95-16350. Paiute Pipeline Company; Notice of Amendment  

  • [Federal Register Volume 60, Number 128 (Wednesday, July 5, 1995)]
    [Notices]
    [Pages 34978-34979]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-16350]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP94-29-001]
    
    
    Paiute Pipeline Company; Notice of Amendment
    
    June 28, 1995.
        Take notice that on March 27, 1995, Paiute Pipeline Company 
    (Paiute), P.O. Box 94197, Las Vegas, Nevada 89193-4197, filed in Docket 
    No. CP94-29-001, pursuant to Section 7 of the Natural Gas Act, an 
    amendment to its October 15, 1993 application in Docket No. CP94-29-
    001, requesting authorization to construct and operate certain pipeline 
    loop and pressure regulation and measurement facilities, in order to 
    enable Southwest Gas Corporation-Northern California (Southwest-
    Northern California) to serve the city of Truckee, California, and 
    environs, and to increase Paiute's capacity to provide additional 
    delivery point flexibility to Southwest Gas Corporation-Northern Nevada 
    (Southwest-Northern Nevada) in its Incline Village, Nevada market area, 
    all as more fully set forth in the amendment which is on file with the 
    Commission and open for public inspection.
        Paiute states that on October 15, 1993, Paiute filed its 
    application in Docket No. CP94-29-000, in which it requested various 
    certificate authorizations pursuant to Section 7(c) of the Natural Gas 
    Act. Paiute indicates that the purpose of the requested authorizations 
    was to permit it to transport up to 10,333 Dth/d of additional gas to 
    Southwest-Northern California at its existing delivery point to enable 
    Southwest-Northern California to provide new natural gas service to the 
    Truckee area. In addition, Paiute states that the facilities proposed 
    in its October 15, 1993 application would enable Paiute to provide 
    additional delivery point flexibility to Southwest-Northern Nevada such 
    that Southwest-Northern Nevada could receive additional quantities of 
    up to 2,455 Dth/d of gas at delivery points in Southwest-Northern 
    Nevada's Incline Village market area along the North Tahoe Lateral, and 
    up to 1,496 Dth/d of gas at a delivery point on the Elko Lateral.
        Paiute indicates that Southwest-Northern California has recently 
    reevaluated various pipeline transportation options, and has now 
    requested that Paiute expand its system to add delivery capacity 
    between the Wadsworth Junction, where Paiute's mainline divides between 
    its Reno Lateral and Carson Lateral, and the existing delivery point to 
    Southwest-Northern California at the terminus of Paiute's North Tahoe 
    Lateral.
        Consequently, Paiute, by its amendment, now requests authorization 
    in this proceeding to construct and operate pipeline loop and 
    measurement and pressure regulating facilities so as to expand the 
    delivery capacity of its system between the Wadsworth Junction and the 
    terminus of its North Tahoe Lateral by 12,788 Dth/d. Paiute states that 
    the proposed facilities will enable it to provide additional firm 
    transportation service between those points to Southwest-Northern 
    California of 10,333 Dth/d, and will enable Paiute to accommodate 
    Southwest-Northern Nevada's request to provide it with additional 
    delivery capacity to its Incline Village delivery points of 2,455 Dth/
    d. Paiute further states that it will file a new certificate 
    application in a separate docket to request authorization for the Elko 
    Lateral compressor stations.
        Specifically, Paiute now proposes to:
        (1) Construct and operate 11.1 miles of 16-inch loop pipeline and 
    3.0 miles of 12-inch loop pipeline on its North Tahoe Lateral;
        (2) Construct and operate 5.8 miles of 12-inch loop pipeline on its 
    South Tahoe Lateral;
        (3) Install pressure regulating equipment at the California Check 
    Meter station on its North Tahoe Lateral;
        (4) Relocate the South Tahoe Lateral pressure reduction station; 
    and
        (5) Modify the Wadsworth Junction pressure regulation station.
        Paiute states that the estimated cost the proposed facilities if 
    $10,451,878. Paiute intends to finance the cost of construction through 
    ongoing regular financing programs and internally generated funds.
        Paiute states that it has entered into a new transportation service 
    agreement with Southwest-Northern California to transport an additional 
    10,333 Dth/d of gas to it. Paiute further states that it has entered 
    into a transportation service 
    
    [[Page 34979]]
    agreement with Southwest-Northern Nevada under which it would increase 
    its billing determinants by 2,455 Dth/d under Paiute's Rate Schedule 
    FT-1.
        Paiute proposes that the rates for the services to be provided by 
    means of the proposed facilities be designed using an incremental 
    facilities surcharge in Rate Schedule FT-1 applicable to the two 
    shippers receiving additional service as a result of the expansion, 
    under which the costs and revenues related to the construction of the 
    proposed facilities for service to the Truckee and Incline Village 
    areas will be considered on an incremental cost basis.
        Any person desiring to be heard or to make any protest with 
    reference to said amendment should, on or before July 19, 1995 file 
    with the Federal Energy Regulatory Commission, Washington, D.C. 20426, 
    a motion to intervene or a protest in accordance with the requirements 
    of the Commission Rules of practice and Procedure (18 CFR 385.211 or 
    385.214) and the Regulations under the Natural Gas Act (18 CFR 157.10). 
    All protest filed with the commission will be considered by it in 
    determining the appropriate action to be taken but will not serve to 
    make the protestants parties to the proceedings. Any person wishing to 
    become a party to a proceeding or to participate as a party in any 
    hearing therein must file a motion to intervene in accordance with the 
    Commission's Rules. All person who have heretofore filed need not file 
    again.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-16350 Filed 7-3-95; 8:45 am]
    BILLING CODE 8010-01-M
    
    

Document Information

Published:
07/05/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-16350
Pages:
34978-34979 (2 pages)
Docket Numbers:
Docket No. CP94-29-001
PDF File:
95-16350.pdf