94-16524. Northwest Pipeline Corp.; Request Under Blanket Authorization  

  • [Federal Register Volume 59, Number 130 (Friday, July 8, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-16524]
    
    
    [[Page Unknown]]
    
    [Federal Register: July 8, 1994]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP94-618-000]
    
     
    
    Northwest Pipeline Corp.; Request Under Blanket Authorization
    
    July 1, 1994.
        Take notice that on June 20, 1994, Northwest Pipeline Corporation 
    (Northwest), 295 Chipeta Way, Salt Lake City, Utah 84158, filed in 
    Docket No. CP94-618-000 a request pursuant to Sections 157.205, 157.216 
    and 157.211 of the Commission's Regulations under the Natural Gas Act 
    (18 CFR 157.205, 157.216, and 157.211) for authorization to abandon 
    certain obsolete facilities at the Connell Meter Station in Whitman 
    County, Washington, and to construct and operate replacement facilities 
    at this station to maintain the ability to accommodate its existing 
    firm maximum daily delivery obligations to The Washington Water Power 
    Company (Water Power) under Northwest's blanket certificate issued in 
    Docket No. CP82-433-000 pursuant to Section 7 of the Natural Gas Act, 
    all as more fully set forth in the request that is on file with the 
    Commission and open to public inspection.
        Northwest proposes to replace the existing obsolete 4-inch positive 
    displacement meter with a new 4-inch turbine meter at the Connell Meter 
    Station. Northwest also proposes to abandon the operation of the 
    existing 4-inch orifice meter at this station by removing the recorder 
    and utilizing this second meter run only as a by-pass for the meter 
    station. Northwest states the proposed modification will result in a 
    decrease in the maximum design delivery capacity of the meter station 
    from 4,700 Dth per day to approximately 3,433 Dth per day at a pressure 
    of 150 psig, a capacity still adequate to accommodate existing delivery 
    obligations to Water Power. Northwest further states that the total net 
    of replacing the described facilities at the Connell Meter Station is 
    estimated to be approximately $104,750.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 94-16524 Filed 7-7-94; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
07/08/1994
Department:
Energy Department
Entry Type:
Uncategorized Document
Document Number:
94-16524
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: July 8, 1994, Docket No. CP94-618-000