[Federal Register Volume 60, Number 144 (Thursday, July 27, 1995)]
[Notices]
[Page 38553]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-18414]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP95-618-000]
NorAm Gas Transmission Company; Notice of Request Under Blanket
Authorization
July 21, 1995.
Take notice that on July 14, 1995, NorAm Gas Transmission Company
(NGT), 1600 Smith Street, Houston, Texas 77002, filed in Docket No.
CP95-618-000 a request pursuant to Secs. 157.205, 157.216 and 157.211
of the Commission's Regulations under the Natural Gas Act (18 CFR
157.205, 157.216 and 157.211) for authorization to abandon certain
facilities in Arkansas, and to construct and operate certain facilities
in Arkansas, under NGT's blanket certificate issued in Docket No. CP82-
384-000 and CP82-384-001 pursuant to Section 7 of the Natural Gas Act,
all as more fully set forth in the request that is on file with the
Commission and open to public inspection.
NGT proposes to abandon one 1-inch tap and 1-inch U-shape meter
station located on NGT's Line B in Faulkner County, Arkansas, and to
replace it with one 2-inch tap and 3-inch L-Shape meter station to be
located on Line B, Faulkner County, Arkansas. No service will be
abandoned. These facilities are necessary to accommodate a request from
Arkla for increased volumes to its Nucor and Conway City Plant. The tap
to be abandoned and the tap to be constructed are located in Section
23, Township 5 North, Range 14 West, Faulkner County, Arkansas. The
estimated volumes to be delivered through these facilities are
approximately 1,489,200 MMBtu annually and 4,080 MMBTu a day. The
estimated cost of construction is $43,925 and Arkla will reimburse NGT
$31,487.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Sec. 157.205 of the
Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the
request. If no protest is filed within the time allowed therefor, the
proposed activity shall be deemed to be authorized effective the date
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to section 7 of the Natural Gas Act.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 95-18414 Filed 7-26-95; 8:45 am]
BILLING CODE 6717-01-M