2024-16858. City of Tualatin, Oregon; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene  

  • Table 1—Criteria for Qualifying Conduit Hydropower Facility

    Statutory provision Description Satisfies (Y/N)
    FPA 30(a)(3)(A) The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity Y
    FPA 30(a)(3)(C)(i) The facility is constructed, operated, or maintained for the generation of electric power and uses for such generation only the hydroelectric potential of a non-federally owned conduit Y
    FPA 30(a)(3)(C)(ii) The facility has an installed capacity that does not exceed 40 megawatts Y
    FPA 30(a)(3)(C)(iii) On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA Y

Document Information

Published:
07/31/2024
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2024-16858
Pages:
61415-61416 (2 pages)
Docket Numbers:
Docket No. CD24-3-000
PDF File:
2024-16858.pdf