98-19958. Northwest Pipeline Corporation; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 63, Number 143 (Monday, July 27, 1998)]
    [Notices]
    [Pages 40112-40113]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-19958]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP98-666-000]
    
    
    Northwest Pipeline Corporation; Notice of Request Under Blanket 
    Authorization
    
    July 21, 1998.
        Take notice that on July 13, 1998, Northwest Pipeline Corporation 
    (Northwest), 295 Chipeta Way, Salt Lake City, Utah 84108, filed in 
    Docket No. CP98-666-000 a request pursuant to Sections 157.205, 157.211 
    and 157.216 of the Commission's Regulations under the Natural Gas Act 
    (18 CFR 157.205, 157.211, and 157.216) for authorization to abandon 
    existing regulator facilities and constructing and operating upgraded 
    replacement regulator facilities in Spokane County, Washington under 
    Northwest's blanket certificate issued in Docket No. CP82-433-000 
    pursuant to Section 7 of the Natural Gas Act, all as more fully set 
    forth in the request that is on file with the Commission and open to 
    public inspection.
        The upgrade is being requested because of a request by Washington 
    Water Power Gas Company for increased delivery pressure. As a result of 
    the upgrade, the maximum design delivery capacity of the meter station 
    will increase from 34,945 to approximately 37,450 Dth per day at 250 
    psig and the station will be able to deliver gas at 400 psig when 
    operating conditions are suitable. The total cost of the upgrade will 
    be approximately $32,075.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn
    
    [[Page 40113]]
    
    within 30 days after the time allowed for filing a protest, the instant 
    request shall be treated as an application for authorization pursuant 
    to Section 7 of the Natural Gas Act.
    David P. Boergers,
    Acting Secretary.
    [FR Doc. 98-19958 Filed 7-24-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
07/27/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-19958
Pages:
40112-40113 (2 pages)
Docket Numbers:
Docket No. CP98-666-000
PDF File: