-
Start Preamble
Take notice that on July 1, 2022, pursuant to section 211 of the Federal Power Act,[1] and Section 9.3.3 of the San Diego Gas & Electric Company (SDG&E) Transmission Owner Tariff (SDG&E TO Tariff), Peregrine Energy Storage, LLC filed an application requesting that the Federal Energy Regulatory Commission (Commission) issue an order requiring SDG&E to provide interconnection and transmission service for the proposed Peregrine battery energy storage facility under the terms and conditions of the Transmission Control Agreement between SDG&E and the California Independent System Operator Corporation (CAISO), the SDG&E TO Tariff, CAISO's Fifth Replacement FERC Electric Tariff,[2] and the Large Generator Interconnection Agreement among Peregrine Energy Storage, LLC, SDG&E, and CAISO, dated March 18, 2021, as they may be in effect from time to time.
Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission's Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant.
In addition to publishing the full text of this document in the Federal Register , the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission's Home Page ( http://ferc.gov ) using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission's Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID-19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or TYY, (202) 502-8659.
The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the “eFiling” link at http://www.ferc.gov . Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852.
Comment Date: 5:00 p.m. Eastern Time on July 22, 2022.
Start SignatureDated: July 1, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
Footnotes
1. 16 U.S.C. 824j (2018).
Back to Citation2. Capitalized terms that are not otherwise defined herein have the meanings set forth in the CAISO Tariff.
Back to Citation[FR Doc. 2022-14591 Filed 7-7-22; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 07/08/2022
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2022-14591
- Dates:
- 5:00 p.m. Eastern Time on July 22, 2022.
- Pages:
- 40835-40835 (1 pages)
- Docket Numbers:
- Docket No. TX22-4-000
- PDF File:
- 2022-14591.pdf