97-19871. NorAm Gas Transmission Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 62, Number 145 (Tuesday, July 29, 1997)]
[Notices]
[Pages 40517-40518]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-19871]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP97-654-000]
NorAm Gas Transmission Company; Notice of Request Under Blanket
Authorization
July 23, 1997.
Take notice that on July 18, 1997, NorAm Gas Transmission Company
(NGT), 1600 Smith Street, Houston, Texas 77002, filed in Docket No.
CP97-654-000 a request pursuant to Sections 157.205, 157.211, and
157.216 of the Commission's Regulations under the Natural Gas Act (18
CFR 157.205, 157.211, and 157.216) for authorization to abandon certain
facilities in Arkansas and construct and operate certain facilities in
Arkansas to deliver gas to Tyson Foods, Inc. under NGT's blanket
[[Page 40518]]
certificate issued in Docket No. CP82-384-000 and CP82-384-001 pursuant
to Section 7 of the Natural Gas Act, all as more fully set forth in the
request that is on file with the Commission and open to public
inspection.
NGT specifically seeks authority to replace and upgrade a delivery
tap. Specifically, NGT seeks authority to abandon an existing 6-inch
meter and two 1-inch regulators and install a 6-inch electronic turbine
meter and two, 1-inch regulators in Logan county, Arkansas. No services
will be abandoned. NGT's total cost are estimated at $8,942.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 97-19871 Filed 7-28-97; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 07/29/1997
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 97-19871
- Pages:
- 40517-40518 (2 pages)
- Docket Numbers:
- Docket No. CP97-654-000
- PDF File:
-
97-19871.pdf