2024-16858. City of Tualatin, Oregon; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene
Table 1—Criteria for Qualifying Conduit Hydropower Facility
Statutory provision Description Satisfies (Y/N) FPA 30(a)(3)(A) The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity Y FPA 30(a)(3)(C)(i) The facility is constructed, operated, or maintained for the generation of electric power and uses for such generation only the hydroelectric potential of a non-federally owned conduit Y FPA 30(a)(3)(C)(ii) The facility has an installed capacity that does not exceed 40 megawatts Y FPA 30(a)(3)(C)(iii) On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA Y
Document Information
- Published:
- 07/31/2024
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2024-16858
- Pages:
- 61415-61416 (2 pages)
- Docket Numbers:
- Docket No. CD24-3-000
- PDF File:
- 2024-16858.pdf