peak 236 Whalen Creek San Juan National Forest 237 Baldy 238 Blackhawk Mountain 239 East Animas 240 Fish Creek 241 Florida River 242 Graham Park 243 HD Mountains 244 Hermosa 245 Lizard Head Adjacent 246 Piedra Area Adjacent 247 Runlett Park 248 Ryman Start Printed Page 43565 249 San Miguel 250 South San Juan Adjacent 251 Storm Peak 252 Treasure Mountain 253 Turkey Creek 254 Weminuche Adjacent 255 West Needles White River National Forest 256 Adam Mountain 257 Ashcroft 258 Assignation Ridge 259 Baldy Mountain 260 Basalt Mountain A 261 Basalt Mountain B 262 Berry Creek 263 Big Ridge to South Fork A 264 Big Ridge to South Fork B 265 Black Lake East 266 Black Lake West 267 Blair Mountain 268 Boulder 269 Budges 270 Buffer Mountain 271 Burnt Mountain 272 Chicago Ridge 273 Corral Creek 274 Crystal River 275 Deep Creek 276 Dome Peak 277 East Divide/Four Mile Park 278 East Vail 279 East Willow 280 Elk Creek B 281 Elliot Ridge 282 Fawn Creek/Little Lost Park 283 Freeman Creek 284 Gallo Hill 285 Game Creek 286 Grizzly Creek 287 Gypsum Creek 288 Hardscrabble 289 Hay Park 290 Holy Cross City 291 Homestake 292 Hoosier Ridge 293 Housetop Mountain 294 Hunter 295 Little Grand Mesa 296 Lower Piney 297 Mamm Peak 298 Maroon East 299 Maryland Creek 300 McClure Pass 301 McFarlane 302 Meadow Mountain A 303 Meadow Mountain B 304 Morapos A 305 Morapos B 306 Mormon Creek 307 No Name 308 North Elk 309 North Independent A 310 North Independent B 311 North Woody 312 Pagoda Peak 313 Piney Lake 314 Porcupine Peak 315 Ptarmigan A 316 Ptarmigan B 317 Ptarmigan C 318 Ptarmigan Hill A 319 Ptarmigan Hill B 320 Red Dirt A 321 Red Dirt B 322 Red Mountain 323 Red Table 324 Reno Mountain 325 Ripple Creek Pass/Trappers Lake 326 Ryan Gulch 327 Salt Creek 328 Sloan Peak 329 Spraddle Creek A 330 Spraddle Creek B 331 Sweetwater A 332 Sweetwater B 333 Tenderfoot Mountain 334 Tenmile 335 Thompson Creek 336 Tigiwon 337 Treasure Mountain 338 West Brush Creek 339 West Lake Creek 340 Wildcat Mountain 341 Wildcat Mountain B 342 Wildcat Mountain C 343 Williams Fork 344 Willow 345 Woods Lake Dated: July 21, 2008.
Abigail R. Kimbell,
Chief, U.S. Forest Service.
BILLING CODE 3410-11-P
BILLING CODE 3410-11-C
[FR Doc. E8-17109 Filed 7-24-08; 8:45 am]
BILLING CODE 3410-11-P
Document Information
- Published:
- 07/25/2008
- Department:
- Forest Service
- Entry Type:
- Proposed Rule
- Action:
- Notice of proposed rulemaking; request for comment.
- Document Number:
- E8-17109
- Dates:
- Comments must be received in writing 90 days from the date the rule is published in the Federal Register.
- Pages:
- 43543-43565 (23 pages)
- RINs:
- 0596-AC74: Special Areas; State-Specific Inventoried Roadless Area Management: Colorado
- RIN Links:
- https://www.federalregister.gov/regulations/0596-AC74/special-areas-state-specific-inventoried-roadless-area-management-colorado
- Topics:
- National forests, Navigation (air), Recreation and recreation areas
- PDF File:
- e8-17109.pdf
- CFR: (9)
- 36 CFR 294.30
- 36 CFR 294.31
- 36 CFR 294.32
- 36 CFR 294.33
- 36 CFR 294.34