-
Start Preamble
AGENCY:
Federal Railroad Administration, DOT.
ACTION:
Notice.
SUMMARY:
In accordance with the Paperwork Reduction Act of 1995 and its implementing regulations, the Federal Railroad Administration (FRA) hereby announces that it is seeking renewal of the following currently approved information collection activities. Before submitting these information collection requirements (ICRs) for clearance by the Office of Management and Budget (OMB), FRA is soliciting public comment on specific aspects of the activities identified below.
DATES:
Comments must be received no later than September 6, 2005.
ADDRESSES:
Submit written comments on any or all of the following proposed activities by mail to either: Mr. Robert Brogan, Office of Safety, Planning and Evaluation Division, RRS-21, Federal Railroad Administration, 1120 Vermont Ave., NW., Mail Stop 17, Washington, DC 20590, or Mr. Victor Angelo, Office of Support Systems, RAD-20, Federal Railroad Administration, 1120 Vermont Ave., NW., Mail Stop 35, Washington, DC 20590. Commenters requesting FRA to acknowledge receipt of their respective comments must include a self-addressed stamped postcard stating, “Comments on OMB control number 2130-0544.” Alternatively, comments may be transmitted via facsimile to (202) 493-6230 or (202) 493-6170, or e-mail to Mr. Brogan at robert.brogan@fra.dot.gov, or to Mr. Angelo at victor.angelo@fra.dot.gov. Please refer to the assigned OMB control number in any correspondence submitted. FRA will summarize comments received in response to this notice in a subsequent notice and include them in its information collection submission to OMB for approval.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Mr. Robert Brogan, Office of Planning and Evaluation Division, RRS-21, Federal Railroad Administration, 1120 Vermont Ave., NW., Mail Stop 17, Washington, DC 20590 (telephone: (202) 493-6292) or Victor Angelo, Office of Support Systems, RAD-20, Federal Railroad Administration, 1120 Vermont Ave., NW., Mail Stop 35, Washington, DC 20590 (telephone: (202) 493-6470). (These telephone numbers are not toll-free.)
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
The Paperwork Reduction Act of 1995 (PRA), Public Law No. 104-13, section 2, 109 Stat. 163 (1995) (codified as revised at 44 U.S.C. 3501-3520), and its implementing regulations, 5 CFR Part 1320, require Federal agencies to provide 60-days notice to the public for comment on information collection activities before seeking approval for reinstatement or renewal by OMB. 44 U.S.C. 3506(c)(2)(A); 5 CFR 1320.8(d)(1), 1320.10(e)(1), 1320.12(a). Specifically, FRA invites interested respondents to comment on the following summary of proposed information collection activities regarding (i) Whether the information collection activities are necessary for FRA to properly execute its functions, including whether the activities will have practical utility; (ii) the accuracy of FRA's estimates of the burden of the information collection activities, including the validity of the methodology and assumptions used to determine the estimates; (iii) ways for FRA to enhance the quality, utility, and clarity of the information being Start Printed Page 39003collected; and (iv) ways for FRA to minimize the burden of information collection activities on the public by automated, electronic, mechanical, or other technological collection techniques or other forms of information technology (e.g., permitting electronic submission of responses). See 44 U.S.C. 3506(c)(2)(A)(I)-(iv); 5 CFR 1320.8(d)(1)(I)-(iv). FRA believes that soliciting public comment will promote its efforts to reduce the administrative and paperwork burdens associated with the collection of information mandated by Federal regulations. In summary, FRA reasons that comments received will advance three objectives: (i) Reduce reporting burdens; (ii) ensure that it organizes information collection requirements in a “user friendly” format to improve the use of such information; and (iii) accurately assess the resources expended to retrieve and produce information requested. See 44 U.S.C. 3501.
Below is a brief summary of the currently approved ICRs that FRA will submit for clearance by OMB as required under the PRA:
Title: Passenger Equipment Safety Standards.
OMB Control Number: 2130-0544.
Abstract: The information gained from daily inspections is used to detect and correct equipment problems so as to prevent collisions, derailments, and other occurrences involving railroad passenger equipment that cause injury or death to railroad employees, railroad passengers, or to the general public; and to mitigate the consequences of any such occurrences, to the extent that they can not be prevented. The information provided promotes passenger train safety by ensuring requirements are met for railroad equipment design and performance; fire safety; emergency systems; the inspection, testing, and maintenance of passenger equipment; and other provisions for the safe operation of railroad passenger equipment.
Affected Public: Businesses.
Respondent Universe: 22 railroads.
Frequency of Submission: On occasion; annually.
Reporting Burden
CFR section Respondent universe Total annual responses Average time per response Total annual burden hours Total annual burden cost 216.14—Special Notice For Repairs: Passenger Equip. 22 railroads 9 forms 5 minutes 1 hour $34 238.7—Waivers 22 railroads 9 waivers 2 hours/25 hours 64 hours 2,176 238.15—Movement of Passenger Equip. w/power brake defects: Limitations on movement found during Class I/IA Brake Test 22 railroads 1,000 tags/cards 3 minutes 50 hours 2,250 —Limitations on movement of passenger equip. in passenger service that becomes defective en route after Class I/IA brake test 22 railroads 288 tags/cards 3 minutes 14 hours 630 —Conditional Requirement: Notifications 22 railroads 144 Notifications 3 minutes 7 hours 315 238.17—Movement of Passenger Equip. w/Other than Power Brake Defects: Defects Developed En Route 22 railroads 200 tags/cards 3 minutes 10 hours 300 —Special Requisites For Movement of Equipment w/Safety Appliance Defects 22 railroads 76 tags/cards 3 minutes 4 hours 120 —Notifications 22 railroads 38 notifications 30 seconds 19 minutes 10 238.19—Reporting and Tracking Defective Passenger Equipment: Updated List 1 railroad 1 update 1 hour 1 hour 34 238.21—Special Approval Procedure: Petitions For Alternative Std 22 railroads 1 petition 16 hours 16 hours 544 —Petitions For Alternative Compl. 22 railroads 1 petition 120 hours 120 hours 4,080 238.21—Petitions For Special Approval of Pre-Revenue Service Acceptance Plan 22 railroads 2 petitions 40 hours 80 hours 2,720 —Comments Unknown 8 comments 1 hour 80 hours 440 238.103—Fire Safety: Equipment Design (New Equip.) 9 equipment manufacturers 7.2 equip. designs 540 hours 3,888 hours 198,720 —Subsequent Modifications 9 equipment manufacturers 7.2 equip. designs 60 hours 432 hours 43,200 —Existing Equipment: Fire Safety Analysis 9 equipment manufacturers 18 analyses 30 hours 540 hours 54,000 —Equipment Transfers: New Analysis 9 equipment manufacturers 1 analysis 20 hours 20 hours 2,000 238.107—Inspection, Testing, and Maintenance Plan: Annual Reviews 22 railroads 22 reviews 60 hours 1,320 hours 44,880 238.109—Training, Qualification, and Designation Prog.—Training Employees Who Perform Mechanical Insp 7,500 employees; 100 trainers 2,500 employees trained/100 instructors 1.33 hours 3,458 hours 103,075 —Recordkeeping 22 railroads 2,500 records 3 minutes 125 hours 4,250 238.111—Pre-Revenue Service Acceptance Testing Plan: Equipment Previously Used in Revenue Service 9 equipment manufacturers 7.2 plans 16 hours 115 hours 7,705 —Equipment Not Previously Used in Revenue Service 9 equipment manufacturers 7.2 plans 192 hours 1,382 hours 138,200 Start Printed Page 39004 —Subsequent Orders 9 equipment manufacturers 7.2 plans 60 hours 432 hours 33,762 238.203—Static End Strength: Grandfathering of Non-Complaint Equipment 22 railroads 1 petition 100 hours 100 hours 5,500 —Comments Unknown 3 comments 20 hours 60 hours 3,300 238.237—Automated Monitoring 22 railroads 22 documents 2 hours 44 hours 1,496 —Display Regarding Defective Alerter/Deadman Control 22 railroads 100 tags 3 minutes 5 hours 225 238.303—Exterior Calendar Day Inspection of Equip. 22 railroads 25 notices 1 minute .50 hour 23 —Defective Dynamic Brakes on MU Locomotive 22 railroads 50 tags/cards 3 minutes 3 hours 135 —Defective Dynamic Brakes on Conventional Locos 22 railroads 50 tags/cards 3 minutes 3 hours 135 —Records 22 railroads 2,017,756 records 1 minute 33,629 hours 1,143,386 238.305—Interior Calendar Day Mechanical Insp.: Tagging Req 22 railroads 540 tags 1 minute 9 hours 324 —Records 22 railroads 1,866,904 records 1 minute 31,115 hours 1,057,910 238.307—Periodic Mechanical Inspection of Pass. Cars: Notification of Alternative Intervals 22 railroads 5 notifications 5 hours 25 hours 850 —Non-Complying Conditions 22 railroads 200 notices 2 minutes 7 hours 238 —Records 22 railroads 56,462 records 2 minutes 1,882 hours 63,988 —Reliability Assessments Concerning Alt. Inspection Interval 22 railroads 5 documents 100 hours 500 hours 17,000 238.311—Single Car Test: Movement to Nest Forward Location 22 railroads 25 tags 3 minutes 1 hour 36 238.315—Class IA Brake Test 22 railroads 365,000 communications 3 seconds 304 hours 0 —Communication Signal Tests 22 railroads 365,000 tests 15 seconds 1,521 hours 51,714 238.317—Class II Brake Test: Communication Signal System Test 22 railroads 365,000 tests 15 seconds 1,521 hours 51,714 238.431—Brake Test: Analysis 1 railroad 1 analysis 40 hours 40 hours 1,360 238.437—Emergency Comm. 3 car manufacturers 3 sets of instruction + 25 decals 25 hours/10 min. 79 hours 2,670 238.441—Emergency Roof Location 3 car manufacturers 3 sets of instruction + 25 placards 25 hours/60 min. 100 hours 3,300 238.445—Automated Monitoring 1 railroad 10,000 alerts/alarms 10 seconds 28 hours 0 —Self-Tests: Notific. 1 railroad 21,900 notifications 20 seconds 122 hours 0 Total Responses: 5,076,058.
Estimated Total Annual Burden: 83,257 hours.
Status: Regular Review.
Pursuant to 44 U.S.C. 3507(a) and 5 CFR 1320.5(b), 1320.8(b)(3)(vi), FRA informs all interested parties that it may not conduct or sponsor, and a respondent is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Start SignatureIssued in Washington, DC on June 29, 2005.
D.J. Stadtler,
Director, Office of Budget, Federal Railroad Administration.
[FR Doc. 05-13186 Filed 7-5-05; 8:45 am]
BILLING CODE 4910-06-P
Document Information
- Published:
- 07/06/2005
- Department:
- Federal Railroad Administration
- Entry Type:
- Notice
- Action:
- Notice.
- Document Number:
- 05-13186
- Dates:
- Comments must be received no later than September 6, 2005.
- Pages:
- 39002-39004 (3 pages)
- PDF File:
- 05-13186.pdf