2014-16019. Midwest Independent Transmission System Operator, Inc.; Notice of Institution of Section 206 Proceeding and Refund Effective Date  

  • Start Preamble

    On June 30, 2014, the Commission issued an order in Docket No. EL14-58-000, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e (2012), instituting an investigation into the justness and reasonableness of Midwest Independent Transmission System Operator, Inc.'s (MISO) allocation of voltage or local reliability- related revenue sufficiency guarantee costs to pseudo-tied load. Midwest Indep. Transmission Sys. Operator, Inc., 147 FERC ¶ 61, 262 (2014).

    The refund effective date in Docket No. EL14-58-000, established pursuant to section 206(b) of the FPA, will be the date of publication of this notice in the Federal Register.

    Start Signature

    Dated: June 30, 2014.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2014-16019 Filed 7-8-14; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
07/09/2014
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2014-16019
Pages:
38882-38882 (1 pages)
Docket Numbers:
Docket No. EL14-58-000
PDF File:
2014-16019.pdf