2024-15032. Proposed Agency Information Collection Activities; Comment Request  

  • CFR part 232 section Respondent universe Annual responses Avg. time per response (hours) Total annual burden hours (C) Total cost equivalent U.S.D
    (A) (B) (A * B = C) (C * wage rate 1 )
    232.3—Applicability 784 railroads 8 1.36 $116.86
    (d)(3)—Identification of cars not owned by RR 8 0.17 1.36 116.86
    232.7—Waivers 784 railroads 2 320.00 27,497.60
    (a)—Waivers 2 160 320.00 27,497.60
    232.15—Movement of defective equipment 784 railroads 153,400 6,642.80 570,815.80
    (a)(11)(ii)—Written Notification 25,000 0.05 1,250.00 107,412.50
    (b)—Tagging of defective equipment 128,400 0.042 5,392.80 463,403.30
    232.17—Special approval procedure 784 railroads 0.67 0.67 57.57
    (b) through (d)—Submission of petition for special approval of alternative standard or test procedure and pre-revenue service acceptance plan 0.67 1 0.67 57.57
    232.103—General requirements for all train brake systems 784 railroads 70,014 11,958.50 1,027,593.91
    —Requirement for legible decal/stencil/sticker on all cars 70,000 0.17 11,900.00 1,022,567.00
    (n)—Securement of unattended equipment—Unattended equipment plans (new plans) 1 10 10.00 859.30
    —Notification to FRA when RR develops and has plan in place or modifies existing plan 1 0.50 0.50 42.97
    —(n)(10) Records of inspection following non-railroad emergency responder on equipment 12 4 48.00 4,124.64
    232.105—General requirements for locomotives—Inspection records The burden for this requirement is included under OMB control number 2130-0004 under 49 CFR 229.23.
    232.107—Air source requirements and cold weather operations 5 new railroads 1,156 335.50 28,829.52
    (a)—Monitoring plans for yard air sources (new) 1 40 40.00 3,437.20
    —Updates/revisions 50 existing plans 5 20 100.00 8,593.00
    —Recordkeeping 50 existing plans 1,150 0.17 195.50 16,799.32
    232.109—Dynamic brake requirements 784 railroads 1,668,748 116,474.22 10,008,630.07
    (a)—Brake status records 1,656,000 0.07 115,920.00 9,961,005.60
    (c)—Inoperative dynamic brakes, tagging and records 30,000 locomotives 6,358 0.07 445.06 38,244.01
    (d)—Tagging inoperative dynamic breaks 30,000 locomotives 6,358 0.008 50.86 4,370.74
    (e)—Deactivated dynamic brakes markings 1000 locomotives 10 0.08 0.80 68.74
    (J)—Operating rules 5 4 20.00 1,718.60
    —Amended/revised operating rules 15 1 15.00 1,288.95
    —Request to increase mph overspeed restriction 1 20.5 20.50 1,761.57
    (k)—Knowledge, skill ability training plan 1 2 2.00 171.86
    232.111—Train handling information 784 railroads 2,112,105 171,160 14,707,778.80
    (a)—Written procedures for train handling 5 40 200.00 17,186.00
    —Amendments/revisions 100 20 2,000.00 171,860.00
    —Provide crew with report 2,112,000 0.08 168,960.00 14,518,732.80
    232.203—Training requirements 784 railroads 50,587 6,889.15 591,984.66
    (a)—Training programs 5 100 500.00 42,965.00
    —Periodic assessment of training program 784 1 784.00 67,369.12
    —Amendments 236 8 1,888.00 162,235.84
    (e)—Training records and notifications 24,781 0.13 3,221.53 276,826.07
    —Notifications 24,781 0.02 495.62 42,588.63
    232.205—Class I brake test—initial terminal inspection 784 railroads 383,850 4,686.08 402,674.85
    (c)(1)(ii)(B)—Operating rules for airflow compliance 10 8 80.00 6,874.40
    (e)—Brake test notice records 383,840 0.012 4,606.08 395,800.45
    (c) (1)(iii)—Form 49A notation/certification of last date of air flow method (AFM) indicator calibration (formally under § 229.29(b) The estimated paperwork burden for this requirement is included under OMB Control Number 2130-0004.
    232.207—Class IA brake tests—1000-mile inspection 784 railroads 53 9.84 845.55
    (c)—Designated list of inspection locations 1 1 1.00 85.93
    (c)(2)—Notice of change to inspection locations. 52 0.17 8.84 759.62
    232.213—Extended haul trains 83,000 long-haul trains 208 43.68 3,753.42
    (a)—Written designation in writing to FRA 104 0.25 26.00 2,234.18
    (a)(8)—Notice of change of location of brake test 7 railroads 104 0.17 17.68 1,519.24
    232.219—Double-heading and helper service 2 railroads 100 8.00 687.44
    (c)(4)—Records of device testing 100 0.08 8.00 687.44
    232.303—General requirements—shop or repair track 1,633,792 freight cars 37,600 1,408.00 120,989.44
    (d)(1)—Tagging of moved equipment 5,600 0.08 448.00 38,496.64
    (f)—Last repair track brake test or single car air brake test marking 32,000 0.03 960.00 82,492.80
    232.307—Modification of brake test procedures AAR/railroads 2 20.50 1,761.57
    (a)—Request to modify brake test procedures 1 20 20.00 1,718.60
    (a)(4)—Affirmation statement and copies served to designated representatives. 1 0.50 0.50 42.97
    232.309—Equipment and devices used to perform single car air brake tests 640 shops 5000 150.00 12,889.50
    (d)—Labeling/tagging of test devices 5000 0.03 150.00 12,889.50
    232.403—Design standards for one-way end-of-train devices 245 railroads 12 0.96 82.49
    (e)—Requesting unique code 12 0.08 0.96 82.49
    232.409—Inspection and testing of end-of-train-devices 784 railroads 464,501 4,102.00 352,484.86
    (c)—Two-way end-of-train testing notification record 447,500 0.008 3,580.00 307,629.40
    (d) through (e)—Telemetry/air pressure equipment testing record 17,000 0.03 510.00 43,824.30
    (f)(2)—Annual reports to FRA 1 manufacturer 1 12 12.00 1,031.16
    232.503—Process to introduce new brake system technology 784 railroads 2 4.00 343.72
    (a)—Special approval—approval for non-standard brake technology letter for approval 1 1 1.00 85.93
    (b)—Pre-revenue service demonstration 1 3 3.00 257.79
    232.505—Pre-revenue service acceptance testing plan 784 railroads 3.01 182.71 15,700.27
    (a)—Submission of testing plan 0.67 160 107.20 9,211.70
    —Revision to testing plan 0.67 40 26.80 2,302.92
    —Report to FRA 0.67 13 8.71 748.45
    —(f) Testing records for brake system technology previously used in revenue service in United States 1 40 40.00 3,437.20
    232.717—Freight and passenger train car brakes 40 railroads 40 240.00 20,623.20
    (c)—Written maintenance plan 40 6 240.00 20,623.20
    Total 2 784 railroads; 30,000 locomotives; 1 manufacturer 4,947,392 responses 324,638 hours $27,896,141
    1  The dollar equivalent cost throughout this table is derived from the 2022 Surface Transportation Board Full Year Wage A&B data series using employee group 200 (Professional & Administrative) hourly wage rate of $49.10. The total burden wage rate (straight time plus 75%) used in the table is $85.93 ($49.10 × 1.75 = $85.93).
    2  Total may not add up due to rounding.

Document Information

Published:
07/09/2024
Department:
Federal Railroad Administration
Entry Type:
Notice
Action:
Notice of information collection; request for comment.
Document Number:
2024-15032
Dates:
Interested persons are invited to submit comments on or before September 9, 2024.
Pages:
56474-56476 (3 pages)
Docket Numbers:
Docket No. FRA-2024-0012
PDF File:
2024-15032.pdf