2018-14346. Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests; Eagle Creek Sartell Hydro, LLC  

  • Start Preamble

    Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:

    a. Type of Application: Request for temporary variance of Article 34.

    b. Project No.: 8315-013.

    c. Date Filed: June 19, 2018.

    d. Applicant: Eagle Creek Sartell Hydro, LLC.

    e. Name of Project: Sartell Dam Hydro Project.

    f. Location: Mississippi River in Stearns and Benton counties, Minnesota.

    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.

    h. Applicant Contact: Ms. Melissa Rondou, Eagle Creek Sartell Hydro, LLC, 116 N. State Street, P.O. Box 167, Neshkoro, WI 54960, (920) 293-4628 ext. 347, melissa.rondou@eaglecreekre.com.

    i. FERC Contact: Mr. Jeremy Jessup, (202) 502-6779, Jeremy.Jessup@ferc.gov.

    j. Deadline for filing comments, motions to intervene, and protests, is 15 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission's eFiling system at http://www.ferc.gov/​docs-filing/​efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/​doc-sfiling/​ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket numbers P-8315-013.

    k. Description of Request: The applicant requests a temporary variance from the run-of-river and reservoir elevation requirements of Article 34 of the license. The variance will allow the licensee to drawdown the reservoir approximately three feet over a six-week period, from August 1 through September 15, 2018. The drawdown is to assist the Minnesota Department of Natural Resources, the Little Rock Lake Association, and the Benton Soil and Water Conservation District to facilitate water quality, fish habitat, and restoration improvements in the reach of the Mississippi River upstream of the project, and at Little Rock Lake, located approximately six miles upstream of the project.

    l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission's Public Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 20426, or by calling (202) 502-8371. This filing may also be viewed on the Commission's website at http://www.ferc.gov/​docs-filing/​elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at http://www.ferc.gov/​docs-filing/​esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1-866-208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is also available for inspection and reproduction at the address in item (h) above.

    m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.

    n. Comments, Motions To Intervene, or Protests: Anyone may submit comments, a motion to intervene, or a protest in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, motions to intervene, or protests must be received on or before the specified comment date for the particular application.

    o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title COMMENTS, MOTION TO INTERVENE, or PROTEST as applicable; (2) set forth in the heading the name of the applicant and the project number(s) of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person intervening or protesting; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the application. Agencies may obtain copies of the application directly from the applicant. A copy of any motion to intervene or protest must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource Start Printed Page 31388agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.

    Start Signature

    Dated: June 27, 2018.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2018-14346 Filed 7-3-18; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
07/05/2018
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2018-14346
Pages:
31387-31388 (2 pages)
Docket Numbers:
Project No. 8315-013
PDF File:
2018-14346.pdf