96-17300. CNG Transmission Company; Petition for Waiver  

  • [Federal Register Volume 61, Number 131 (Monday, July 8, 1996)]
    [Notices]
    [Pages 35860-35861]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-17300]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF TRANSPORTATION
    Research and Special Programs Administration
    [Docket No. P-96-8W; Notice 1]
    
    
    CNG Transmission Company; Petition for Waiver
    
    AGENCY: Research and Special Programs Administration, DOT.
    
    ACTION: Notice of petition for waiver.
    
    -----------------------------------------------------------------------
    
    SUMMARY: CNG Transmission Company (CNGT) has petitioned the Research 
    and Special Programs Administration (RSPA) for a waiver from compliance 
    with provisions of 49 CFR 192.611(a) requiring confirmation of the 
    maximum allowable operating pressure (MAOP) by hydrostatic testing. 
    Instead, CNGT requests they be permitted to requalify the MAOP by an 
    alternative approach involving a combination of hydrostatic testing and 
    inspection by an instrumented internal inspection device commonly known 
    as a ``smart pig''. The need to confirm the MAOP results from a recent 
    increase in the population density along certain segments of a 26-inch 
    diameter gas transmission line in Ohio.
    
    DATES: Written comments submitted in duplicate must be received on or 
    before August 7, 1996. Interested persons should submit as part of 
    their written comments all the material that is considered relevant to 
    any statement of fact or argument made.
    
    ADDRESSES: Comments may be mailed or hand delivered to the Dockets Unit 
    [DHM-20], Room 8421, Research and Special Programs Administration, U.S. 
    Department of Transportation, 400 Seventh St., SW., Washington, DC 
    20590-0001. Comments should specify the Docket No. stated in the 
    heading of this document; the original and two copies should be 
    submitted. Dockets may be reviewed and copied between the hours of 8:30 
    a.m. and 4:30 p.m., Monday through Friday, except Federal holidays.
    
    FOR FURTHER INFORMATION CONTACT: Albert C. Garnett, (202) 366-2036, 
    Office of Pipeline Safety, regarding the subject matter of this notice 
    or the Dockets Unit, (202) 366-5046, for copies of this notice or other 
    materials in the docket.
    
    SUPPLEMENTARY INFORMATION:
    
    Background
    
        By correspondence dated April 23, 1996, CNGT requested a waiver 
    from compliance with the MAOP confirmation or revision provisions of 49 
    CFR 192.611(a) for pipeline segments where the hoop stress 
    corresponding to the established MAOP is not commensurate with the 
    present class location. The requested waiver applies to ten segments 
    (totaling 10.91 miles) and located on CNGT's transmission line TL-400.
        Transmission line TL-400 begins at the Lebanon Compressor Station 
    in Warren County, Ohio, and transports gas eastward to the Gilmore 
    Compressor station in Tuscarawas County, Ohio, a distance of 163.19 
    miles. The 26-inch diameter transmission line was designed and tested 
    to operate at an MAOP of 850 psig.
        The ten line segments that are the subject of this waiver request 
    operate at a hoop stress of greater than 40% of the specified minimum 
    yield strength (SMYS) and are located in areas where a recent increase 
    in population indicated a change in their class location. Accordingly, 
    CNGT complied with the provisions of Sec. 192.609 and completed a study 
    of the subject segments to determine: (a) their present class location; 
    (b) a comparison of their original design, construction, and testing 
    procedures with the provisions required for their present class 
    location; (c) their physical condition ascertained from available 
    records; (d) their operating and maintenance history; (e) their maximum 
    actual operating pressure and corresponding operating hoop stress; and 
    (f) the extent of the area affected by the population increase and 
    other factors which may limit further expansion of the more densely 
    populated area.
        CNGT determined from the study required by Sec. 192.609 (a) and (f) 
    that the recent expansion of the population density had changed the 
    subject segments from Class 1 locations to Class 2 locations. CNGT also 
    determined from the study required by Sec. 192.609 (b)-(e) that the ten 
    segments were in good physical condition. Consequently, in accordance 
    with the provisions of Sec. 192.611 (a) and (c), CNGT must confirm or 
    revise the originally established MAOP (850 psig) within the 18-month 
    period ending October 19, 1996.
        The hydrostatic test which established the MAOP at 850 psig was 
    performed at a pressure of 953 psig, although a test pressure of 935 
    psig would have been sufficient under the provisions of 
    Sec. 192.619(a)(2)(ii). After October 19, 1996, these segments may not 
    be operated at an MAOP above 762 psig (a reduction of 88 psig) due to 
    their reclassification as Class 2 locations. However, CNGT seeks to 
    maintain the MAOP at 850 psig in order to meet their gas delivery 
    commitments. Consequently, requalification by hydrostatic testing to a 
    minimum pressure of 1,063 psig would be in accordance with 
    Sec. 192.611(a)(3).
        TL-400 is a single long transmission line that transports gas from 
    third parties to local distribution companies and to underground 
    storage facilities. CNGT states that it would be unreasonable to reduce 
    the MAOP and thereby lose gas throughput that would prevent them from 
    meeting their contractual obligations. CNGT also asserts that 
    hydrostatically testing all ten segments would require the line to be 
    taken out of service for a minimum of 16 days. Additionally, CNGT 
    asserts that the acquisition and disposal of the water used in the 
    hydrostatic testing would be burdensome.
    
    Alternative Approach
    
        Instead of hydrostatically testing all ten segments, CNGT requested 
    a waiver permitting an alternative approach which they believe would 
    achieve both an equivalent level of safety in the subject segments and 
    a complete evaluation of the 163.19 mile transmission line. 
    Additionally, CNGT expects the proposed approach to be considerably 
    less costly and to reduce the number of days that the transmission line 
    would be out of service.
        CNGT's proposal consists of two alternatives supplemented by a work 
    plan (dated May 14, 1996). Although, not set out as such in the 
    petition, the alternatives are identified for the purposes of this 
    document as Alternative A and Alternative B:
        Alternative A consists of the following:
        (A1) Conducting a close interval pipe-to-soil corrosion survey 
    (CIS) of the 163.19 mile line;
        (A2) Hydrostatic testing four segments (totaling 4.96 miles). If no 
    leak occurs, or only a specified minor leak 1 occurs and is 
    remediated, the hydrostatic testing is completed;
    ---------------------------------------------------------------------------
    
         1 Sspecified minor leak--A leak from valve packings, 
    gaskets, threaded fittings, or hydrostatic test equipment; and from 
    localized corrosion pitting on the 26-in line pipe.
    ---------------------------------------------------------------------------
    
        (A3) Inspecting the 163.19 mile line with a geometry pig followed 
    by a high resolution ``smart pig.'' Any defects impacting the MAOP are 
    promptly
    
    [[Page 35861]]
    
    remediated. All defects detected by the ``smart pig'' are cross-
    referenced with the CIS to correct any deficiencies in the cathodic 
    protection system, all before October 19, 1996; and
        (A4) Inspecting the 163.19 mile line with a geometry pig followed 
    by a high resolution ``smart pig'' and remediation of any defects 
    impacting the MAOP, all in the year 2001.
        Alternative B would be performed only if, during the implementation 
    of (A2), a leak other than a specified minor leak 2 occurs. 
    Alternative B consists of the following:
    ---------------------------------------------------------------------------
    
         2 Other than a specified minor leak--A leak from a crack, 
    crack-like defects, general corrosion, or from any other source 
    (except localized corrosion pitting) on the 26-inch line pipe.
    ---------------------------------------------------------------------------
    
        (B1) If a leak, other than a specified minor leak occurs during 
    (A2) and is remediated, the hydrostatic testing of the four segments is 
    completed;
        (B2) Inspecting the 163.19 mile line with a geometry pig followed 
    by a high resolution ``smart pig.'' Any defects impacting the MAOP are 
    promptly remediated. All before October 19, 1996; and
        (B3) The period to qualify the MAOP is extended until (B3) is 
    completed. All defects detected by the ``smart pig'' are cross-
    referenced with the CIS to correct any deficiencies in the cathodic 
    protection system. Hydrostatic testing and remediation of any leaks 
    occurring in the remaining six segments (totaling 5.95 miles), all 
    before June 30, 1997.
    
    Basis for the Alternative Approach
    
        CNGT's proposed alternative approach is based on the contention 
    that this transmission line is in good physical condition. In the 
    petition, they supported that assertion by providing information on the 
    line's construction, operation, and maintenance history.
        CNGT states that the 26-in diameter line is constructed of 
    submerged-arc welded steel pipe that has been joined by welding. The 
    pipe is internally coated with mill-applied liquid epoxy and externally 
    coated with mill-applied coal tar enamel. The line was hydrostatically 
    tested and commissioned in December 1968. Cathodic protection is 
    provided by impressed current remote groundbeds and assisted with 
    magnesium anode beds. CNGT states that the 21 test stations used to 
    monitor the level of cathodic protection in the subject segments do not 
    show any areas of low potential. CNGT states that, aside from one 
    failure in 1981 due to third party damage, no other leaks have occurred 
    since the line has been in service. Moreover, during the period 1990 
    through 1996, the MAOP of six other such segments in this line were 
    requalified by hydrostatic testing under Sec. 192.611(a) without a leak 
    or failure.
        The proposed alternative approach expresses the petitioner's 
    confidence that the line is in good physical condition. Any leak other 
    than a specified minor leak occurring during the hydrostatic testing of 
    (A2) would trigger the requirement to implement the more costly and 
    time consuming Alternative B. Under (B1) and (B3), CNGT would need to 
    hydrostatically test all ten segments required by Sec. 192.611(a). 
    Moreover, under (B2), they would need to inspect the 163.19 mile line 
    with a geometry pig and with a high resolution ``smart pig.''
    
    RSPA Response
    
        Our review of the petition for waiver showed the following:
        (1) CNGT's contention that this particular line is in good physical 
    condition is well supported with information on the pipe, internal and 
    external coatings, cathodic protection, and the transmission line's 
    outstanding leak record;
        (2) The provisions of Sec. 192.611(a) for requalification would be 
    only partially waived during (A2), because four of the ten segments 
    (representing 4.96 miles or a 45.46% sampling of the total 10.91 miles) 
    would be hydrostatically tested;
        (3) If a leak, other than a specified minor leak occurs during the 
    hydrostatic testing of (A2), then under (B3) the remaining six segments 
    would be hydrostatically tested. This would result in compliance with 
    Sec. 192.611(a). Additionally, during (B2) there would be an internal 
    inspection of the complete 163.19 mile transmission line;
        (4) Otherwise, during (A3) and (A4), the complete transmission line 
    would be internally inspected during 1996 and internally inspected 
    again during the year 2001;
        (5) The implementation of either (A3) or (B2) ( the in-line 
    inspection in 1996) would be the first time transmission line TL-400 
    has been inspected by a ``smart-pig;'' and
        (6) A ``smart pig'' is capable of detecting certain flaws in the 
    pipe wall that (when interpreted) may disclose defects that jeopardize 
    the safe operation of the gas transmission line . CNGT would run a 
    ``smart pig'' of the high resolution type, which is considered to be 
    state-of-the-art technology for the identification of pipe wall 
    defects.
        In view of the foregoing, it appears that neither Alternative A nor 
    its back up, Alternative B, would be inconsistent with pipeline safety. 
    Instead, we see the implementation of either alternative as 
    contributing to the safety of this 163.19 mile transmission line. 
    Consequently, RSPA proposes to grant the waiver.
        Interested persons are invited to comment on the proposed waiver by 
    submitting their views or arguments with supporting data, if available, 
    in the manner described under the heading ADDRESSES (above). All 
    comments received before the date shown under DATES (above) will be 
    considered before final action is taken. Late filed comments will be 
    considered as far as practicable. No public hearing is contemplated, 
    but one may be held at a time and place set in a notice in the Federal 
    Register if requested by an interested person desiring to comment at a 
    public hearing and raising a genuine issue.
    
        Authority: 49 U.S.C. 60118(c); and 49 CFR 1.53.
    
        Issued in Washington, DC, on July 2, 1996.
    Richard B. Felder,
    Associate Administrator for Pipeline Safety.
    [FR Doc. 96-17300 Filed 7-5-96; 8:45 am]
    BILLING CODE 4910-60-P
    
    
    

Document Information

Published:
07/08/1996
Department:
Research and Special Programs Administration
Entry Type:
Notice
Action:
Notice of petition for waiver.
Document Number:
96-17300
Dates:
Written comments submitted in duplicate must be received on or before August 7, 1996. Interested persons should submit as part of their written comments all the material that is considered relevant to any statement of fact or argument made.
Pages:
35860-35861 (2 pages)
Docket Numbers:
Docket No. P-96-8W, Notice 1
PDF File:
96-17300.pdf