97-20119. Texas Gas Transmission Corporation; Notice of Request Under Blanket Authority
[Federal Register Volume 62, Number 147 (Thursday, July 31, 1997)]
[Notices]
[Pages 41036-41037]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-20119]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP97-655-000]
Texas Gas Transmission Corporation; Notice of Request Under
Blanket Authority
July 25, 1997.
Take notice that on July 21, 1997, Texas Gas Transmission
Corporation (Texas Gas), 3800 Frederica Street, Owensboro, Kentucky
42301, filed in Docket No. CP97-614-000 a request pursuant to Sections
157.205 and 157.211 of the Commission's Regulations under the Natural
Gas Act (18 CFR 157.205, 157.211) for authorization to add an
interconnect with Badger Oil Company (Badger), located in Terrebonne
Parish, Louisiana, under Texas Gas' certificate issued in Docket No.
CP82-407-000, pursuant to Section 7(c) of the Natural Gas Act, all as
more fully set forth in the request that is on file with the Commission
and open to public inspection.
Texas Gas proposes to modify an existing receipt point, which
consists of a dual 2-inch meter run and electronic measurement
equipment, to provide bidirectional measurement capability in order to
provide gas lift service requested by Badger. Texas Gas states this
existing point is located on their Bay Junop-Bay Round 8-Inch Line, at
Pass Wilson platform, Ship Shoal Block 41, Offshore Louisiana.
Texas Gas states that Badger will reimburse them in full for the
cost of the facilities to be installed by Texas Gas, which cost is
estimated to be $11,000.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a
[[Page 41037]]
protest to the request. If no protest is filed within the time allowed
therefor, the proposed activity shall be deemed to be authorized
effective the day after the time allowed for filing a protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request shall be treated as
an application for authorization pursuant to section 7 of the Natural
Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 97-20119 Filed 7-30-97; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 07/31/1997
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 97-20119
- Pages:
- 41036-41037 (2 pages)
- Docket Numbers:
- Docket No. CP97-655-000
- PDF File:
-
97-20119.pdf