00-17205. Northeast Nuclear Energy Company, Millstone Nuclear Power Station, Unit 1; Environmental Assessment and Finding of No Significant Impact  

  • Start Preamble

    The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an exemption from certain requirements of 10 CFR 140.11 regarding financial protection requirements for Facility Operating License No. DPR-21, issued to Northeast Nuclear Energy Company (the licensee), for the Millstone Nuclear Power Station, Unit 1, a permanently shutdown nuclear reactor facility located in Waterford, Connecticut.

    Environmental Assessment

    Identification of Proposed Action

    The proposed action would allow an exemption from the requirements of 10 CFR 140.11(a)(4) regarding secondary financial protection, due to the permanently shutdown and defueled status of the Millstone Nuclear Power Station, Unit 1.

    The proposed action is in accordance with the licensee's application for exemption dated September 28, 1999, as supplemented by letter dated March 2, 2000.

    The Need for the Proposed Action

    The proposed action is needed because the licensee's required insurance coverage significantly exceeds the potential cost consequences of radiological incidents possible at a permanently shutdown and defueled nuclear power plant with spent fuel that will have cooled since the plant ceased operations on November 4, 1995.

    Environmental Impacts of the Proposed Action

    The NRC has completed its evaluation of the proposed action and concludes that exemption from 10 CFR 140.11(a)(4) is an administrative action and will not have any environmental impact. Millstone Nuclear Power Station, Unit 1 permanently ceased operations on November 4, 1995, and completed the transfer of all reactor fuel to the spent fuel pool shortly afterwards. The licensee maintains and operates the unit in a configuration necessary to support the safe storage of spent fuel and to comply with the facility operating license and NRC's rules and regulations.

    The proposed action will not significantly increase the probability or consequences of accidents, no changes are being made in the types of any effluents that may be released off site, and there is no significant increase in occupational or public radiation exposure. Therefore, there are no significant radiological environmental impacts associated with the proposed action.

    With regard to potential non-radiological impacts, the proposed action does not involve any historic sites. It does not affect non-radiological plant effluents and has no other environmental impact. Therefore, there are no significant non-radiological environmental impacts associated with the proposed action.

    Accordingly, the NRC concludes that there are no significant environmental impacts associated with the proposed action.

    Alternatives to the Proposed Action

    As an alternative to the proposed action, the staff considered denial of the proposed action (i.e., the “no-action” alternative). Denial of the application would result in no change in current environmental impacts. The environmental impacts of the proposed action and the alternative action are similar.

    Alternative Use of Resources

    This action does not involve the use of any resources not previously considered in the Final Environmental Statement for the Millstone Nuclear Power Station, Unit 1.

    Agencies and Persons Contacted

    In accordance with its stated policy, on June 2, 2000, the staff consulted with the State of Connecticut official, Mr. Michael Firsick of the Department of Environmental Protection, regarding the environmental impact of the proposed action. The State official had no comments.

    Finding of No Significant Impact

    On the basis of the environmental assessment, the NRC concludes that the proposed action will not have a significant effect on the quality of the human environment. Accordingly, the NRC has determined not to prepare an environmental impact statement for the proposed action.

    For further details with respect to the proposed action, see the licensee's letter dated September 28, 1999, as supplemented by letter dated March 2, 2000, which are available for public inspection at the Commission's Public Document Room, The Gelman Building, 2120 L Street, NW., Washington, DC. Publicly available records will be accessible electronically from the ADAMS Public Library component on the NRC Web site, http:\\www.nrc.gov (the Electronic Reading Room).

    Start Signature

    Dated at Rockville, Maryland, this 29th day of June 2000.

    For the Nuclear Regulatory Commission.

    David J. Wrona,

    Project Manager, Decommissioning Section, Project Directorate IV & Decommissioning, Division of Licensing Project Management, Office of Nuclear Reactor Regulation.

    End Signature End Preamble

    [FR Doc. 00-17205 Filed 7-6-00; 8:45 am]

    BILLING CODE 7590-01-P

Document Information

Published:
07/07/2000
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Document Number:
00-17205
Pages:
42038-42038 (1 pages)
Docket Numbers:
Docket No. 50-245
PDF File:
00-17205.pdf