97-20036. Notice of Amendment to Certificate of Compliance GDP-2 for the U.S. Enrichment Corporation Portsmouth Gaseous Diffusion Plant Portsmouth, Ohio  

  • [Federal Register Volume 62, Number 147 (Thursday, July 31, 1997)]
    [Notices]
    [Pages 41100-41101]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-20036]
    
    
    -----------------------------------------------------------------------
    
    NUCLEAR REGULATORY COMMISSION
    
    [Docket 70-7002]
    
    
    Notice of Amendment to Certificate of Compliance GDP-2 for the 
    U.S. Enrichment Corporation Portsmouth Gaseous Diffusion Plant 
    Portsmouth, Ohio
    
        The Director, Office of Nuclear Material Safety and Safeguards, has 
    made a determination that the following amendment request is not 
    significant in accordance with 10 CFR 76.45. In making that 
    determination the staff concluded that (1) there is no change in the 
    types or significant increase in the amounts of any effluents that may 
    be released offsite; (2) there is no significant increase in individual 
    or cumulative occupational radiation exposure; (3) there is no 
    significant construction impact; (4) there is no significant increase 
    in the potential for, or radiological or chemical consequences from, 
    previously analyzed accidents; (5) the proposed changes do not result 
    in the possibility of a new or different kind of accident; (6) there is 
    no significant reduction in any margin of safety; and (7) the proposed 
    changes will not result in an overall decrease in the effectiveness of 
    the plant's safety, safeguards or security programs. The basis for this 
    determination for the amendment request is shown below.
        The NRC staff has reviewed the certificate amendment application 
    and concluded that it provides reasonable assurance of adequate safety, 
    safeguards, and security, and compliance with NRC requirements. 
    Therefore, the Director, Office of Nuclear Material Safety and 
    Safeguards, is prepared to issue an amendment to the Certificate of 
    Compliance for the Portsmouth Gaseous Diffusion Plant. The staff has 
    prepared a Compliance Evaluation Report which provides details of the 
    staff's evaluation.
        The NRC staff has determined that this amendment satisfies the 
    criteria for a categorical exclusion in accordance with 10 CFR 51.22. 
    Therefore, pursuant to 10 CFR 51.22(b), no environmental impact 
    statement or environmental assessment need be prepared for this 
    amendment.
        USEC or any person whose interest may be affected may file a 
    petition, not exceeding 30 pages, requesting review of the Director's 
    Decision. The petition must be filed with the Commission not later than 
    15 days after publication of this Federal Register Notice. A petition 
    for review of the Director's Decision shall set forth with 
    particularity the interest of the petitioner and how that interest may 
    be affected by the results of the decision. The petition should 
    specifically explain the reasons why review of the Decision should be 
    permitted with particular reference to the following factors: (1) The 
    interest of the petitioner; (2) how that interest may be affected by 
    the Decision, including the reasons why the petitioner should be 
    permitted a review of the Decision; and (3) the petitioner's areas of 
    concern about the activity that is the subject matter of the Decision. 
    Any person described in this paragraph (USEC or any person who filed a 
    petition) may file a response to any petition for review, not to exceed 
    30 pages, within 10 days after filing of the petition. If no petition 
    is received within the designated 15-day period, the Director will 
    issue the final amendment to the Certificate of Compliance without 
    further delay. If a petition for review is received, the decision on 
    the amendment application will become final in 60 days, unless the 
    Commission grants the petition for review or otherwise acts within 60 
    days after publication of this Federal Register Notice.
        A petition for review must be filed with the Secretary of the 
    Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
    0001, Attention: Rulemakings and Adjudications Staff, or may be 
    delivered to the Commission's Public Document Room, the Gelman 
    Building, 2120 L Street, NW, Washington, DC, by the above date.
        For further details with respect to the action see (1) the 
    application for amendment and (2) the Commission's Compliance 
    Evaluation Report. These items are available for public inspection at 
    the Commission's Public Document Room, the Gelman Building, 2120 L 
    Street, NW, Washington, DC, and at the Local Public Document Room.
        Date of amendment request: April 28, 1997
        Brief description of amendment: The proposed amendment corrects a 
    typographical error contained in Technical Safety Requirement 2.6.4.2 
    entitled ``Air Gaps'' by revising Surveillance Requirement 2.6.4.2.1 
    from ``Verify and document the pressure of air gaps required by NCSAs'' 
    to ``Verify and document the presence of air gaps required by NCSAs.''
    
    Basis for Finding of No Significance
    
        1. The proposed amendment will not result in a change in the types 
    or significant increase in the amounts of any effluents that may be 
    released offsite.
        The amendment corrects a typographical error in the surveillance 
    requirement of Technical Safety Requirement 2.6.4.2 by replacing the 
    word ``pressure'' with ``presence.'' As such, the proposed amendment 
    will not result in a change in the types or significant increase in the 
    amounts of any effluents that may be released offsite.
        2. The proposed amendment will not result in a significant increase 
    in individual or cumulative occupational radiation exposure.
        The proposed amendment will not increase radiation exposure.
        3. The proposed amendment will not result in a significant 
    construction impact.
        The proposed amendment will not result in any construction, 
    therefore, there will be no construction impacts.
        4. The proposed amendment will not result in a significant increase 
    in the potential for, or radiological or chemical consequences from, 
    previously analyzed accidents.
        The proposed change involves correction of a typographical error. 
    As such, it does not affect the potential for,
    
    [[Page 41101]]
    
    or radiological or chemical consequences from, previously evaluated 
    accidents.
        5. The proposed amendment will not result in the possibility of a 
    new or different kind of accident.
        The change will not create new operating conditions or a new plant 
    configuration that could lead to a new or different type of accident.
        6. The proposed amendment will not result in a significant 
    reduction in any margin of safety.
        The proposed change corrects a typographical error. As such, there 
    is no reductions in the margins of safety.
        7. The proposed amendment will not result in an overall decrease in 
    the effectiveness of the plant's safety, safeguards or security 
    programs.
        The proposed amendment corrects a typographical error. As such, the 
    effectiveness of the safety, safeguards, and security programs is not 
    decreased.
        Effective date: 30 days after issuance
        Certificate of Compliance No. GDP-2: Amendment will incorporate a 
    revised Surveillance Requirement of a Technical Safety Requirement.
        Local Public Document Room location: Portsmouth Public Library, 
    1220 Gallia Street, Portsmouth, Ohio 45662.
    
        Dated at Rockville, Maryland, this 22nd day of July 1997.
    
        For the Nuclear Regulatory Commission
    Carl J. Paperiello,
    Director Office of Nuclear Material Safety and Safeguards.
    [FR Doc. 97-20036 Filed 7-30-97; 8:45 am]
    BILLING CODE 7590-01-P
    
    
    

Document Information

Published:
07/31/1997
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Document Number:
97-20036
Dates:
30 days after issuance
Pages:
41100-41101 (2 pages)
Docket Numbers:
Docket 70-7002
PDF File:
97-20036.pdf