98-17998. Notice of Competing Application Accepted for Filing With the Commission  

  • [Federal Register Volume 63, Number 130 (Wednesday, July 8, 1998)]
    [Notices]
    [Pages 36893-36894]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-17998]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    
    
    Notice of Competing Application Accepted for Filing With the 
    Commission
    
    July 1, 1998.
        Take notice that the following hydroelectric application has been 
    filed with the Commission and is available for public inspection:
        a. Type of Application: Major License.
        b. Project No.: P-11607-000.
        c. Date Filed: August 29, 1997.
        d. Competing Applicant(s): Ashburnham Municipal Light Plant and 
    Massachusetts Municipal Wholesale Electric Company.
        e. Name of Project: Holyoke Hydroelectric Project.
        f. Location: On the Connecticut River in Hampden, Hampshire, and 
    Franklin Counties, Massachusetts.
        g. Filed Pursuant to: Federal Power Act, 16 U.S.C. Secs. 791(a)-
    825(r).
        h. Competing Applicant(s) Contact:
    
    Roger W. Bacon, Director, Power Services Division, Mass. Municipal 
    Wholesale Elec. Company, Randall Road, P.O. Box 426, Ludlow, MA 01056, 
    (413) 589-1041.
    Jack LcMieur, Acting General Manager, Ashburnham Municipal Light Plant, 
    78 Central Street, P.O. Box 823, Ashburnham, MA 01430, (508) 827-4423.
    
        i. FERC Contact: Allan Creamer (202) 219-0365.
        j. Comment Date: August 31, 1998.
        k. Status of Environmental Analysis: This application has been 
    accepted, but is not ready for environmental analysis at this time--see 
    attached paragraph E1.
        l. Description of Project: The proposed run-of-river project would 
    consist of the following features: (1) an approximately 1,000-foot-long 
    masonry dam to elevation 97.47 feet National Geodetic Vertical datum, 
    topped with a 3.1-foot-high rubber dam; (2) upstream and downstream 
    fish passage facilities; (3) the Fish Lift Park adjoining the dam; (4) 
    a 2,290-acre reservoir that extends approximately 25 miles upstream; 
    (5) a three-level canal system adjacent to the river with headgates at 
    the dam; (6) six separate hydroelectric facilities, named Hadley Falls 
    Station, Riverside Station, Boatlock Station, Beebe-Holbrook Units, 
    Skinner Unit and Chemical Units, and except for the Hadley Falls 
    Station which has its intake structure adjacent to the canal headgate 
    structure, the facilities withdraw water from the canal system; (7) a 
    total nameplate capacity of 58,756 kilowatts (kW), consisting of the
    
    [[Page 36894]]
    
    existing 43,756 kW project plus a 15,000 kW expansion at the Hadley 
    Falls Station; (8) transmission line connections; and (9) appurtenant 
    facilities. The estimated average annual generation is about 212,000 
    megawatt-hours (MWh), which would increase to about 257,600 MWh after 
    completing the expansion in 2006.
        m. Purpose of Project: The power generated by the project would be 
    used within Holyoke Gas & Electric Department's distribution system, 
    with a portion sold to the Massachusetts Municipal Wholesale Electric 
    Company.
        n. This notice also consists of the following standard paragraphs: 
    A4, B1, and E1.
        o. Available Locations of Application: A copy of the application is 
    available for inspection and reproduction at the Commission's Public 
    Reference and Files and Maintenance Branch, located at 888 First 
    Street, N.E., Room 2A-1, Washington, D.C. 20426, or by calling (202) 
    208-2326. Copies are also available for inspection and reproduction at 
    (1) the Ashburnham Municipal Light Plant, 78 Central Street, 
    Ashburnham, Massachusetts 01430, and (2) the Holyoke Gas & Electric 
    Department, 99 Suffolk Street, Holyoke, Massachusetts 01040.
        A4. Development Application--Public notice of the filing of the 
    initial development application, which has already been given, 
    established the due date for filing competing applications or notices 
    of intent. Under the Commission's regulations, any competing 
    development application must be filed in response to and in compliance 
    with public notice of the initial development application. No competing 
    applications or notices of intent may be filed in response to this 
    notice.
        B1. Protests or Motions to Intervene--Anyone may submit a protest 
    or a motion to intervene in accordance with requirements of Rules of 
    Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In 
    determining the appropriate action to take, the Commission will 
    consider all protests filed, but only those who file a motion to 
    intervene in accordance with the Commission's Rules may become a party 
    to the proceeding. Any protests or motions to intervene must be 
    received on or before the specified deadline date for the particular 
    application.
        E1. Filing and Service of Responsive Documents--The application is 
    not ready for environmental analysis at this time; therefore, the 
    Commission is not now requesting comments, recommendations, terms and 
    conditions, or prescriptions.
        When the application is ready for environmental analysis, the 
    Commission will issue a public notice requesting comments, 
    recommendations, terms and conditions, or prescriptions.
        All filings must (1) bear in all capital letters the title 
    ``PROTEST'' or ``MOTION TO INTERVENE''; (2) set forth in the heading 
    the name of the applicant and the project number of the application to 
    which the filing responds; (3) furnish the name, address, and telephone 
    number of the person protesting or intervening; and (4) otherwise 
    comply with the requirements of 18 CFR 385.2001 through 385.2005. 
    Agencies may obtain copies of the application directly from the 
    applicant. Any of these documents must be filed by providing the 
    original and the number of copies required by the Commission's 
    regulations to: The Secretary, Federal Energy Regulatory Commission, 
    888 First Street, N.E., Washington, D.C. 20426. An additional copy must 
    be sent to Director, Division of Project Review, Office of Hydropower 
    Licensing, Federal Energy Regulatory Commission, at the above address. 
    A copy of any protest or motion to intervene must be served upon each 
    representative of the applicant specified in the particular 
    application.
    David P. Boergers,
    Acting Secretary.
    [FR Doc. 98-17998 Filed 7-7-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Effective Date:
8/31/1998
Published:
07/08/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-17998
Dates:
August 31, 1998.
Pages:
36893-36894 (2 pages)
PDF File:
98-17998.pdf