2024-14936. Airworthiness Directives; Pratt & Whitney Engines  

  • Estimated Costs

    Action Labor cost Parts cost Cost per product Cost on U.S. operators
    ECI of the HPT 2nd stage turbine hub assembly 8 work-hours × $85 per hour = $680 $0 $680 $289,000
    Visual Inspection of the HPT 2nd stage blade assembly 8 work-hours × $85 per hour = $680 0 680 289,000
    Dimensional shadowgraph inspection of HPT 2nd stage blade assemblies 8 work-hours × $85 per hour = $680 0 680 289,000

    The FAA estimates the following costs to do any necessary replacements that would be required based on the results of the inspections. The agency has no way of determining the number of aircraft that might need these replacements:

    On-Condition Costs

    Action Labor cost Parts cost Cost per product
    Replace HPT 2nd stage turbine hub assembly 0 work-hours × $85 per hour = $0 $456,000 $456,000
    Replace HPT 2nd stage blade assembly 0 work-hours × $85 per hour = $0 17,000 17,000

Document Information

Effective Date:
8/13/2024
Published:
07/09/2024
Department:
Federal Aviation Administration
Entry Type:
Rule
Action:
Final rule.
Document Number:
2024-14936
Dates:
This AD is effective August 13, 2024.
Pages:
56198-56203 (6 pages)
Docket Numbers:
Docket No. FAA-2023-1640, Project Identifier AD-2022-00283-E, Amendment 39-22768, AD 2024-12-04
RINs:
2120-AA64: Airworthiness Directives
RIN Links:
https://www.federalregister.gov/regulations/2120-AA64/airworthiness-directives
Topics:
Air transportation, Aircraft, Aviation safety, Incorporation by reference, Safety
PDF File:
2024-14936.pdf
Supporting Documents:
» U.S. DOT/FAA - Supplemental AD Documents
CFR: (1)
14 CFR 39