98-19957. Colorado Interstate Gas Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 63, Number 143 (Monday, July 27, 1998)]
    [Notices]
    [Page 40111]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-19957]
    
    
    
    [[Page 40111]]
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP98-665-000]
    
    
    Colorado Interstate Gas Company; Notice of Request Under Blanket 
    Authorization
    
    July 21, 1998.
        Take notice that on July 10, 1998, Colorado Interstate Gas Company 
    (CIG), P.O. Box 1087, Colorado Springs, Colorado 80944, filed in Docket 
    No. CP98-665-000 a request pursuant to Sections 157.205 and 157.216 and 
    211 of the Commission's Regulations under the National Gas Act (18 CFR 
    157.205, 157.216, and 211) for authorization to remove an existing 6-
    inch meter run formally used for receipt of gas from the Roggen 
    Processing Plant and to replace it with a 2-inch meter tube to deliver 
    gas to Duke Energy Field Services, Inc. (Duke) pursuant to CIG's 
    Blanket Certificate issued in Docket No. CP83-21-000, all as more fully 
    set forth in the request that is on file with the Commission and open 
    to public inspection.
        CIG states that the 6-inch meter facility was originally installed 
    to receive gas from the Roggen Processing Plant (closed in the summer 
    of 1997) which provided pipeline quality gas for Duke's gathering 
    system compressor station in Weld county, Colorado. CIG now proposes to 
    remove the existing 6-inch meter tube and replace it with a 2-inch 
    meter tube to be used to deliver gas for fuel gas at Duke's gathering 
    system compressor station.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    David P. Boergers,
    Acting Secretary.
    [FR Doc. 98-19957 Filed 7-24-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
07/27/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-19957
Pages:
40111-40111 (1 pages)
Docket Numbers:
Docket No. CP98-665-000
PDF File:
98-19957.pdf