95-18329. Allegheny Power Service Corporation, et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 60, Number 143 (Wednesday, July 26, 1995)]
    [Notices]
    [Pages 38319-38322]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-18329]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. ER95-135-001, et al.]
    
    
    Allegheny Power Service Corporation, et al.; Electric Rate and 
    Corporate Regulation Filings
    
    July 19, 1995.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. Allegheny Power Service Corporation on behalf of Monongahela Power 
    Company The Potomac Edison Company and West Penn Power Company (the APS 
    Companies)
    
    [Docket No. ER95-135-001]
    
        Take notice that on June 30, 1995, Allegheny Power Service 
    Corporation on behalf of Monongahela Power Company, The Potomac Edison 
    Company and West Penn Power Company (``the APS Companies'') filed 
    amendments to comply with a Commission Order on filing rates for 
    emission allowances. Allegheny Power Service Corporation requests 
    waiver of notice requirements and asks the Commission to honor the 
    proposed January 1, 1995 effective date specified in Docket No. ER95-
    135-000.
        Copies of the filing have been provided to the Public Utilities 
    Commission of Ohio, the Pennsylvania Public Utility Commission, the 
    Maryland Public Service Commission, the Virginia State Corporation 
    Commission, the West Virginia Public Service Commission, and all 
    parties of record.
        Comment date: August 2, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    2. Kentucky Utilities Company
    
    [Docket No. ER95-529-000]
    
        Take notice that on July 11, 1995, Kentucky Utilities Company (KU), 
    tendered for filing an amendment to its filing in the above-referenced 
    docket regarding the inclusion of the cost of emission allowances 
    associated with coordination sets.
        Comment date: August 2, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    3. PJM Interconnection Association
    
    [Docket Nos. ER95-564-000 ER95-565-000 ER95-566-000 ER95-567-000 and 
    ER95-568-000]
    
        Take notice that on June 27, 1995, the Pennsylvania-New Jersey-
    Maryland (PJM) Interconnection Association filed, on behalf of the 
    signatories to PJM Interconnection Agreement, amended versions of 
    Exhibit A in each of the subject dockets to explain the treatment of 
    the costs of emission allowances in energy sales.
        Comment date: August 2, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    4. Wisconsin Public Service Corporation
    
    [Docket No. ER95-576-001]
    
        Take notice that Wisconsin Public Service Corporation (WPSC), of 
    Green Bay, Wisconsin on June 30, 1995, tendered for filing revisions to 
    its SO2 emission allowance procedures in compliance with the 
    Commission's June 2, 1995 order accepting WPSC's February 8, 1995 
    emissions allowance filing. WPSC asks that its emission allowance rate 
    become effective on July 1, 1995 rather than January 1, 1995 as 
    specified in the Commission's June 2, 1995 order.
        WPSC states that the filing has been served on the affected parties 
    and posted as required by the Commission's Regulations.
        Comment date: August 2, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    5. Maine Public Service Company
    
    [Docket No. ER95-836-001]
    
        Take notice that on June 30, 1995, Maine Public Service Company 
    tendered for filing its compliance filing in the above-referenced 
    docket.
        Comment date: August 2, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    6. Northern Indiana Public Service Company
    
    [Docket No. ER95-902-000]
    
        Take notice that on July 14, 1995, Northern Indiana Public Service 
    Company tendered for filing an amendment in the above-referenced 
    docket.
        Comment date: August 2, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    7. Orange and Rockland Utilities, Inc.
    
    [Docket No. ER95-1026-000]
    
        Take notice that on July 6, 1995, Orange and Rockland Utilities, 
    Inc. (O&R) tendered for filing an Amendment to its agreement with Enron 
    Power Marketing, Inc, (EPMI) to provide for the purchase or sale by 
    either party of energy and capacity and whereby the sale by O&R is 
    subject to cost based ceiling rates. The ceiling rate for O&R energy is 
    100 percent of O&R's Incremental Cost (SIC) plus up to 10 percent of 
    the SIC (where such 10 percent is limited to 1 mill per Kwhr when the 
    SIC in the hour reflects a purchased power resource). The ceiling rate 
    for capacity sold by O&R is $14.79 per megawatt hour.
        O&R states that a copy of this filing has been served by mail upon 
    EPMI.
        Comment date: August 2, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    8. Orange and Rockland Utilities, Inc.
    
    [Docket No. ER95-1027-000]
    
        Take notice that on July 3, 1995, Orange and Rockland Utilities, 
    Inc. (O&R) tendered for filing an Amendment to its agreement with Long 
    Island Lighting Company (LILCO) to provide for the sale by O&R of 
    energy and capacity subject to cost based ceiling rates. The ceiling 
    rate for energy is 100 percent of the Seller's Incremental Cost (SIC) 
    plus up to 10 percent of the SIC (where such 10 percent is limited to 1 
    mill per Kwhr when the SIC in the hour reflects a purchased power 
    recourse). The ceiling rate for capacity sold by O&R is $14.79 per 
    megawatt hour.
        Comment date: August 2, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    9. Duquesne Light Company
    
    [Docket No. ER95-1053-000]
    
        Take notice that on July 3, 1995, Duquesne Light Company tendered 
    for filing an amendment in the above-referenced docket.
        Comment date: August 2, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    10. Central Hudson Gas & Electric Corporation
    
    [Docket No. ER95-1093-000]
    
        Take notice that on July 17, 1995, Central Hudson Gas & Electric 
    Corporation tendered for filing a letter requesting to withdraw its 
    Notice of Cancellation regarding Rate Schedule 71. 
    
    [[Page 38320]]
    
        Comment date: August 2, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    11. Portland General Electric Company
    
    [Docket Nos. ER95-1098-000]
    
        Take notice that Portland General Electric Company, on July 5, 
    1995, tendered for filing an amendment to its May 25, 1995 filing in 
    the above-referenced docket.
        Comment date: August 2, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    12. Public Service Company of Colorado
    
    [Docket No. ER95-1207-000]
    
        Take notice that on July 7, 1995, Public Service Company of 
    Colorado tendered for filing an amendment in the above-referenced 
    docket.
        Comment date: August 2, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    13. Entergy Services, Inc.
    
    [Docket No. ER95-1276-000]
    
        Take notice that on June 27, 1995, Entergy Services, Inc. (Entergy 
    Services), on behalf of Arkansas Power & Light Company, Gulf States 
    Utilities Company, Louisiana Power & Light Company, Mississippi Power & 
    Light Company, and New Orleans Public Service Inc., tendered for filing 
    the First Amendment to the Transmission Service Agreement (Amendment) 
    between Entergy Services and NorAm Energy Services (NorAm). Entergy 
    Services states that the Amendment modifies the transmission 
    arrangements under which the Entergy Operating Companies' will provide 
    NorAm non-firm transmission service under Entergy Services Transmission 
    Service Tariff.
        Comment date: August 2, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    14. Jersey Central Power & Light Company, Metropolitan Edison Company, 
    Pennsylvania Electric Company
    
    [Docket No. ER95-1285-000]
    
        Take notice that on June 29, 1995, GPU Service Corporation (GPU) 
    tendered for filing on behalf of Jersey Central Power & Light Company, 
    Metropolitan Edison Company and Pennsylvania Electric Company tendered 
    for an amendment to the GPU Power Pooling Agreement dated July 21, 
    1969, as amended, which is on file with the Commission as Jersey 
    Central Power & Light Rate Schedule No. 31, Metropolitan Edison Company 
    Rate Schedule No. 40 and Pennsylvania Electric Company Rate Schedule 
    No. 62.
        Comment date: August 2, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    15. Entergy Power, Inc.
    
    [Docket No. ER95-1330-000]
    
        Take notice that on July 3, 1995, Entergy Power, Inc. (EPI), 
    tendered for filing a Purchase and Sale Agreement with Catex Vitol 
    Electric. L.L.C.
        EPI requests an effective date for the Agreement that is one (1) 
    day after the date of filing, and respectfully requests waiver of the 
    Commission notice requirements in Sec. 35.11 of the Commission's 
    Regulations.
        Comment date: August 2, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    16. Wisconsin Electric Power Company
    
    [Docket No. ER95-1332-000]
    
        Take notice that on July 3, 1995, Wisconsin Electric Power Company 
    (Wisconsin Electric), tendered for filing a Transmission Service 
    Agreement between itself and Enron Power Marketing, Inc. (EPMI). The 
    Transmission Service Agreement allows EPMI to receive transmission 
    service under Wisconsin Electric's FERC Electric Tariff, Original 
    Volume 1, Rate Schedule T-1.
        Wisconsin Electric requests an effective date of sixty days from 
    date of filing. Copies of the filing have been served on EPMI, the 
    Public Service Commission of Wisconsin and the Michigan Public Service 
    Commission.
        Comment date: August 2, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    17. Wisconsin Electric Power Company
    
    [Docket No. ER95-1333-000]
    
        Take notice that on July 3, 1995, Wisconsin Electric Power Company 
    (Wisconsin Electric), tendered for filing an Electric Service Agreement 
    between itself and LG&E Power Marketing Inc. (LPM). The Electric 
    Service Agreement provides for service under Wisconsin Electric's 
    Coordination Sales Tariff.
        Wisconsin Electric requests an effective date of sixty days from 
    date of filing. Copies of the filing have been served on LPM, the 
    Public Service Commission of Wisconsin and the Michigan Public Service 
    Commission.
        Comment date: August 2, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    18. Stalwart Power Company
    
    [Docket No. ER95-1334-000]
    
        Take notice that on July 3, 1995, Stalwart Power Company (Stalwart) 
    tendered for filing pursuant to Rule 205, 18 CFR 385.205 an application 
    for a blanket certificate, disclaimer of jurisdiction, and various 
    other authorizations and waivers from the Commission, including 
    approval of its FERC Electric Rate Schedule No. 1 to be effective 
    August 31, 1995.
        Stalwart proposes to engage in the wholesale electric power market 
    as both a broker and a marketer buying and selling electric power. 
    Specifically, Stalwart proposes to purchase electric energy and 
    transmission capacity from public utilities and other power producers, 
    and resell such energy and capacity to others. Stalwart anticipates 
    that such transactions will vary in duration and quality of service 
    relative to interruptibility. In addition, the price it proposes to 
    charge for its services shall be negotiated, market-based rates. 
    Stalwart does not own or operate electric power generation, 
    transmission, or distribution facilities.
        Comment date: August 2, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    19. Entergy Power, Inc.
    
    [Docket No. ER95-1335-000]
    
        Take notice that on July 3, 1995, Entergy Power, Inc. (EPI), 
    tendered for filing an Interchange Agreement with Sam Rayburn G&T 
    Electric Cooperative, Inc.
        EPI requests an effective date for the Interchange Agreement that 
    is one (1) day after the date of filing, and respectfully requests 
    waiver of the notice requirements specified in Sec. 35.11 of the 
    Commission's Regulations.
        Comment date: August 2, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    20. Entergy Power, Inc.
    
    [Docket No. ER95-1336-000]
    
        Take notice that on July 5, 1995, Entergy Power, Inc. (EPI), 
    tendered for filing an Interchange Agreement with East Texas Electric 
    Cooperative, Inc.
        EPI requests an effective date for the Interchange Agreement that 
    is one (1) day after the date of filing, and respectfully requests 
    waiver of the notice requirements specified in Sec. 35.11 of the 
    Commission's Regulations.
        Comment date: August 2, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    21. Wisconsin Power & Light Company
    
    [Docket No. ER95-1337-000]
    
        Take notice that on July 5, 1995, Wisconsin Power & Light Company 
    (WP&L), tendered for filing an amended Wholesale Power Agreement dated 
    June 26, 1995, between Adams-Columbia 
    
    [[Page 38321]]
    Electric Cooperative and WP&L. WP&L states that this amended Wholesale 
    Power Agreement revises the previous agreement between the two parties 
    dated August 24, 1988, and designated Rate Schedule Number 144 by the 
    Commission.
        The parties have amended the Wholesale Power Agreement to add an 
    additional delivery point. Service under this amended Wholesale Power 
    Agreement will be in accordance with standard WP&L Rate Schedule W-2.
        WP&L requests an effective date of July 14, 1995 which is 
    concurrent with the expected service date. WP&L states that copies of 
    the amended Wholesale Power Agreement and the filing have been provided 
    to Adams-Columbia Electric Cooperative and the Public Service 
    Commission of Wisconsin.
        Comment date: August 2, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    22. Pacific Gas and Electric Company
    
    [Docket No. ER95-1338-000]
    
        Take notice that on July 5, 1995, Pacific Gas and Electric Company 
    (PG&E), tendered for filing the First Amendment to the September 22, 
    1993 Power and Transmission Services Agreement between PG&E and Lassen 
    Municipal Utility District (Lassen), a Revised Appendix A to that 
    Agreement, and a February 3, 1995 Letter Agreement between PG&E and 
    Lassen. The three submittals proposed changes in energy, power and 
    transmission rates for services PG&E provides Lassen to be effective 
    July 1, 1994.
        Copies of this filing have been served upon Lassen and the 
    California Public Utilities Commission.
        Comment date: August 2, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    23. Portland General Electric Company
    
    [Docket No. ER95-1340-000]
    
        Take notice that on July 6, 1995, Portland General Electric Company 
    (PGE), tendered for filing a Revision No. 2 to Exhibit D of the General 
    Transfer Agreement between Bonneville Power Administration (BPA) and 
    PGE (FERC Electric Service Tariff Volume No. 72).
        The BPA and PGE mutually agree to revise Exhibit D to the General 
    Transfer Agreement to reflect PGE as the full service supplier to Canby 
    Utility Board (Docket No. ER95-1128-000).
        Copies of the filing have been served on the parties included in 
    the filing letter.
        Pursuant to 18 CFR 35.11 and the Commission's order issued July 30, 
    1993, (Docket No. PL93-2-002), PGE respectfully requests that the 
    Commission grant waiver of the notice requirements of 18 CFR 35.3 to 
    allow Revision No. 2 to Exhibit D of the GTA to become effective as of 
    August 1, 1995.
        Comment date: August 2, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    24. Pacific Gas and Electric Company
    
    [Docket No. ER95-1341-000]
    
        Take notice that on July 6, 1995, Pacific Gas and Electric Company 
    (PG&E), tendered for filing a rate schedule change to Rate Schedule 
    FERC No. 79, between PG&E and the Western Area Power Administration 
    (Western).
        The rate schedule change establishes recorded-cost based rates for 
    true-up of capacity sales and energy sales from Energy Account No. 2 
    made during 1993, at rates based on estimated costs. Pursuant to 
    Contract No. 14-06-200-2948A, and to the PG&E--Western Letter Agreement 
    dated February 7, 1992, sales are made initially at rates based on 
    estimated costs and then are rebilled at rates based on recorded costs 
    after the necessary data becomes available. With interest, the 
    rebilling will result in a refund to Western of over $2.1 million.
        Copies of this filing have been served upon Western and the 
    California Public Utilities Commission.
        Comment date: August 2, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    25. Virginia Electric and Power Company
    
    [Docket No. ER95-1342-000]
    
        Take notice that on July 7, 1995, Virginia Electric and Power 
    Company (Virginia Power), tendered for filing a Service Agreement 
    between Public Service Electric and Gas Company and Virginia Power, 
    dated July 1, 1995 under the Power Sales Tariff to Eligible Purchasers 
    dated May 17, 1994. Under the tendered Service Agreement Virginia Power 
    agrees to provide services to Engelhard Power Marketing, Inc. under the 
    rates, terms and conditions of the Power Sales Tariff as agreed by the 
    parties pursuant to the terms of the applicable Service Schedules 
    included in the Power Sales Tariff.
        Copies of the filing were served upon the Virginia State 
    Corporation Commission and the North Carolina Utilities Commission.
        Comment date: August 2, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    26. Black Hills Corporation
    
    [Docket No. ER95-1343-000]
    
        Take notice that on July 7, 1995, Black Hills Corporation (Black 
    Hills), which operates its electric utility business under the name of 
    Black Hills Power and Light Company, tendered for filing the Second 
    Restated Electric Power and Energy Supply and Transmission Agreement, 
    dated as of February 28, 1995 (Amended Agreement), between Black Hills 
    and the City of Gillette, Wyoming (Gillette), in replacement of and to 
    supersede the Restated Electric Power and Energy Supply and 
    Transmission Agreement, dated December 21, 1987, between Black Hills 
    and Gillette filed with the Commission and designated Black Hills Power 
    and Light Company, Rate Schedule FERC No. 34 and Supplement No. 1 
    thereto. As a further supplement to the above Rate Schedule, Black 
    Hills also tenders for filing the Restated and Amended Coal Supply 
    Agreement for Neil Simpson Unit No. 2, dated February 12, 1993 as an 
    amended to Black Hills' Rate Schedule FERC No. 33 (as now designated).
        The New Agreement reduces the quantity of capacity and energy to be 
    sold Gillette and provides for an increase in the capacity charge and 
    other minor changes.
        Black Hills requests and provides waiver of the Commission's Notice 
    requirements to permit this rate schedule to become effective September 
    1, 1995.
        Copies of this filing were served upon the parties to the Amended 
    Agreement, the South Dakota Public Utilities Commission, the Wyoming 
    Public Service Commission and the Montana Public Service Commission.
        Comment date: August 2, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    27. CINergy Services, Inc.
    
    [Docket No. ER95-1344-000]
    
        Take notice that on July 7, 1995, CINergy Services, Inc. (CIN), 
    tendered for filing on behalf of its operating companies, The 
    Cincinnati Gas & Electric Company (CG&E) and PSI Energy, Inc. (PSI), an 
    Interchange Agreement, dated June 1, 1995, between CIN, CG&E, PSI and 
    Torco Energy Marketing, Inc. (TORCO).
        The Interchange Agreement provides for the following service 
    between CIN and TORCO.
    
    1. Exhibit A--Power Sales by TORCO
    2. Exhibit B--Power Sales by CIN
    
        CIN and TORCO have requested an effective date of August 1, 1995. 
    
    [[Page 38322]]
    
        Copies of the filing were served on Torco Energy Marketing, Inc., 
    the Illinois Commerce Commission, the Kentucky Public Service 
    Commission, Public Utilities Commission of Ohio and the Indiana Utility 
    Regulatory Commission.
        Comment date: August 2, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    28. CINergy Services, Inc.
    
    [Docket No. ER95-1345-000]
    
        Take notice that on July 7, 1995, CINergy Services, Inc. (CIN), 
    tendered for filing on behalf of its operating companies, The 
    Cincinnati Gas & Electric Company (CG&E) and PSI Energy, Inc. (PSI), an 
    Interchange Agreement, dated June 1, 1995, between CIN, CG&E, PSI and 
    Tennessee Power Company (TPCO).
        The Interchanges Agreement provides for the following service 
    between CIN and TPCO.
    
    1. Exhibit A--Power Sales by TPCO
    2. Exhibit B--Power Sales by CIN
    
        CIN and TPCO have requested an effective date of August 1, 1995.
        Copies of the filing were served on Tennessee Power Company, the 
    Tennessee Public Service Commission, the Kentucky Public Service 
    Commission, Public Utilities Commission of Ohio and the Indiana Utility 
    Regulatory Commission.
        Comment date: August 2, 1995, in accordance with Standard Paragraph 
    E at the end of this notice.
    
    Standard Paragraph:
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C. 
    20426, in accordance with Rules 211 and 214 of the Commission's Rules 
    of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-18329 Filed 7-25-95; 8:45 am]
    BILLING CODE 6717-01-P
    
    

Document Information

Published:
07/26/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-18329
Dates:
August 2, 1995, in accordance with Standard Paragraph E at the end of this notice.
Pages:
38319-38322 (4 pages)
Docket Numbers:
Docket No. ER95-135-001, et al.
PDF File: