2014-17958. Excavations (Design of Cave-In Protection Systems); Extension of the Office of Management and Budget's (OMB) Approval of Information Collection (Paperwork) Requirements  

  • Start Preamble

    AGENCY:

    Occupational Safety and Health Administration (OSHA), Labor.

    ACTION:

    Request for public comments.

    SUMMARY:

    OSHA solicits public comments concerning its proposal to extend OMB approval of the information collection requirements contained in the Standard on Excavations (Design of Cave-in Protection Systems) (29 CFR part 1926, subpart P).

    DATES:

    Comments must be submitted (postmarked, sent, or received) by September 29, 2014.

    ADDRESSES:

    Electronically: You may submit comments and attachments electronically at http://www.regulations.gov,, which is the Federal eRulemaking Portal. Follow the instructions online for submitting comments.

    Facsimile: If your comments, including attachments, are not longer than 10 pages you may fax them to the OSHA Docket Office at (202) 693-1648.

    Mail, hand delivery, express mail, messenger, or courier service: When using this method, you must submit a copy of your comments and attachments to the OSHA Docket Office, OSHA Docket No. OSHA-2011-0057, U.S. Department of Labor, Occupational Safety and Health Administration, Room N-2625, 200 Constitution Avenue NW., Washington, DC 20210. Deliveries (hand, express mail, messenger, and courier service) are accepted during the Department of Labor's and Docket Office's normal business hours, 8:15 a.m. to 4:45 p.m., e.t.

    Instructions: All submissions must include the Agency name and the OSHA docket number (OSHA-2011-0057) for the Information Collection Request (ICR). All comments, including any personal information you provide, are placed in the public docket without change, and may be made available online at http://www.regulations.gov. For further information on submitting comments see the “Public Participation” heading in the section of this notice titled SUPPLEMENTARY INFORMATION.

    Docket: To read or download comments or other material in the Start Printed Page 44200docket, go to http://www.regulations.gov or the OSHA Docket Office at the address above. All documents in the docket (including this Federal Register notice) are listed in the http://www.regulations.gov index; however, some information (e.g., copyrighted material) is not publicly available to read or download from the Web site. All submissions, including copyrighted material, are available for inspection and copying at the OSHA Docket Office. You may also contact Michael Buchet at the address below to obtain a copy of the ICR.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Michael Buchet, Directorate of Construction, OSHA, U.S. Department of Labor, Room N-3468, 200 Constitution Avenue NW., Washington, DC 20210; telephone (202) 693-2020.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    I. Background

    The Department of Labor, as part of its continuing effort to reduce paperwork and respondent (i.e., employer) burden, conducts a preclearance consultation program to provide the public with an opportunity to comment on proposed and continuing information collection requirements in accord with the Paperwork Reduction Act of 1995 (PRA-95) (44 U.S.C. 3506(c)(2)(A)). This program ensures that information is in the desired format, reporting burden (time and costs) is minimal, collection instruments are clearly understood, and OSHA's estimate of the information collection burden is accurate. The Occupational Safety and Health Act of 1970 (the OSH Act) (29 U.S.C. 651 et seq.) authorizes information collection by employers as necessary or appropriate for enforcement of the Act or for developing information regarding the causes and prevention of occupational injuries, illnesses, and accidents (29 U.S.C. 657). The OSH Act also requires that OSHA obtain such information with minimum burden upon employers, especially those operating small businesses, and to reduce to the maximum extent feasible unnecessary duplication of efforts in obtaining information (29 U.S.C. 657).

    Paragraphs (b) and (c) of § 1926.652 (“Requirements for Protective Systems”; the “Standard”) contain paperwork requirements that impose burden hours or costs on employers. These paragraphs require employers to use protective systems to prevent cave-ins during excavation work; these systems include sloping the side of the trench, benching the soil away from the excavation, or using a support system or shield (such as a trench box). The Standard specifies allowable configurations and slopes for excavations, and provides appendices to assist employers in designing protective systems. However, paragraphs (b)(3) and (b)(4) of the Standard permit employers to design sloping or benching systems based on tabulated data (Option 3), or to use a design approved by a registered professional engineer (Option 4).

    Under Option 3, employers must provide the tabulated data in a written form that also identifies the registered professional engineer who approved the data and the parameters used to select the sloping or benching system drawn from the data, as well as the limitations of the data (including the magnitude and configuration of slopes determined to be safe). The document must also provide any explanatory information necessary to select the correct benching system based on the data. Option 2 requires employers to develop a written design approved by a registered professional engineer. The design information must include the magnitude and configuration of the slopes determined to be safe, and the identity of the registered professional engineer who approved the design.

    Paragraph (c)(2)(iii) allows employers to use manufacturer's tabulated data or to deviate from the data provided. The manufacturer's specification, recommendations and limitations as well as the manufacturer's approval to deviate from these items shall be in writing. Paragraphs (c)(3) and (c)(4) allow employers to design support systems, shield systems, and other protective systems based on tabulated data provided by a system manufacturer (Option 3) or obtained from other sources including a registered professional engineer and approved by a registered professional engineer (Option 4).

    Each of these provisions requires employers to maintain a copy of the documents described in these options at the jobsite during construction. After construction is completed, employers may store the documents off-site provided they make them available to an OSHA compliance officer on request. These documents provide both the employer and the compliance officer with information needed to determine if the selection and design of a protective system are appropriate to the excavation work, thereby assuring workers of maximum protection against cave-ins.

    II. Special Issues for Comment

    OSHA has a particular interest in comments on the following issues:

    • Whether the proposed information collection requirements are necessary for the proper performance of the Agency's functions, including whether the information is useful;
    • The accuracy of OSHA's estimate of the burden (time and costs) of the information collection requirements, including the validity of the methodology and assumptions used;
    • The quality, utility, and clarity of the information collected; and
    • Ways to minimize the burden on employers who must comply; for example, by using automated or other technological information collection and transmission techniques.

    III. Proposed Actions

    The Agency is requesting that OMB extend its approval of the information collection requirements contained in the Standard on Excavations (Design of Cave-in Protection Systems). An increase in the number of construction starts from 706,000 starts to 761,873 contracted for projects/sites has resulted in an adjustment increase in burden hours from 11,813 to 14,266, a total increase of 2,453 burden hours.

    OSHA reduced the number of apartment and non-residential construction sites that would use outside contractor engineering services for the required protective system design approval from 5,900 to 2,038. While there was an increase in the hourly wage for a civil engineer from $49.04 to $53.17, there is an overall adjustment decrease of −$359,687 from $578,672 to $218,985.

    The Agency will summarize any comments submitted in response to this notice and will include this summary in the request to OMB to extend the approval of the information collection requirements contained in the Standard.

    Type of Review: Extension of a currently approved collection.

    Title: Excavations (Design of Cave-in Protection Systems) (29 CFR part 1926, subpart P).

    OMB Control Number: 1218-0137.

    Affected Public: Business or other for-profits.

    Number of Respondents: 8,152.

    Number of Responses: 24,453.

    Frequency of Responses: On occasion.

    Average Time per Response: Two hours to obtain information on the design of cave-in protection systems.

    Estimated Total Burden Hours: 14,266 hours.

    Estimated Cost (Operation and Maintenance): $218,895.

    IV. Public Participation—Submission of Comments on This Notice and Internet Access to Comments and Submissions

    You may submit comments in response to this document as follows: (1) Electronically at http:// Start Printed Page 44201 www.regulations.gov,, which is the Federal eRulemaking Portal; (2) by facsimile (fax); or (3) by hard copy. All comments, attachments, and other material must identify the Agency name and the OSHA docket number (Docket No. OSHA-2011-0057) for the ICR. You may supplement electronic submissions by uploading document files electronically. If you wish to mail additional materials in reference to an electronic or facsimile submission, you must submit them to the OSHA Docket Office (see the section of this notice titled ADDRESSES). The additional materials must clearly identify your electronic comments by your name, date, and the docket number so the Agency can attach them to your comments.

    Because of security procedures, the use of regular mail may cause a significant delay in the receipt of comments. For information about security procedures concerning the delivery of materials by hand, express delivery, messenger, or courier service, please contact the OSHA Docket Office at (202) 693-2350, (TTY (877) 889-5627).

    Comments and submissions are posted without change at http://www.regulations.gov. Therefore, OSHA cautions commenters about submitting personal information such as social security numbers and date of birth. Although all submissions are listed in the http://www.regulations.gov index, some information (e.g., copyrighted material) is not publicly available to read or download from this Web site. All submissions, including copyrighted material, are available for inspection and copying at the OSHA Docket Office. Information on using the http://www.regulations.gov Web site to submit comments and access the docket is available at the Web site's “User Tips” link. Contact the OSHA Docket Office for information about materials not available from the Web site and for assistance in using the Internet to locate docket submissions.

    V. Authority and Signature

    David Michaels, Ph.D., MPH, Assistant Secretary of Labor for Occupational Safety and Health, directed the preparation of this notice. The authority for this notice is the Paperwork Reduction Act of 1995 (44 U.S.C. 3506 et seq.) and Secretary of Labor's Order No. 1-2012 (77 FR 3912).

    Start Signature

    Signed at Washington, DC, on July 25, 2014.

    David Michaels,

    Assistant Secretary of Labor for Occupational Safety and Health.

    End Signature End Supplemental Information

    [FR Doc. 2014-17958 Filed 7-29-14; 8:45 am]

    BILLING CODE 4510-26-P

Document Information

Published:
07/30/2014
Department:
Occupational Safety and Health Administration
Entry Type:
Notice
Action:
Request for public comments.
Document Number:
2014-17958
Dates:
Comments must be submitted (postmarked, sent, or received) by September 29, 2014.
Pages:
44199-44201 (3 pages)
Docket Numbers:
Docket No. OSHA-2011-0057
PDF File:
2014-17958.pdf
Supporting Documents:
» Agency Information Collection Activities: Announcement of the Office of Management and Budget (OMB) Control Numbers Under the Paperwork Reduction Act
» Supporting Statement for the Information Collection Requirements of the Standard on Excavations (Design of Cave-in Protection Systems) (29 CFR Part 1926, Subpart P)1 Office of Management and Budget (OMB) Control Number 1218-0137 (October 2020)
» Excavations (Design of Cave-in Protection Systems); Extension of the Office of Management and Budget’s (OMB) Approval of Information Collection (Paperwork) Requirements
» Agency Information Collection Activities: Announcement of the Office of Management and Budget (OMB) Control Numbers Under the Paperwork Reduction Act
» Supporting Statement for the Information Collection Requirements of the Standard on Excavations (Design of Cave-in Protection Systems) (29 CFR Part 19226, Subpart P)1 Office of Management and Budget (OMB) Control Number 1218-0137 (November 2017)
» Excavations (Design of Cave-in Protection Systems); Extension of the Office of Management and Budget’s (OMB) Approval of Information Collection (Paperwork) Requirements
» Agency Information Collection Activities: Announcement of the Office of Management and Budget (OMB) Control Numbers Under the Paperwork Reduction Act
» Supporting Statement for the Information Collection Requirements of the Standard on Excavations (Design of Cave-In Protection Systems) (29 CFR Part 1926, Subpart P) Office of Management and Budget (OMB) Control Number 1218-0137 (July 2014)
» Excavations (Design of Cave-In Protection Systems); Extension of the Office of Management and Budget’s (OMB) Approval of Information Collection (Paperwork) Requirements
» Excavations (Design of Cave-in Protection Systems)(29 CFR part 1926, subpart P).