[Federal Register Volume 63, Number 143 (Monday, July 27, 1998)]
[Notices]
[Pages 40137-40138]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-19971]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-287]
Duke Energy Corporation; Notice of Consideration of Issuance of
Amendment To Facility Operating License, Proposed No Significant
Hazards Consideration Determination, and Opportunity for a Hearing
The U.S. Nuclear Regulatory Commission (the Commission) is
considering issuance of an amendment to Facility Operating License No.
DPR-55 issued to Duke Energy Corporation (the licensee) for operation
of the Oconee Nuclear Station Unit 3 located in Seneca, South Carolina.
If approved, the proposed amendment would extend, on a one-time
basis, Technical Specification Surveillance 4.18.3 for hydraulic and
mechanical snubber testing. The tests are required to be performed at a
frequency of 18 months, with a maximum allowed frequency of 22 months,
15 days. The proposed amendment would extend this to a maximum of 25
months to coincide with the revised start date of the Oconee, Unit 3,
refueling outage. The start date for the refueling outage has been
delayed due to the management decision to extend the present operating
cycle, which resulted in the surveillances becoming due prior to the
start of the refueling outage.
Before issuance of the proposed license amendment, the Commission
will have made findings required by the Atomic Energy Act of 1954, as
amended (the Act) and the Commission's regulations.
The Commission has made a proposed determination that the amendment
request involves no significant hazards consideration. Under the
Commission's regulations in 10 CFR 50.92, this means that operation of
the facility in accordance with the proposed amendment would not (1)
involve a significant increase in the probability or consequences of an
accident previously evaluated; or (2) create the possibility of a new
or different kind of accident from any accident previously evaluated;
or (3) involve a significant reduction in a margin of safety. As
required by 10 CFR 50.91(a), the licensee has provided its analysis of
the issue of no significant hazards consideration, which is presented
below:
This proposed change has been evaluated against the standards in
10 CFR 50.92 and has been determined to involve no significant
hazards, in that operation of the facility in accordance with the
proposed amendment would not:
1. Involve a significant increase in the probability or
consequences of an accident previously evaluated?
No. A review of the previous two hydraulic and mechanical
snubber functional tests, discussed in this amendment request
concluded that no adverse effects should occur as a result of the
one-time extension. As a consequence, there should be no adverse
affects to the piping systems and components which are restrained by
snubbers for seismic and pipe whip events.
There is a high level of confidence that the snubbers should be
available to perform their intended function during the requested
extension period. Thus, the probability and consequences of an
accident previously evaluated will not be significantly increased.
2. Create the possibility of a new or different kind of accident
from the accidents previously evaluated?
No. Since the one-time extension should not cause any adverse
effects on the snubbers' capability to restrain piping systems and
components, a new or different kind of accident from the accidents
which were previously evaluated will not occur. The snubbers should
be available to perform their intended function during the requested
extension period.
3. Involve a significant reduction in a margin of safety?
No. The margin of safety will not be significantly reduced by
this amendment request because the snubbers and the systems
supported by the snubbers should be available to perform their
intended function during the requested extension period. In
addition, the review of functional tests which are discussed in the
amendment request concluded that no adverse effects should occur as
a result of the one-time extension.
Duke [Duke Energy Corporation] has concluded, based on the above
information, that there are no significant hazards involved in this
amendment request.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
The Commission is seeking public comments on this proposed
determination. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of the 30-day notice period. However, should circumstances
change during the notice period such that failure to act in a timely
way would result, for example, in derating or shutdown of the facility,
the Commission may issue the license amendment before the expiration of
the 30-day notice period, provided that its final determination is that
the
[[Page 40138]]
amendment involves no significant hazards consideration. The final
determination will consider all public and State comments received.
Should the Commission take this action, it will publish in the Federal
Register a notice of issuance and provide for opportunity for a hearing
after issuance. The Commission expects that the need to take this
action will occur very infrequently.
Written comments may be submitted by mail to the Chief, Rules and
Directives Branch, Division of Administrative Services, Office of
Administration, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001, and should cite the publication date and page number of
this Federal Register notice. Written comments may also be delivered to
Room 6D59, Two White Flint North, 11545 Rockville Pike, Rockville,
Maryland, from 7:30 a.m. to 4:15 p.m. Federal workdays. Copies of
written comments received may be examined at the NRC's Public Document
Room, the Gelman Building, 2120 L Street, NW., Washington, DC.
The filing of requests for hearing and petitions for leave to
intervene is discussed below.
By August 26, 1998, the licensee may file a request for a hearing
with respect to issuance of the amendment to the subject facility
operating license and any person whose interest may be affected by this
proceeding and who wishes to participate as a party in the proceeding
must file a written request for a hearing and a petition for leave to
intervene. Requests for a hearing and a petition for leave to intervene
shall be filed in accordance with the Commission's ``Rules of Practice
for Domestic Licensing Proceedings'' in 10 CFR Part 2. Interested
persons should consult a current copy of 10 CFR 2.714 which is
available at the Commission's Public Document Room, the Gelman
Building, 2120 L Street, NW., Washington, DC, and at the local public
document room located at the Oconee County Library, 501 West South
Broad Street, Walhalla, South Carolina. If a request for a hearing or
petition for leave to intervene is filed by the above date, the
Commission or an Atomic Safety and Licensing Board, designated by the
Commission or by the Chairman of the Atomic Safety and Licensing Board
Panel, will rule on the request and/or petition; and the Secretary or
the designated Atomic Safety and Licensing Board will issue a notice of
hearing or an appropriate order.
As required by 10 CFR 2.714, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner in
the proceeding, and how that interest may be affected by the results of
the proceeding. The petition should specifically explain the reasons
why intervention should be permitted with particular reference to the
following factors: (1) the nature of the petitioner's right under the
Act to be made party to the proceeding; (2) the nature and extent of
the petitioner's property, financial, or other interest in the
proceeding; and (3) the possible effect of any order which may be
entered in the proceeding on the petitioner's interest. The petition
should also identify the specific aspect(s) of the subject matter of
the proceeding as to which petitioner wishes to intervene. Any person
who has filed a petition for leave to intervene or who has been
admitted as a party may amend the petition without requesting leave of
the Board up to 15 days prior to the first prehearing conference
scheduled in the proceeding, but such an amended petition must satisfy
the specificity requirements described above.
Not later than 15 days prior to the first prehearing conference
scheduled in the proceeding, a petitioner shall file a supplement to
the petition to intervene which must include a list of the contentions
which are sought to be litigated in the matter. Each contention must
consist of a specific statement of the issue of law or fact to be
raised or controverted. In addition, the petitioner shall provide a
brief explanation of the bases of the contention and a concise
statement of the alleged facts or expert opinion which support the
contention and on which the petitioner intends to rely in proving the
contention at the hearing. The petitioner must also provide references
to those specific sources and documents of which the petitioner is
aware and on which the petitioner intends to rely to establish those
facts or expert opinion. Petitioner must provide sufficient information
to show that a genuine dispute exists with the applicant on a material
issue of law or fact. Contentions shall be limited to matters within
the scope of the amendment under consideration. The contention must be
one which, if proven, would entitle the petitioner to relief. A
petitioner who fails to file such a supplement which satisfies these
requirements with respect to at least one contention will not be
permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing, including the opportunity to present evidence and cross-
examine witnesses.
If a hearing is requested, the Commission will make a final
determination on the issue of no significant hazards consideration. The
final determination will serve to decide when the hearing is held.
If the final determination is that the amendment request involves
no significant hazards consideration, the Commission may issue the
amendment and make it immediately effective, notwithstanding the
request for a hearing. Any hearing held would take place after issuance
of the amendment.
If the final determination is that the amendment request involves a
significant hazards consideration, any hearing held would take place
before the issuance of any amendment.
A request for a hearing or a petition for leave to intervene must
be filed with the Secretary of the Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, Attention: Rulemakings and
Adjudications Staff, or may be delivered to the Commission's Public
Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC,
by the above date. A copy of the petition should also be sent to the
Office of the General Counsel, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, and to Mr. J. Michael McGarry, III, Winston
and Strawn, 1200 17th Street, NW., Washington, DC, 20005, attorney for
the licensee.
Nontimely filings of petitions for leave to intervene, amended
petitions, supplemental petitions and/or requests for hearing will not
be entertained absent a determination by the Commission, the presiding
officer or the presiding Atomic Safety and Licensing Board that the
petition and/or request should be granted based upon a balancing of the
factors specified in 10 CFR 2.714(a)(1)(i)-(v) and 2.714(d).
For further details with respect to this action, see the
application for amendment dated July 20, 1998, which is available for
public inspection at the Commission's Public Document Room, the Gelman
Building, 2120 L Street, NW., Washington, DC, and at the local public
document room located at the Oconee County Library, 501 West South
Broad Street, Walhalla, South Carolina.
Dated at Rockville, Maryland, this 21st day of July 1998.
For the Nuclear Regulatory Commission.
David E. LaBarge,
Senior Project Manager, Project Directorate II-2, Division of Reactor
Projects--I/II, Office of Nuclear Reactor Regulation.
[FR Doc. 98-19971 Filed 7-24-98; 8:45 am]