July 1, 1998.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Major License.
b. Project No.: P-2004-073.
c. Date Filed: September 2, 1997.
d. Applicant: Holyoke Water Power Company.
e. Name of Project: Holyoke Hydroelectric Project.
f. Location: On the Connecticut River in Hampden, Hampshire, and
Franklin Counties, Massachusetts.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. Secs. 791(a)--
825(r).
h. Applicant Contact:
Ronald G. Chevalier, Vice President, Holyoke Water Power Company, P.O.
[[Page 36893]]
Box 270, Hartford, CT 06141-0270, (860) 665-5315.
James J. Kearns, Project Manager, Northeast Utilities Service Company,
P.O. Box 270, Hartford, CT 06141-0270, (860) 665-5936.
Catherine E. Shively, Counsel, Public Service Company of New Hampshire,
1000 Elm Street, Manchester, NH 03105, (603) 634-2326.
i. FERC Contact: Allan Creamer (202) 219-0365.
j. Comment Date: August 31, 1998.
k. Status of Environmental Analysis: This application has been
accepted, but is not ready for environmental analysis at this time--see
attached paragraph E1.
l. Description of Project: The proposed run-of-river project would
consist of the following features: (1) an approximately 1,000-foot-long
masonry dam to elevation of 97.47 feet National Geodetic Vertical
datum, topped with a 3.1-foot-high rubber dam; (2) upstream and
downstream fish passage facilities; (3) a 2,290-acre reservoir that
extends approximately 25 miles upstream; (4) a three-level canal system
adjacent to the river with headgates at the dam; (5) six separate
hydroelectric facilities, named Hadley Falls Station, Riverside
Station, Boatlock Station, Beebe-Holbrook Units, Skinner Unit and
Chemical Units, and except for the Hadley Falls Station which has its
intake structure adjacent to the canal headgate structure, the
facilities withdraw water from the canal system; (6) a total nameplate
capacity of 43,756 kilowatts; (7) transmission line connections; and
(8) appurtenant facilities. The estimated average annual generation is
about 223,389 megawatt-hours.
m. Purpose of Project: The power generated by the project is used
for station service on site and sold to industrial customers in
Holyoke, with the remainder transmitted to other utilities for resale
outside of Holyoke.
n. This notice also consists of the following standard paragraphs:
B1 and E1.
o. Available Locations of Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference and Files and Maintenance Branch, located at 888 First
Street, N.E., Room 2A-1, Washington, D.C. 20426, or by calling (202)
208-2326. A copy is also available for inspection and reproduction at
Holyoke Water Power Company, 1 Canal Street, Holyoke, Massachusetts
01040, (413) 536-9428.
B. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules and Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protest, or motions
to intervene must be received on or before the specified comment date
for the particular application.
E1. Filing and Service of Responsive Documents--The application is
not ready for environmental analysis at this time; therefore, the
Commission is not now requesting comments, recommendations, terms and
conditions, or prescriptions.
When the application is ready for environmental analysis, the
Commission will issue a public notice and requesting comments,
recommendations, terms and conditions, or prescriptions.
All filings must (1) bear in all capital letters the title
``PROTEST'' or ``MOTION TO INTERVENE'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of the 18 CFR 385.2001 through 385.2005.
Agencies may obtain copies of the application directly from the
applicant. Any of these documents must be filed by providing the
original and the number of copies required by the Commission's
regulations to: The Secretary, Federal Energy Regulatory, Commission,
888 First Street, N.E., Washington, D.C. 20426. An additional copy must
be sent to Director, Division of Project Review, Office of Hydropower
Licensing, Federal Energy Regulatory Commission, at the above address.
A copy of any protest or motion to intervene must be served upon each
representative of the applicant specified in the particular
application.
David P. Boergers,
Acting Secretary.
[FR Doc. 98-17993 Filed 7-7-98; 8:45 am]
BILLING CODE 6717-01-M