94-18561. Environmental Impact Statements and Regulations; Availability of EPA Comments  

  • [Federal Register Volume 59, Number 145 (Friday, July 29, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-18561]
    
    
    [[Page Unknown]]
    
    [Federal Register: July 29, 1994]
    
    
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    [ER-FRL-4713-7]
    
     
    
    Environmental Impact Statements and Regulations; Availability of 
    EPA Comments
    
        Availability of EPA comments prepared July 11, 1994 through July 
    15, 1994 pursuant to the Environmental Review Process (ERP), under 
    Section 309 of the Clean Air Act and Section 102(2)(C) of the National 
    Environmental Policy Act as amended. Requests for copies of EPA 
    comments can be directed to the Office of Federal Activities at (202) 
    260-5076.
        An explanation of the ratings assigned to draft environmental 
    impact statements (EISs) was published in FR dated April 08, 1994 (59 
    FR 16807).
    
    Draft EISs
    
        ERP No. D-AFS-L65228-ID Rating LO, Tailholt Administrative Research 
    Study, Timber Harvesting and Road Construction, Payette National 
    Forest, Krassel Ranger District, Valley County, ID.
        Summary: EPA found no significant statutory or jurisdictional 
    issues and will not be providing specific review comments at this time.
        ERP No. D-BLM-K60026-CA Rating EO2, Mesquite Regional Landfill 
    Project, Implementation, Federal Land Exchange, Right-of-Way Approval, 
    Conditional-Use-Permit and General Plan Amendment, Imperial County, CA.
        Summary: EPA expressed environmental objections based on potential 
    project impacts to human health and safety and water quality. EPA 
    requested additional information in the final EIS on the fate of 
    cyanide and other metals in the mined heap leach material proposed for 
    use as daily landfill cover; monitoring and mitigation measures to 
    ensure the protection of human health and safety and water quality; and 
    related hydrogeologic information.
        ERP No. D-BLM-L65227-ID Rating EC2, Bennett Hills Resource 
    Management Plan, Implementation, Shoshone District, Lincoln, Gooding, 
    Camas, Jerome, Blaine and Elmore Counties, ID.
        Summary: EPA supports the preferred alternative, however EPA had 
    submitted comments on managing riparian areas to BLM and believed a 
    detailed monitoring plan should be included in the final plan and EIS.
        ERP No. D-COE-L81000-WA Rating EC2, Auburn Thoroughbred Horse 
    Racing Facility, Construction and Operation, COE Section 404 Permit and 
    NPDES Permit, City of Auburn, King County, WA.
        Summary: EPA had environmental concerns about impacts to water 
    quality and wetlands losses. EPA also expressed concerns about the 
    adequacy of the mitigation and monitoring plan.
        ERP No. D-FHW-C40100-NY Rating EC2, I-26 Mohawks River Crossing 
    connecting NYS Thruway Interchange 26, I-890, NYS-5S and NYS-5 
    Construction, Funding, US Coast Guard Permit and COE Section 404 
    Permit, Towns of Rotterdam and Glenville, Schenectady County, NY.
        Summary: EPA expressed environmental concerns about the project 
    because of potential air impacts. Accordingly, additional information 
    must be presented in the final EIS to address this issue.
        ERP No. D-MMS-G02004-00 Rating LO, 1995 Central and Western Gulf of 
    Mexico Outer Continental Shelf (OCS) Oil and Gas Sales 152 (April 1995) 
    and 155 (August 1995), Lease Offering, Offshore Marine Environment and 
    coastal counties, AL, MS, LA and TX.
        Summary: EPA had no objection to the proposed action.
    
    Final EISs
    
        ERP No. F-FHW-C40129-NY NY-9A Reconstruction Project, Battery Place 
    to 59th Street along the western edge of Manhattan, Funding and 
    Approval of Permits, New York County, NY.
        Summary: The final EIS for the Route 9A Reconstruction project has 
    addressed the concerns EPA identified in its review of the draft EIS. 
    Moreover, EPA does not anticipate that the proposed project will result 
    in significant adverse environmental impacts. Accordingly, EPA has no 
    objections to the implementation of the proposed project.
        ERP No. F-SFW-L60008-OR South Tongue Point Land Exchange and Marine 
    Industrial Park Development Project, Control and Management, Land 
    Acquisition and Possible COE Section 10 and 404 Permits, Lewis and 
    Clark National Wildlife Refuge, Clatsop County, OR.
        Summary: Review of the Final EIS has been completed and the project 
    found to be satisfactory.
        ERP No. F-SFW-L64041-OR Hart Mountain National Antelope 
    Comprehensive Management Plan, Implementation, Lake County, OR.
        Summary: EPA comments have been integrated into the final EIS and 
    EPA feels that the final EIS adequately addresses the environmental 
    impacts of the proposed management plan.
        ERP No. F-UAF-K11102-AZ Williams Air Force Base (AFB) Disposal and 
    Reuse, Implementation, Permit and Approval, City of Mesa, Maricopa 
    County, AZ.
        Summary: The final EIS responded to most of EPA's concerns on the 
    draft EIS, but lacked detail on the impacts to burrowing owls.
        ERP No. F-FTA-C54006-NJ Boonton Line/Montclair Branch Rail Lines 
    Corridor Improvements, Funding, Hudson, Morris, Sussex, Essex and 
    Passaic Counties, NJ.
        Summary: EPA had no objections to the implementation of this 
    project.
        ERP No. FS-COE-E32041-FL Fort Pierce Harbor Navigation Improvement, 
    Updated Information concerning Plan Modifications, Indian River, City 
    of Fort Pierce, St. Lucie County, FL.
        Summary: EPA expressed environmental concerns about the habitat 
    losses and the ability to develop an acceptable and adequately funded 
    mitigation plan. Additional information/monitoring will be necessary to 
    determine the significance of these losses and the degree of 
    practicable compensation.
    
    Other
    
        ERP No. LD-BLM-K61129-AZ Rating LO, Arizona Statewide Wild and 
    Scenic Rivers, Suitable or Nonsuitable Designation, National Wild and 
    Scenic Rivers System, several counties, AZ.
        Summary: EPA requested that the final EIS include potential sources 
    of air pollution that may create visibility problems in the river areas 
    and potential sources (direct or indirect) which may impact water 
    quality.
    
        Dated: July 26, 1994.
    William D. Dickerson,
    Deputy Director, Office of Federal Activities.
    [FR Doc. 94-18561 Filed 7-28-94; 8:45 am]
    BILLING CODE 6560-50-U
    
    
    

Document Information

Published:
07/29/1994
Department:
Environmental Protection Agency
Entry Type:
Uncategorized Document
Document Number:
94-18561
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: July 29, 1994, ER-FRL-4713-7