96-19384. Transcontinental Gas Pipe Line Corporation; Notice of Proposed Changes in FERC Gas Tariff
[Federal Register Volume 61, Number 148 (Wednesday, July 31, 1996)]
[Notices]
[Page 39957]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-19384]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. TM96-15-29-000]
Transcontinental Gas Pipe Line Corporation; Notice of Proposed
Changes in FERC Gas Tariff
July 25, 1996.
Take notice that on July 22, 1996 Transcontinental Gas Pipe Line
Corporation (Transco) tendered for filing certain revised tariff sheets
to its FERC Gas Tariff, Third Revised Volume No. 1 which tariff sheets
are enumerated in Appendix A attached to the filing.
Transco states that the purpose of the instant filing is to track
rate changes attributable to (a) transportation and storage service
purchased from National Fuel Gas Supply Corporation (National Fuel)
under its Rate Schedule X-42 and SS-1 the costs of which are included
in the rates and charges payable under Transco's Rate Schedule LSS, (b)
transportation and storage service purchased from National Fuel under
its Rate Schedule X-54 and SS-1 the costs of which are included in the
rates and charges payable under Transco's Rate Schedule SS-2, (c)
transportation services purchased from National Fuel under its Rate
Schedule X-58 the costs of which are included in the rates and charges
payable under Transco's Niagara Import Point Project--System Expansion
(NIPPs-SE), and (d) transportation service purchased from Texas Gas
Transmission Corporation (Texas Gas) under its rate schedule FT the
costs of which are included in the rates and charges payable under
Transco's Rate Schedule FT-NT.
Transco states that the tracking filing is being made pursuant to
Section 4 of Transco's Rate Schedule LSS, Section 4 of Transco's Rate
Schedule SS-2, Section 8.01(i) of Transco's NIPPs-SE Rate Schedule X-
315, and Section 4 of Transco's Rate Schedule FT-NT.
Transco states that included in Appendix B, C, and D attached to
the filing are explanations of the rate changes and details regarding
the computation of the revised Rate Schedule LSS, SS-2, NIPPs-SE, and
FT-NT rates.
Transco states that copies of the filing are being mailed to each
of its LSS, SS-2, NIPPs-SE, and FT-NT customers and interested State
Commissions.
Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, Washington, D.C. 20426, in
accordance with Sections 385.214 and 385.211 of the Commission's Rules
and Regulations. All such motions or protests must be filed as provided
in Section 154.210 of the Commission's Regulations. Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a motion to
intervene. Copies of this filing are on file with the Commission and
are available for public inspection in the Public Conference Room.
Lois D. Cashell,
Secretary.
[FR Doc. 96-19384 Filed 7-30-96; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 07/31/1996
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 96-19384
- Pages:
- 39957-39957 (1 pages)
- Docket Numbers:
- Docket No. TM96-15-29-000
- PDF File:
-
96-19384.pdf