E8-17288. FFP Missouri 8, LLC, FFP Missouri 9, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
-
Start Preamble
July 22, 2008.
On April 18, 2008, FFP Missouri 8, LLC and FFP Missouri 9, LLC (Free Flow Power Corporation) each filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Missouri River 8 and the Missouri River 9 Projects, to be located in the Missouri River in St. Charles and Franklin Counties, Missouri.
The proposed Missouri River 8 project consists of: (1) 1,920 proposed 20-kilowatt Free Flow generating units having a total installed capacity of 38.4-megawatts, (2) a mooring system, (3) a proposed transmission line, and (4) appurtenant facilities. The proposed Missouri River Project 8 would have an average annual generation of 168,192-gigawatt-hours and be sold to a local utility.
The proposed Missouri River 9 project consists of: (1) 3,720 proposed 20-kilowatt Free Flow generating units having a total installed capacity of 74.4-megawatts, (2) a mooring system, (3) a proposed transmission line, and (4) appurtenant facilities. The proposed Missouri River Project 9 would have an average annual generation of 325,872-gigawatt-hours and be sold to a local utility.
Applicant Contact: Mr. Daniel R. Irwin, Free Flow Power Corporation, 33 Commercial Street, Gloucester, MA 01930, phone: 978-232-3536.
FERC Contact: Patricia W. Gillis (202) 502-8735.
Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically Start Printed Page 43931via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site under the “e-Filing” link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission's Web site located at http://www.ferc.gov/filing-comments.asp. More information about this project can be viewed or printed on the “eLibrary” link of Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-13186 or P-13187) in the docket number field to access the document. For assistance, call toll-free 1-866-208-3372.
Start SignatureKimberly D. Bose,
Secretary.
[FR Doc. E8-17288 Filed 7-28-08; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Comments Received:
- 0 Comments
- Published:
- 07/29/2008
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- E8-17288
- Pages:
- 43930-43931 (2 pages)
- Docket Numbers:
- Project No. 13186-000, Project No. 13187-000
- EOCitation:
- of 2008-07-22
- PDF File:
- e8-17288.pdf