2019-15795. Approval and Promulgation of Air Quality Implementation Plans; State of Utah; Revisions to Nonattainment Permitting Regulations  

  • Start Preamble

    AGENCY:

    Environmental Protection Agency (EPA).

    ACTION:

    Final rule.

    SUMMARY:

    The Environmental Protection Agency (EPA) is taking final action to approve State Implementation Plan (SIP) revisions submitted by the State of Utah on March 27, 2014, and August 7, 2018. The submittals revise the portions of the Utah Administrative Code (UAC) that pertain to the issuance of Utah air quality permits for major sources in nonattainment areas. This action is being taken under the Clean Air Act (CAA or Act).

    DATES:

    This final rule is effective on August 26, 2019.

    ADDRESSES:

    The EPA has established a docket for this action under Docket ID No. EPA-R08-OAR-2019-0063. All documents in the docket are listed on the http://www.regulations.gov website. Although listed in the index, some information is not publicly available, e.g., confidential business information (CBI) or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the internet and will be publicly available only in hard copy form. Publicly available docket materials are available through http://www.regulations.gov,, or please contact the person identified in the For Further Information Contact section for additional availability information.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Kevin Leone, Air and Radiation Division, EPA, Region 8, Mailcode 8ARD-QP, 1595 Wynkoop Street, Denver, Colorado 80202-1129, (303) 312-6227, leone.kevin@epa.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Throughout this document “we,” “us,” and “our” means the EPA.

    I. Background

    The EPA is taking final action to fully approve two revisions submitted by the State of Utah on March 27, 2014, and August 7, 2018. The EPA published a proposed rulemaking for these submittals on June 5, 2019 (84 FR 26049). As stated in our proposed rulemaking, Utah submitted revisions to their nonattainment New Source Review (NNSR) permitting program on August 20, 2013. The August 20, 2013 submittal added volatile organic compounds (VOCs) as a fine particulate matter (PM2.5) precursor to the NNSR program; however, the submittal did not establish a significant emissions rate (SER) for VOC to determine when a modification at an existing major source would be a major modification subject to NNSR review. On March 27, 2014, Utah submitted a revision to address the omission and establish the VOC SER. The EPA determined that Utah needed to submit further revisions to address the remaining deficiencies in the NNSR permitting program in order for the EPA to fully approve Utah's August 20, 2013 submittal. These deficiencies are outlined in our proposed rulemaking.

    On September 30, 2016 Utah submitted to the EPA a letter committing to address the remaining deficiencies in the State's nonattainment permitting program in R307-403 that were not addressed in the August 20, 2013 submittal (see docket). Based on the September 30, 2016 commitment letter, on February 3, 2017 (82 FR 918), the EPA conditionally approved Utah's August 20, 2013 submittal. On October 5, 2017 (82 FR 46417), we approved a June 29, 2017 submittal that, among other things, addressed the deficiency in R307-403-6 identified in our conditional approval.

    On August 7, 2018, Utah submitted further revisions to address the remaining deficiencies in their NNSR program. This submittal also provides a technical demonstration for exempting ammonia as a PM2.5 precursor in the Logan, Utah-Idaho PM2.5 nonattainment areas and a technical basis for setting an ammonia SER of 70 tons per year in the Salt Lake City and Provo PM2.5 nonattainment areas.

    We provided a detailed explanation of the basis for our proposed approval in our June 5, 2019, rulemaking, which will not be restated here. See 84 FR 26049. We invited comment on all aspects of our proposal and provided a 30-day comment period. The comment period ended on July 5, 2019.

    II. Response to Comments

    We received no comments during the public comment period.

    III. Final Action

    As outlined in our proposed rulemaking, the EPA is taking final action to approve the addition of new and revised rules and renumbering to rules R307-101 and R307-403 that were submitted by Utah on March 27, 2014 and August 7, 2018. This final action, in tandem with our October 5, 2017 approval of R307-403-6, converts the Start Printed Page 35832February 3, 2017 conditional approval to a full approval.

    Specifically, we are taking final action to approve the following revisions: R307-101 (General Requirements)—R307-101-2 (Definitions); R307-403 (Permits: New and Modified Sources in Nonattainment Areas and Maintenance Areas)—R307-403-1 (Purpose and Definitions): R307-403-1(1)-(3), R307-403-1(4)(b), R307-403-1(4)(c); R307-403-2 (Applicability): R307-403-2(1), R307-403-2(6)(d); R307-403-2(10); R307-403-2(10)(a)-(c); R307-403-2(13); R307-403-3 (Review of Major Sources of Air Quality Impact): R307-403-3, R307-403-3(1), R307-403-3(3), R307-403-3(3)(a), R307-403-3(c), R307-403-3(d), R307-403-3(3)(e); R307-403-4 (Offsets: General Requirements): R307-403-4(1), R307-403-4(2), R307-403-4(3), R307-403-4(4); R307-403-5 (Offsets: Particulate Matter Nonattainment Areas): R307-403-5(1), R307-403-5(1)(a), R307-403-5(1)(b), R307-403-5(1)(c), R307-403-5(1)(d), R307-403-5(1)(e), R307-403-5(2), R307-403-5(2)(a), R307-403-5(2)(b), R307-403-5(2)(b)(i)-(iii), R307-403-5(2)(d), R307-403-5(4)(a), R307-403-5(4)(b), R307-403-5(4)(d), R307-403-5(e), R307-403-5(f); R307-403-7 (Offsets: Baseline); and R307-403-9 (Construction in Stages).

    IV. Incorporation by Reference

    In this document, the EPA is finalizing regulatory text that includes incorporation by reference. In accordance with requirements of 1 CFR 51.5, the EPA is finalizing the incorporation by reference of the State of Utah's revisions to its State Implementation Plan as described in section III. of this preamble. The EPA has made, and will continue to make, these materials generally available through www.regulations.gov and at the EPA Region 8 Office (please contact the person identified in the FOR FURTHER INFORMATION CONTACT section of this preamble for more information). Therefore, these materials have been approved by the EPA for inclusion in the SIP, have been incorporated by reference by the EPA into that plan, are fully federally enforceable under sections 110 and 113 of the CAA as of the effective date of the final rulemaking of the EPA's approval, and will be incorporated by reference in the next update to the SIP compilation.[1]

    V. Statutory and Executive Order Reviews

    Under the Clean Air Act, the Administrator is required to approve a SIP submission that complies with the provisions of the Act and applicable Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, the EPA's role is to approve state choices, provided that they meet the criteria of the Clean Air Act. Accordingly, this action merely approves state law as meeting Federal requirements and does not impose additional requirements beyond those imposed by state law. For that reason, this action:

    • Is not a “significant regulatory action” subject to review by the Office of Management and Budget under Executive Orders 12866 (58 FR 51735, October 4, 1993) and 13563 (76 FR 3821, January 21, 2011);
    • Is not an Executive Order 13771 (82 FR 9339, February 2, 2017) regulatory action because SIP approvals are exempted under Executive Order 12866;
    • Does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
    • Is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.);
    • Does not contain any unfunded mandate or significantly or uniquely affect small governments, described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4);
    • Does not have federalism implications as specified in Executive Order 13132 (64 FR 43255, August 10, 1999);
    • Is not an economically significant regulatory action based on health or safety risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997);
    • Is not a significant regulatory action subject to Executive Order 13211 (66 FR 28355, May 22, 2001);
    • Is not subject to requirements of section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the CAA; and
    • Does not provide the EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, under Executive Order 12898 (59 FR 7629, February 16, 1994).

    In addition, the SIP is not approved to apply on any Indian reservation land or in any other area where the EPA or an Indian tribe has demonstrated that a tribe has jurisdiction. In those areas of Indian country, the rule does not have tribal implications and will not impose substantial direct costs on tribal governments or preempt tribal law as specified by Executive Order 13175 (65 FR 67249, November 9, 2000).

    The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. The EPA will submit a report containing this action and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. A major rule cannot take effect until 60 days after it is published in the Federal Register. This action is not a “major rule” as defined by 5 U.S.C. 804(2).

    Under section 307(b)(1) of the Clean Air Act, petitions for judicial review of this action must be filed in the United States Court of Appeals for the appropriate circuit by September 23, 2019. Filing a petition for reconsideration by the Administrator of this final rule does not affect the finality of this action for the purposes of judicial review nor does it extend the time within which a petition for judicial review may be filed, and shall not postpone the effectiveness of such rule or action. This action may not be challenged later in proceedings to enforce its requirements. (See section 307(b)(2).)

    Start List of Subjects

    List of Subjects in 40 CFR Part 52

    • Environmental protection
    • Air pollution control
    • Incorporation by reference
    • Intergovernmental relations
    • Nitrogen dioxide
    • Ozone
    • Particulate matter
    • Reporting and recordkeeping requirements
    • Volatile organic compounds
    End List of Subjects Start Signature

    Dated: July 19, 2019.

    Gregory Sopkin,

    Regional Administrator, Region 8.

    End Signature

    40 CFR part 52 is amended as follows:

    Start Part

    PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS

    End Part Start Amendment Part

    1. The authority for citation for part 52 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 42 U.S.C. 7401 et seq.

    End Authority

    Subpart TT—Utah

    Start Amendment Part

    2. Section 52.2320(c) is amended in the table: Start Printed Page 35833

    End Amendment Part Start Amendment Part

    a. Under the centered heading “R307-101. General Requirements,” by revising the entry for “R307-101-2.”

    End Amendment Part Start Amendment Part

    b. Under the centered heading “R307-403. Permits: New and Modified Sources in Nonattainment Areas and Maintenance Areas”:

    End Amendment Part Start Amendment Part

    i. By revising the entries for “R307-403-1” and “R307-403-2;”

    End Amendment Part Start Amendment Part

    ii. By adding in numerical order entries for “R307-403-3;” “R307-403-4;” and “R307-403-5;”

    End Amendment Part Start Amendment Part

    iii. By revising the entry for “R307-403-6;”

    End Amendment Part Start Amendment Part

    iv. By adding in numerical order entries for “R307-403-7” and “R307-403-9;” and

    End Amendment Part Start Amendment Part

    v. By revising the entries for “R307-403-10” and “R307-403-11.”

    End Amendment Part

    The revisions and additions read as follows:

    Identification of plan.
    * * * * *

    (c) * * *

    Rule No.Rule titleState effective dateFinal rule citation, dateComments
    R307-101. General Requirements
    *         *         *         *         *         *         *
    R307-101-2Definitions08/02/2018[Insert Federal Register citation], 7/25/2019.
    *         *         *         *         *         *         *
    R307-403. Permits: New and Modified Sources in Nonattainment Areas and Maintenance Areas
    *         *         *         *         *         *         *
    R307-403-1Purpose and Definitions08/02/2018 12/04/2013[Insert Federal Register citation], 7/25/2019
    R307-403-2Applicability08/02/2018[Insert Federal Register citation], 7/25/2019
    R307-403-3Review of Major Sources of Air Quality Impact08/02/2018[Insert Federal Register citation], 7/25/2019
    R307-403-4Offsets: General Requirements08/02/2018[Insert Federal Register citation], 7/25/2019
    R307-403-5Offsets: Particulate Matter Nonattainment Areas08/02/2018[Insert Federal Register citation], 7/25/2019
    R307-403-6Offsets: Ozone Nonattainment Areas08/02/2018[Insert Federal Register citation], 7/25/2019
    R307-403-7Offsets: Baseline08/02/2018[Insert Federal Register citation], 7/25/2019
    R307-403-9Construction in Stages08/02/2018[Insert Federal Register citation], 7/25/2019
    R307-403-10Analysis of Alternatives08/02/2018[Insert Federal Register citation], 7/25/2019
    R307-403-11Actual PALS08/02/2018[Insert Federal Register citation], 7/25/2019
    *         *         *         *         *         *         *
    * * * * *
    End Supplemental Information

    Footnotes

    1.  62 FR 27968 (May 22, 1997).

    Back to Citation

    [FR Doc. 2019-15795 Filed 7-24-19; 8:45 am]

    BILLING CODE 6560-50-P

Document Information

Effective Date:
8/26/2019
Published:
07/25/2019
Department:
Environmental Protection Agency
Entry Type:
Rule
Action:
Final rule.
Document Number:
2019-15795
Dates:
This final rule is effective on August 26, 2019.
Pages:
35831-35833 (3 pages)
Docket Numbers:
EPA-R08-OAR-2019-0063, FRL-9996-96-Region 8
Topics:
Air pollution control, Environmental protection, Incorporation by reference, Intergovernmental relations, Nitrogen dioxide, Ozone, Particulate matter, Reporting and recordkeeping requirements, Volatile organic compounds
PDF File:
2019-15795.pdf
Supporting Documents:
» Utah IBR Matrial
» Utah DEQ_ Notices_ DAQ_ Rule and Plan Changes_Logan Ammonia Proof of Public Comment
» Logan sensitivity Analysis
» Logan Moderate NNSR
» Utah ATX 231 submittal
» Utah nonattainment submittal Aug 2018 part 2
» Utah nonattainment submittal Aug 2018 Part 1
CFR: (1)
40 CFR 52.2320