99-17192. Northeast Nuclear Energy Company, et al., Millstone Nuclear Power Station, Unit 1; Notice of Receipt and Availability for Comment of Post-Shutdown Decommissioning Activities Report  

  • [Federal Register Volume 64, Number 129 (Wednesday, July 7, 1999)]
    [Notices]
    [Page 36722]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-17192]
    
    
    -----------------------------------------------------------------------
    
    NUCLEAR REGULATORY COMMISSION
    
    [Docket No. 50-245]
    
    
    Northeast Nuclear Energy Company, et al., Millstone Nuclear Power 
    Station, Unit 1; Notice of Receipt and Availability for Comment of 
    Post-Shutdown Decommissioning Activities Report
    
        The U.S. Nuclear Regulatory Commission (the Commission) is in 
    receipt of and is making available for public comment, the Post-
    Shutdown Decommissioning Activities Report (PSDAR) for the Millstone 
    Nuclear Power Station, Unit 1 (Millstone Unit 1), located in Waterford, 
    Connecticut.
        Millstone Unit 1 has been shut down since November 4, 1995, and the 
    reactor has been defueled since November 19, 1995. By letter dated July 
    21, 1998, Northeast Nuclear Energy Company (the licensee) certified to 
    the Commission that power operations at Millstone Unit 1 had been 
    permanently ceased and fuel had been permanently removed from the 
    reactor vessel. By letter dated June 14, 1999, the licensee submitted 
    its PSDAR to the Commission in accordance with the requirements of 
    Title 10 of the Code of Federal Regulations, Section 50.82.
        In the PSDAR, the licensee has identified the planned 
    decommissioning activities and schedule for the Millstone Unit 1 
    facility, provided an estimate of expected costs, and discussed the 
    reasons for concluding that the environmental impacts associated with 
    site-specific decommissioning activities are bounded by the appropriate 
    previously issued environmental impact statements. The licensee has 
    chosen to decontaminate and dismantle selected portions of the facility 
    and leave other portions in a safe storage status until decommissioning 
    programs are developed for Unit 2 and Unit 3. The licensee stated, 
    however, that it is conceivable that upon further evaluation, it may be 
    preferable to decontaminate and dismantle Unit 1 without placing 
    portions of the facility in safe storage. The licensee is also 
    evaluating the feasibility of constructing an independent spent fuel 
    storage facility on site until the fuel can be permanently transferred 
    offsite to a Department of Energy facility.
        The PSDAR is available for public inspection at the Commission's 
    public document room located at The Gelman Building, 2120 L Street, 
    NW., Washington, DC, and at the local public document room located at 
    the Learning Resources Center, Three Rivers Community-Technical 
    College, 574 New London Turnpike, Norwich, Connecticut, and at the 
    Waterford Library, ATTN: Vince Juliano, 49 Rope Ferry Road, Waterford, 
    Connecticut. The NRC has also placed the PSDAR on the Internet at 
    [http://www.nrc.gov/OPA/reports/ms1061499.htm] (cover letter) and 
    [http://www.nrc.gov/OPA/reports/1061499a.htm] (attached report).
        The Commission will schedule a public meeting in the vicinity of 
    the Millstone Unit 1 facility to solicit public comments on the 
    Millstone Unit 1 PSDAR. A notice will be placed in the Federal Register 
    and in the local media announcing the date, time, and location of the 
    public meeting.
        Comments regarding the Millstone Unit 1 PSDAR should be submitted 
    in writing to Mr. Louis L. Wheeler, Senior Project Manager, Mail Stop 
    O11 D-19, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
    0001, within 30 days after the date of this notice.
    
        Dated at Rockville, Maryland, this 29th of June 1999.
    For the Nuclear Regulatory Commission.
    Louis L. Wheeler,
    Senior Project Manager, Decommissioning Section, Project Directorate IV 
    & Decommissioning Division of Licensing Project Manager, Office of 
    Nuclear Reactor Regulation.
    [FR Doc. 99-17192 Filed 7-6-99; 8:45 am]
    BILLING CODE 7590-01-P
    
    
    

Document Information

Published:
07/07/1999
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Document Number:
99-17192
Pages:
36722-36722 (1 pages)
Docket Numbers:
Docket No. 50-245
PDF File: