97-17840. ANR Pipeline Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 62, Number 131 (Wednesday, July 9, 1997)]
    [Notices]
    [Pages 36791-36792]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-17840]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP97-604-000]
    
    
    ANR Pipeline Company; Notice of Request Under Blanket 
    Authorization
    
    July 2, 1997.
        Take notice that on June 25, 1997, ANR Pipeline Company (ANR 500 
    Renaaissance Center, Detroit, Michigan 48243, filed a request with the 
    Commission in Docket No. CP97-604-000, pursuant to Sections 157.205, 
    157.212, and 157.216(b) of the Commission's Regulations under the 
    Natural Gas Act (NGA) for authorization to exchange a 6-inch turbine 
    meter at its Oshkosh Meter Station with a 4-inch
    
    [[Page 36792]]
    
    turbine meter at its Winchester Meter Station authorized in blanket 
    certificate issued in Docket No. CP82-480-000, all as more fully set 
    forth in the request on file with the Commission and open to public 
    inspection.
        ANR states that the purpose of the exchange is to obtain more 
    efficient use of its facilities at the two meter stations. The exchange 
    of meters will cost approximately $21,400.00. The proposed annual 
    quantities of natural gas to be delivered at these stations are 
    expected to be unaffected by the exchange of the turbine meters.
        Any person or the Commission's staff may, within 45 days after the 
    Commission has issued this notice, file pursuant to Rule 214 of the 
    Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or 
    notice of intervention and pursuant to Section 157.205 of the 
    Regulations under the NGA (18 CFR 157.205) a protest to the request. If 
    no protest is filed within the allowed time, the proposed activity 
    shall be deemed to be authorized effective the day after the time 
    allowed for filing a protest. If a protest is filed and not withdrawn 
    within 30 days after the time allowed for filing a protest, the instant 
    request shall be treated as an application for authorization pursuant 
    to Section 7 of the NGA.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 97-17840 Filed 7-8-97; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
07/09/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-17840
Pages:
36791-36792 (2 pages)
Docket Numbers:
Docket No. CP97-604-000
PDF File:
97-17840.pdf