96-17162. Environmental Impact Statements; Notice of Availability  

  • [Federal Register Volume 61, Number 130 (Friday, July 5, 1996)]
    [Notices]
    [Pages 35210-35211]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-17162]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    
    [ER-FRL-5471-1]
    
    
    Environmental Impact Statements; Notice of Availability
    
        Responsible Agency: Office of Federal Activities, General 
    Information (202) 564-7167 OR (202) 564-7153.
        Weekly receipt of Environmental Impact Statements Filed June 24, 
    1996 Through June 28, 1996 Pursuant to 40 CFR 1506.9.
        EIS No. 960299, Final EIS, FRC, GA, SC, North Georgia Hydroelectric 
    Project, (FERC. No. 2354-018) Issuance of Relicensing, Savannah River 
    Basin, Tallulah, Tugalo and Chattooga Rivers, GA and SC, Due: August 
    05, 1996, Contact: Joe Davis (202) 219-2865.
        EIS No. 960300, Draft Supplement, FHW, AL, Tuscaloosa East Bypass 
    Corridor, Construction, I-59/I-20 east of Tuscaloosa to US 82 west of 
    Northport, Funding, NPDES Permit, COE Section 10 and 404 Permits, 
    Tuscaloosa County, AL, Due: August 26, 1996, Contact: Joe D. Wilkerson 
    (334) 223-7370.
        EIS No. 960301, Final EIS, FHW, NH, NH 9/US 202 Highway 
    Improvements Project, between Henniker to the east and NH 31 to the 
    west, Funding, COE Section 404 Permit and NPDES Permit, Hillsborough 
    County, NH, Due: August 05, 1996, Contact: William F. O'Donnell's (603) 
    225-1608.
        EIS No. 960302, Final EIS, FRC, WI, Wisconsin River Basin 
    Hydroelectric Project, Application for Licensing for ten FERC 
    Hydroelectric Project: Nos. 2119, 2239, 2476, 1999, 2212, 2590, 2256, 
    2255, 2291 and 2292, Vilas, Forest, Oneida, Lincoln, Marathon, Portage 
    and Wood Counties, WI and Gogebic County, MI, Due: August 05, 1996, 
    Contact: Sabina Joe (202) 219-1648.
        EIS No. 960303, Final EIS, BLM, CO, White River Resource Area, Land 
    and Resource Management Plan, Implementation, Craig District, Towns of 
    Meeker, Rangely and Dinosaur, Rio Blanco, Garfield and Moffat Counties, 
    CO, Due: August 05, 1996, Contact: Bill Hill (970) 878-3601.
        EIS No. 960304, Draft EIS, BLM, NV, Twin Creeks Mine Consolidation 
    and Expansion, which Encompasses the former Rabbit Creek Mine and the 
    former Chimmey Creek Mine, Plan of Operation and Permit Application, 
    Winnemucca District, Humboldt County, NV, Due: September 03, 1996, 
    Contact: Gerald Moritz (703) 623-1500.
        EIS No. 960305, Draft EIS, AFS, WA, Huckleberry Land Exchange 
    Consolidate Ownership and Enhance Future Conservation and Management, 
    Federal
    
    [[Page 35211]]
    
    Land and Non Federal Land, Mt. Baker-Snoqualmie National Forest, 
    Skagit, Snohomish, King, Pierce, Kittitas and Lewis Counties, WA, Due: 
    August 19, 1996, Contact: Doug Schrenk (206) 888-1421.
        EIS No. 960306, Draft EIS, COE, CA, Kaweah River Basin 
    Investigation Feasibility Study, Flood Protection of Terminus Dam, 
    Increase Storage Space in Lake Kaweah for Irrigation of Water Supply, 
    Construction, Modification and Operation, San Joaquin Valley, Tulare 
    and King Counties, CA, Due: August 27, 1996, Contact: Jane Rinck (916) 
    557-6715.
        EIS No. 960307, Draft EIS, AFS, OR, Augusta Timber Sale, 
    Implementation, Willamette National Forest, Blue River Ranger District, 
    Willamette Meridian, Blue River, Lane County, OR, Due: August 19, 1996, 
    Contact: Lynn Burditt (503) 822-3317.
        EIS No. 960308, Draft EIS, DOE, CT, SIC Prototype Reactor Plant 
    Disposal, Windsor Site Located at the Knolls Atom Power Laboratory, CT, 
    Due: August 19, 1996, Contact: Christopher G. Overton (860) 687-5610.
        EIS No. 960309, Final EIS, EOE, WA, Northwest Regional Power 
    Facility (NRPF), Construction and Operation if a 838 Megawatt (MW) Gas-
    fired Combustion Turbine Facility. Approval of Permits, Located near 
    the Town of Creston, WA, Due: August 05, 1996, Contact: Nancy Wittpen 
    (503) 230-3297.
        EIS No. 960310, Final EIS, FHW, MO, US Route 71/Range Line Road 
    Bypass east of the Joplin City Limits Construction, Funding and COE 
    Section 404 Permit, Jasper County, MO, Due: August 05, 1996, Contact: 
    Donald Neumann (573) 636-7104.
        EIS No. 960311, Final EIS, FRC, WA, Rocky Reach Hydroelectric 
    Project (FERC) No. 2145) Operating License Amendment Issuance to 
    Increase Lake Entiat Reservoir, Chelan and Douglas Counties, WA, Due: 
    August 05, 1996, Contact: James Hastreiter (503) 326-5858.
    
        Dated: July 1, 1996.
    William D. Dickerson,
    Director, NEPA Compliance Division Office of Federal Activities.
    [FR Doc. 96-17162 Filed 7-3-96; 8:45 am]
    BILLING CODE 6550-50-M
    
    
    

Document Information

Published:
07/05/1996
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
96-17162
Pages:
35210-35211 (2 pages)
Docket Numbers:
ER-FRL-5471-1
PDF File:
96-17162.pdf