[Federal Register Volume 61, Number 130 (Friday, July 5, 1996)]
[Notices]
[Pages 35247-35248]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-17129]
-----------------------------------------------------------------------
[[Page 35248]]
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[NV-942-06-1420-00]
Filing of Plats of Survey; Nevada
AGENCY: Bureau of Land Management.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The purpose of this notice is to inform the public and
interested State and local government officials of the filing of Plats
of Survey in Nevada.
EFFECTIVE DATE: Filing is effective at 10:00 a.m. on the dates
indicated below.
FOR FURTHER INFORMATION CONTACT: Robert H. Thompson, Acting Chief,
Cadastral Survey, Bureau of Land Management (BLM), Nevada State Office,
850 Harvard Way, P.O. Box 12000, Reno, Nevada 89520, 702-785-6541.
SUPPLEMENTARY INFORMATION: 1. The Supplemental Plat of the
following described lands was officially filed at the Nevada State
Office, Reno, Nevada on March 7, 1996:
The plat showing a subdivision of original lot 1, section 24,
Township 21 South, Range 53 East, Mount Diablo Meridian, Nevada, was
accepted March 5, 1996.
This plat was prepared to meet certain admnistrative needs of the
Bureau of Land Management.
2. The Plat of Survey of the following described lands was
officially filed at the Nevada State Office, Reno, Nevada on June 26,
1996:
The plat, in two (2) sheets, representing the dependent resurvey of
a portion of the north boundary, a portion of the subdivisional lines,
and a portion of the Boulder Canyon Project Federal Reservation
Boundary, and the subdivision of sections 2, 11, and 14, Township 23
South, Range 63 East, Mount Diablo Meridian, Nevada, under Group No.
760, was accepted June 25, 1996.
This survey was executed to meet certain administrative needs of
the Bureau of Land Management.
3. The Plats of Survey of the following described lands will be
officially filed at the Nevada State Office, Reno, Nevada on August 22,
1996:
The plat, in six (6) sheets, representing the dependent resurvey of
a portion of the north boundary and the east boundary of Township 40
North, Range 63 East; and the dependent resurvey of the Eighth Standard
Parallel North, through a portion of Ranges 63 and 64 East, the south
boundary and a portion of the west boundary, and the dependent and
independent resurvey of the subdivisional lines, and the metes-and-
bounds survey of Tracts 42 through 49, and the survey of sections 37
through 41, Township 40 North, Range 64 East, Mount Diablo Meridian,
Nevada, under Group No. 676, was accepted June 18, 1996.
The plat representing the dependent resurvey of the Eighth Standard
Parallel North, through a portion of Ranges 62 and 63 East; and the
dependent resurvey of a portion of the north boundary of Township 40
North, Range 63 East; and the dependent resurvey of a portion of the
east boundary of Township 40 North, Range 62 East; and the survey of
the subdivisional lines of Township 40\1/2\ North, Range 63 East, Mount
Diablo Meridian, Nevada, under Group No. 676, was accepted June 18,
1996.
The plat, in two (2) sheets, representing the dependent resurvey of
the Eighth Standard Parallel North, through a portion of Range 62 East,
the east boundary, a portion of the north boundary and a portion of the
subdivisional lines of Township 41 North, Range 62 East, Mount Diablo
Meridian, Nevada, under Group No. 676, was accepted June 18, 1996.
The plat, in two (2) sheets, representing the dependent resurvey of
the west and north boundaries and the subdivisional lines, and the
subdivision of section 30, Township 41 North, Range 63 East, Mount
Diablo Meridian, Nevada, under Group No. 676, was accepted June 18,
1996.
The plat representing the dependent resurvey of the south boundary
of Township 42 North, Range 64 East; and the dependent resurvey of the
west boundary and a portion of the subdivisional lines of Township 41
North, Range 64 East, Mount Diablo Meridian, Nevada, under Group No.
676, was accepted June 18, 1996.
The plat comprising the boundaries of Township 40\1/2\ North, Range
62\1/2\ East, Mount Diablo Meridian, Nevada, under Group No. 676, was
accepted June 18, 1996.
These surveys were executed to meet certain administrative needs of
the Bureau of Land Management.
4. Subject to valid existing rights the provisions of existing
withdrawals and classifications, the requirements of applicable laws,
and other segregations of record, those portions of the lands listed
under item 3 that are original surveys are open to application,
petition, and disposal, including application under the mineral leasing
laws. All such valid applications received on or prior to August 22,
1996, shall be considered as simultaneously filed at that time. Those
received thereafter shall be considered in order of filing.
5. The above-listed surveys are now the basic record for describing
the lands for all authorized purposes. These surveys have been placed
in the open files in the BLM Nevada State Office and are available to
the public as a matter of information. Copies of the surveys and
related field notes may be furnished to the public upon payment of the
appropriate fees.
Dated: June 27, 1996.
Robert H. Thompson,
Acting Chief Cadastral Surveyor, Nevada.
[FR Doc. 96-17129 Filed 7-3-96; 8:45 am]
BILLING CODE 4310-HC-P