[Federal Register Volume 60, Number 143 (Wednesday, July 26, 1995)]
[Notices]
[Pages 38319-38322]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-18329]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. ER95-135-001, et al.]
Allegheny Power Service Corporation, et al.; Electric Rate and
Corporate Regulation Filings
July 19, 1995.
Take notice that the following filings have been made with the
Commission:
1. Allegheny Power Service Corporation on behalf of Monongahela Power
Company The Potomac Edison Company and West Penn Power Company (the APS
Companies)
[Docket No. ER95-135-001]
Take notice that on June 30, 1995, Allegheny Power Service
Corporation on behalf of Monongahela Power Company, The Potomac Edison
Company and West Penn Power Company (``the APS Companies'') filed
amendments to comply with a Commission Order on filing rates for
emission allowances. Allegheny Power Service Corporation requests
waiver of notice requirements and asks the Commission to honor the
proposed January 1, 1995 effective date specified in Docket No. ER95-
135-000.
Copies of the filing have been provided to the Public Utilities
Commission of Ohio, the Pennsylvania Public Utility Commission, the
Maryland Public Service Commission, the Virginia State Corporation
Commission, the West Virginia Public Service Commission, and all
parties of record.
Comment date: August 2, 1995, in accordance with Standard Paragraph
E at the end of this notice.
2. Kentucky Utilities Company
[Docket No. ER95-529-000]
Take notice that on July 11, 1995, Kentucky Utilities Company (KU),
tendered for filing an amendment to its filing in the above-referenced
docket regarding the inclusion of the cost of emission allowances
associated with coordination sets.
Comment date: August 2, 1995, in accordance with Standard Paragraph
E at the end of this notice.
3. PJM Interconnection Association
[Docket Nos. ER95-564-000 ER95-565-000 ER95-566-000 ER95-567-000 and
ER95-568-000]
Take notice that on June 27, 1995, the Pennsylvania-New Jersey-
Maryland (PJM) Interconnection Association filed, on behalf of the
signatories to PJM Interconnection Agreement, amended versions of
Exhibit A in each of the subject dockets to explain the treatment of
the costs of emission allowances in energy sales.
Comment date: August 2, 1995, in accordance with Standard Paragraph
E at the end of this notice.
4. Wisconsin Public Service Corporation
[Docket No. ER95-576-001]
Take notice that Wisconsin Public Service Corporation (WPSC), of
Green Bay, Wisconsin on June 30, 1995, tendered for filing revisions to
its SO2 emission allowance procedures in compliance with the
Commission's June 2, 1995 order accepting WPSC's February 8, 1995
emissions allowance filing. WPSC asks that its emission allowance rate
become effective on July 1, 1995 rather than January 1, 1995 as
specified in the Commission's June 2, 1995 order.
WPSC states that the filing has been served on the affected parties
and posted as required by the Commission's Regulations.
Comment date: August 2, 1995, in accordance with Standard Paragraph
E at the end of this notice.
5. Maine Public Service Company
[Docket No. ER95-836-001]
Take notice that on June 30, 1995, Maine Public Service Company
tendered for filing its compliance filing in the above-referenced
docket.
Comment date: August 2, 1995, in accordance with Standard Paragraph
E at the end of this notice.
6. Northern Indiana Public Service Company
[Docket No. ER95-902-000]
Take notice that on July 14, 1995, Northern Indiana Public Service
Company tendered for filing an amendment in the above-referenced
docket.
Comment date: August 2, 1995, in accordance with Standard Paragraph
E at the end of this notice.
7. Orange and Rockland Utilities, Inc.
[Docket No. ER95-1026-000]
Take notice that on July 6, 1995, Orange and Rockland Utilities,
Inc. (O&R) tendered for filing an Amendment to its agreement with Enron
Power Marketing, Inc, (EPMI) to provide for the purchase or sale by
either party of energy and capacity and whereby the sale by O&R is
subject to cost based ceiling rates. The ceiling rate for O&R energy is
100 percent of O&R's Incremental Cost (SIC) plus up to 10 percent of
the SIC (where such 10 percent is limited to 1 mill per Kwhr when the
SIC in the hour reflects a purchased power resource). The ceiling rate
for capacity sold by O&R is $14.79 per megawatt hour.
O&R states that a copy of this filing has been served by mail upon
EPMI.
Comment date: August 2, 1995, in accordance with Standard Paragraph
E at the end of this notice.
8. Orange and Rockland Utilities, Inc.
[Docket No. ER95-1027-000]
Take notice that on July 3, 1995, Orange and Rockland Utilities,
Inc. (O&R) tendered for filing an Amendment to its agreement with Long
Island Lighting Company (LILCO) to provide for the sale by O&R of
energy and capacity subject to cost based ceiling rates. The ceiling
rate for energy is 100 percent of the Seller's Incremental Cost (SIC)
plus up to 10 percent of the SIC (where such 10 percent is limited to 1
mill per Kwhr when the SIC in the hour reflects a purchased power
recourse). The ceiling rate for capacity sold by O&R is $14.79 per
megawatt hour.
Comment date: August 2, 1995, in accordance with Standard Paragraph
E at the end of this notice.
9. Duquesne Light Company
[Docket No. ER95-1053-000]
Take notice that on July 3, 1995, Duquesne Light Company tendered
for filing an amendment in the above-referenced docket.
Comment date: August 2, 1995, in accordance with Standard Paragraph
E at the end of this notice.
10. Central Hudson Gas & Electric Corporation
[Docket No. ER95-1093-000]
Take notice that on July 17, 1995, Central Hudson Gas & Electric
Corporation tendered for filing a letter requesting to withdraw its
Notice of Cancellation regarding Rate Schedule 71.
[[Page 38320]]
Comment date: August 2, 1995, in accordance with Standard Paragraph
E at the end of this notice.
11. Portland General Electric Company
[Docket Nos. ER95-1098-000]
Take notice that Portland General Electric Company, on July 5,
1995, tendered for filing an amendment to its May 25, 1995 filing in
the above-referenced docket.
Comment date: August 2, 1995, in accordance with Standard Paragraph
E at the end of this notice.
12. Public Service Company of Colorado
[Docket No. ER95-1207-000]
Take notice that on July 7, 1995, Public Service Company of
Colorado tendered for filing an amendment in the above-referenced
docket.
Comment date: August 2, 1995, in accordance with Standard Paragraph
E at the end of this notice.
13. Entergy Services, Inc.
[Docket No. ER95-1276-000]
Take notice that on June 27, 1995, Entergy Services, Inc. (Entergy
Services), on behalf of Arkansas Power & Light Company, Gulf States
Utilities Company, Louisiana Power & Light Company, Mississippi Power &
Light Company, and New Orleans Public Service Inc., tendered for filing
the First Amendment to the Transmission Service Agreement (Amendment)
between Entergy Services and NorAm Energy Services (NorAm). Entergy
Services states that the Amendment modifies the transmission
arrangements under which the Entergy Operating Companies' will provide
NorAm non-firm transmission service under Entergy Services Transmission
Service Tariff.
Comment date: August 2, 1995, in accordance with Standard Paragraph
E at the end of this notice.
14. Jersey Central Power & Light Company, Metropolitan Edison Company,
Pennsylvania Electric Company
[Docket No. ER95-1285-000]
Take notice that on June 29, 1995, GPU Service Corporation (GPU)
tendered for filing on behalf of Jersey Central Power & Light Company,
Metropolitan Edison Company and Pennsylvania Electric Company tendered
for an amendment to the GPU Power Pooling Agreement dated July 21,
1969, as amended, which is on file with the Commission as Jersey
Central Power & Light Rate Schedule No. 31, Metropolitan Edison Company
Rate Schedule No. 40 and Pennsylvania Electric Company Rate Schedule
No. 62.
Comment date: August 2, 1995, in accordance with Standard Paragraph
E at the end of this notice.
15. Entergy Power, Inc.
[Docket No. ER95-1330-000]
Take notice that on July 3, 1995, Entergy Power, Inc. (EPI),
tendered for filing a Purchase and Sale Agreement with Catex Vitol
Electric. L.L.C.
EPI requests an effective date for the Agreement that is one (1)
day after the date of filing, and respectfully requests waiver of the
Commission notice requirements in Sec. 35.11 of the Commission's
Regulations.
Comment date: August 2, 1995, in accordance with Standard Paragraph
E at the end of this notice.
16. Wisconsin Electric Power Company
[Docket No. ER95-1332-000]
Take notice that on July 3, 1995, Wisconsin Electric Power Company
(Wisconsin Electric), tendered for filing a Transmission Service
Agreement between itself and Enron Power Marketing, Inc. (EPMI). The
Transmission Service Agreement allows EPMI to receive transmission
service under Wisconsin Electric's FERC Electric Tariff, Original
Volume 1, Rate Schedule T-1.
Wisconsin Electric requests an effective date of sixty days from
date of filing. Copies of the filing have been served on EPMI, the
Public Service Commission of Wisconsin and the Michigan Public Service
Commission.
Comment date: August 2, 1995, in accordance with Standard Paragraph
E at the end of this notice.
17. Wisconsin Electric Power Company
[Docket No. ER95-1333-000]
Take notice that on July 3, 1995, Wisconsin Electric Power Company
(Wisconsin Electric), tendered for filing an Electric Service Agreement
between itself and LG&E Power Marketing Inc. (LPM). The Electric
Service Agreement provides for service under Wisconsin Electric's
Coordination Sales Tariff.
Wisconsin Electric requests an effective date of sixty days from
date of filing. Copies of the filing have been served on LPM, the
Public Service Commission of Wisconsin and the Michigan Public Service
Commission.
Comment date: August 2, 1995, in accordance with Standard Paragraph
E at the end of this notice.
18. Stalwart Power Company
[Docket No. ER95-1334-000]
Take notice that on July 3, 1995, Stalwart Power Company (Stalwart)
tendered for filing pursuant to Rule 205, 18 CFR 385.205 an application
for a blanket certificate, disclaimer of jurisdiction, and various
other authorizations and waivers from the Commission, including
approval of its FERC Electric Rate Schedule No. 1 to be effective
August 31, 1995.
Stalwart proposes to engage in the wholesale electric power market
as both a broker and a marketer buying and selling electric power.
Specifically, Stalwart proposes to purchase electric energy and
transmission capacity from public utilities and other power producers,
and resell such energy and capacity to others. Stalwart anticipates
that such transactions will vary in duration and quality of service
relative to interruptibility. In addition, the price it proposes to
charge for its services shall be negotiated, market-based rates.
Stalwart does not own or operate electric power generation,
transmission, or distribution facilities.
Comment date: August 2, 1995, in accordance with Standard Paragraph
E at the end of this notice.
19. Entergy Power, Inc.
[Docket No. ER95-1335-000]
Take notice that on July 3, 1995, Entergy Power, Inc. (EPI),
tendered for filing an Interchange Agreement with Sam Rayburn G&T
Electric Cooperative, Inc.
EPI requests an effective date for the Interchange Agreement that
is one (1) day after the date of filing, and respectfully requests
waiver of the notice requirements specified in Sec. 35.11 of the
Commission's Regulations.
Comment date: August 2, 1995, in accordance with Standard Paragraph
E at the end of this notice.
20. Entergy Power, Inc.
[Docket No. ER95-1336-000]
Take notice that on July 5, 1995, Entergy Power, Inc. (EPI),
tendered for filing an Interchange Agreement with East Texas Electric
Cooperative, Inc.
EPI requests an effective date for the Interchange Agreement that
is one (1) day after the date of filing, and respectfully requests
waiver of the notice requirements specified in Sec. 35.11 of the
Commission's Regulations.
Comment date: August 2, 1995, in accordance with Standard Paragraph
E at the end of this notice.
21. Wisconsin Power & Light Company
[Docket No. ER95-1337-000]
Take notice that on July 5, 1995, Wisconsin Power & Light Company
(WP&L), tendered for filing an amended Wholesale Power Agreement dated
June 26, 1995, between Adams-Columbia
[[Page 38321]]
Electric Cooperative and WP&L. WP&L states that this amended Wholesale
Power Agreement revises the previous agreement between the two parties
dated August 24, 1988, and designated Rate Schedule Number 144 by the
Commission.
The parties have amended the Wholesale Power Agreement to add an
additional delivery point. Service under this amended Wholesale Power
Agreement will be in accordance with standard WP&L Rate Schedule W-2.
WP&L requests an effective date of July 14, 1995 which is
concurrent with the expected service date. WP&L states that copies of
the amended Wholesale Power Agreement and the filing have been provided
to Adams-Columbia Electric Cooperative and the Public Service
Commission of Wisconsin.
Comment date: August 2, 1995, in accordance with Standard Paragraph
E at the end of this notice.
22. Pacific Gas and Electric Company
[Docket No. ER95-1338-000]
Take notice that on July 5, 1995, Pacific Gas and Electric Company
(PG&E), tendered for filing the First Amendment to the September 22,
1993 Power and Transmission Services Agreement between PG&E and Lassen
Municipal Utility District (Lassen), a Revised Appendix A to that
Agreement, and a February 3, 1995 Letter Agreement between PG&E and
Lassen. The three submittals proposed changes in energy, power and
transmission rates for services PG&E provides Lassen to be effective
July 1, 1994.
Copies of this filing have been served upon Lassen and the
California Public Utilities Commission.
Comment date: August 2, 1995, in accordance with Standard Paragraph
E at the end of this notice.
23. Portland General Electric Company
[Docket No. ER95-1340-000]
Take notice that on July 6, 1995, Portland General Electric Company
(PGE), tendered for filing a Revision No. 2 to Exhibit D of the General
Transfer Agreement between Bonneville Power Administration (BPA) and
PGE (FERC Electric Service Tariff Volume No. 72).
The BPA and PGE mutually agree to revise Exhibit D to the General
Transfer Agreement to reflect PGE as the full service supplier to Canby
Utility Board (Docket No. ER95-1128-000).
Copies of the filing have been served on the parties included in
the filing letter.
Pursuant to 18 CFR 35.11 and the Commission's order issued July 30,
1993, (Docket No. PL93-2-002), PGE respectfully requests that the
Commission grant waiver of the notice requirements of 18 CFR 35.3 to
allow Revision No. 2 to Exhibit D of the GTA to become effective as of
August 1, 1995.
Comment date: August 2, 1995, in accordance with Standard Paragraph
E at the end of this notice.
24. Pacific Gas and Electric Company
[Docket No. ER95-1341-000]
Take notice that on July 6, 1995, Pacific Gas and Electric Company
(PG&E), tendered for filing a rate schedule change to Rate Schedule
FERC No. 79, between PG&E and the Western Area Power Administration
(Western).
The rate schedule change establishes recorded-cost based rates for
true-up of capacity sales and energy sales from Energy Account No. 2
made during 1993, at rates based on estimated costs. Pursuant to
Contract No. 14-06-200-2948A, and to the PG&E--Western Letter Agreement
dated February 7, 1992, sales are made initially at rates based on
estimated costs and then are rebilled at rates based on recorded costs
after the necessary data becomes available. With interest, the
rebilling will result in a refund to Western of over $2.1 million.
Copies of this filing have been served upon Western and the
California Public Utilities Commission.
Comment date: August 2, 1995, in accordance with Standard Paragraph
E at the end of this notice.
25. Virginia Electric and Power Company
[Docket No. ER95-1342-000]
Take notice that on July 7, 1995, Virginia Electric and Power
Company (Virginia Power), tendered for filing a Service Agreement
between Public Service Electric and Gas Company and Virginia Power,
dated July 1, 1995 under the Power Sales Tariff to Eligible Purchasers
dated May 17, 1994. Under the tendered Service Agreement Virginia Power
agrees to provide services to Engelhard Power Marketing, Inc. under the
rates, terms and conditions of the Power Sales Tariff as agreed by the
parties pursuant to the terms of the applicable Service Schedules
included in the Power Sales Tariff.
Copies of the filing were served upon the Virginia State
Corporation Commission and the North Carolina Utilities Commission.
Comment date: August 2, 1995, in accordance with Standard Paragraph
E at the end of this notice.
26. Black Hills Corporation
[Docket No. ER95-1343-000]
Take notice that on July 7, 1995, Black Hills Corporation (Black
Hills), which operates its electric utility business under the name of
Black Hills Power and Light Company, tendered for filing the Second
Restated Electric Power and Energy Supply and Transmission Agreement,
dated as of February 28, 1995 (Amended Agreement), between Black Hills
and the City of Gillette, Wyoming (Gillette), in replacement of and to
supersede the Restated Electric Power and Energy Supply and
Transmission Agreement, dated December 21, 1987, between Black Hills
and Gillette filed with the Commission and designated Black Hills Power
and Light Company, Rate Schedule FERC No. 34 and Supplement No. 1
thereto. As a further supplement to the above Rate Schedule, Black
Hills also tenders for filing the Restated and Amended Coal Supply
Agreement for Neil Simpson Unit No. 2, dated February 12, 1993 as an
amended to Black Hills' Rate Schedule FERC No. 33 (as now designated).
The New Agreement reduces the quantity of capacity and energy to be
sold Gillette and provides for an increase in the capacity charge and
other minor changes.
Black Hills requests and provides waiver of the Commission's Notice
requirements to permit this rate schedule to become effective September
1, 1995.
Copies of this filing were served upon the parties to the Amended
Agreement, the South Dakota Public Utilities Commission, the Wyoming
Public Service Commission and the Montana Public Service Commission.
Comment date: August 2, 1995, in accordance with Standard Paragraph
E at the end of this notice.
27. CINergy Services, Inc.
[Docket No. ER95-1344-000]
Take notice that on July 7, 1995, CINergy Services, Inc. (CIN),
tendered for filing on behalf of its operating companies, The
Cincinnati Gas & Electric Company (CG&E) and PSI Energy, Inc. (PSI), an
Interchange Agreement, dated June 1, 1995, between CIN, CG&E, PSI and
Torco Energy Marketing, Inc. (TORCO).
The Interchange Agreement provides for the following service
between CIN and TORCO.
1. Exhibit A--Power Sales by TORCO
2. Exhibit B--Power Sales by CIN
CIN and TORCO have requested an effective date of August 1, 1995.
[[Page 38322]]
Copies of the filing were served on Torco Energy Marketing, Inc.,
the Illinois Commerce Commission, the Kentucky Public Service
Commission, Public Utilities Commission of Ohio and the Indiana Utility
Regulatory Commission.
Comment date: August 2, 1995, in accordance with Standard Paragraph
E at the end of this notice.
28. CINergy Services, Inc.
[Docket No. ER95-1345-000]
Take notice that on July 7, 1995, CINergy Services, Inc. (CIN),
tendered for filing on behalf of its operating companies, The
Cincinnati Gas & Electric Company (CG&E) and PSI Energy, Inc. (PSI), an
Interchange Agreement, dated June 1, 1995, between CIN, CG&E, PSI and
Tennessee Power Company (TPCO).
The Interchanges Agreement provides for the following service
between CIN and TPCO.
1. Exhibit A--Power Sales by TPCO
2. Exhibit B--Power Sales by CIN
CIN and TPCO have requested an effective date of August 1, 1995.
Copies of the filing were served on Tennessee Power Company, the
Tennessee Public Service Commission, the Kentucky Public Service
Commission, Public Utilities Commission of Ohio and the Indiana Utility
Regulatory Commission.
Comment date: August 2, 1995, in accordance with Standard Paragraph
E at the end of this notice.
Standard Paragraph:
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C.
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 95-18329 Filed 7-25-95; 8:45 am]