98-18175. Columbia Gas Transmission Corporation; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 63, Number 131 (Thursday, July 9, 1998)]
    [Notices]
    [Page 37099]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-18175]
    
    
    
    [[Page 37099]]
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP98-631-000]
    
    
    Columbia Gas Transmission Corporation; Notice of Request Under 
    Blanket Authorization
    
    July 2, 1998.
        Take notice that on June 23, 1998, and supplemented on July 1, 
    1998, Columbia Gas Transmission Corporation (Columbia), 12801 Fair 
    Lakes Parkway, Fairfax, Virginia 22030-0146, filed in Docket No. CP98-
    631-000, a request pursuant to Sections 157.205 and 157.211 of the 
    Commission's Regulations under the Natural Gas Act (18 CFR 157.205 and 
    157.211) for authorization to construct and operate three points of 
    delivery to Union Light Heat and Power Company (ULH) in Campbell 
    County, Kentucky, under its blanket certificate issued in Docket No. 
    CP83-76-000, pursuant to Section 7(c) of the Natural Gas Act, all as 
    more fully set forth in the request which is on file with the 
    Commission and open to public inspection.
        Columbia requests authorization to construct and operate three new 
    points of delivery for firm transportation and will provide the service 
    pursuant to Columbia's blanket certification issued in Docket No. CP86-
    240-000. Columbia indicates that the transportation service will be 
    provided under its Storage Service Transportation (SST) Rate Schedule. 
    Columbia estimates the quantities to be delivered at each new point of 
    delivery will be approximately 440 Dth/day and 160,600 Dth annually, 
    within Columbia's authorized level of services. Columbia asserts that 
    there is no impact on Columbia's existing design day and annual 
    obligations to its customers as a result of the construction and 
    operation of these delivery points for firm transportation service.
        Columbia says the points of delivery have been requested by ULH to 
    serve both residential and commercial customers. Columbia estimates the 
    cost to construct these new points of delivery to be approximately 
    $18,000, which includes ``gross up'' for income tax purposes. Columbia 
    states that ULH will reimburse Columbia 100% of the actual cost of 
    construction.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file with the Federal 
    Energy Regulatory Commission, 888 First Street, N.E., Washington D.C. 
    20426, pursuant to Rule 214 of the Commission's Procedural Rules (18 
    CFR 385.214) a motion to intervene or notice of intervention and 
    pursuant to Section 157.205 of the Regulations under the Natural Gas 
    Act (18 CFR 157.205) a protest to the request. If no protest is filed 
    within the time allowed therefor, the proposed activity shall be deemed 
    to be authorized effective the day after the time allowed for filing a 
    protest. If a protest is filed and not withdrawn within 30 days after 
    the time allowed for filing a protest, the instant request shall be 
    treated as an application for authorization pursuant to Section 7 of 
    the Natural Gas Act.
    David P. Boergers,
    Acting Secretary.
    [FR Doc. 98-18175 Filed 7-8-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
07/09/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-18175
Pages:
37099-37099 (1 pages)
Docket Numbers:
Docket No. CP98-631-000
PDF File:
98-18175.pdf