95-18805. Sequoyah Nuclear Plant Units 1 and 2; Consideration of Issuance of Amendment to Facility Operating License, Proposed no Significant Hazards Consideration Determination, and Opportunity for a Hearing  

  • [Federal Register Volume 60, Number 147 (Tuesday, August 1, 1995)]
    [Notices]
    [Pages 39189-39192]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-18805]
    
    
    
    -----------------------------------------------------------------------
    
    NUCLEAR REGULATORY COMMISSION
    [Docket Nos. 50-327 and 328]
    
    
    Sequoyah Nuclear Plant Units 1 and 2; Consideration of Issuance 
    of Amendment to Facility Operating License, Proposed no Significant 
    Hazards Consideration Determination, and Opportunity for a Hearing
    
        The U.S. Nuclear Regulatory Commission (the Commission) is 
    considering issuance of an amendment to Facility Operating License Nos. 
    DPR-77 and DPR-79 issued to the Tennessee Valley Authority (the 
    licensee) for operation of the Sequoyah Nuclear Plant, Units 1 and 2, 
    located in Soddy Daisy, Tennessee.
        The proposed amendments would incorporate new requirements 
    associated with steam generator tube inspections and repair in the 
    Sequoyah Nuclear Plant, Units 1 and 2 Technical Specifications. The new 
    requirements would establish alternate steam generator tube plugging 
    criteria at the tube support plate intersections.
        Before issuance of the proposed license amendments, the Commission 
    will have made findings required by the Atomic Energy Act of 1954, as 
    amended (the Act) and the Commission's regulations.
        The Commission has made a proposed determination that the amendment 
    request involves no significant hazards consideration. Under the 
    Commission's regulations in 10 CFR 50.92, this means that operation of 
    the facility in accordance with the proposed amendments would not (1) 
    involve a significant increase in the probability or consequences of an 
    accident previously evaluated; or (2) create the possibility of a new 
    or different kind of accident from any accident previously evaluated; 
    or (3) involve a significant reduction in a margin of safety. As 
    required by 10 CFR 50.91(a), the licensee has provided its analysis of 
    the issue of no significant hazards consideration, which is presented 
    below:
    
        TVA has evaluated the proposed technical specification (TS) 
    change and has determined that it does not represent a significant 
    hazards consideration based on criteria established in 10 CFR 
    50.92(c). Operation of Sequoyah Nuclear Plant (SQN) in accordance 
    with the proposed amendment will not:
        1. Involve a significant increase in the probability or 
    consequences of an accident previously evaluated.
        Testing of model boiler specimens for free-span tubing (no tube 
    support place restraint) at room temperature conditions shows burst 
    pressures in excess of 5,000 pounds per square inch (psi) for 
    indications of outer diameter stress corrosion cracking with voltage 
    measurements as high as 19 volts. Burst testing performed on 
    intersections pulled from SQN with up to a 1.9-volt indication shows 
    measured burst pressure in excess of 6,600 psi at room temperature. 
    Burst testing performed on pulled tubes from other plants with up to 
    7.5-volt indications shows burst pressures in excess of 5,200 psi at 
    room temperatures. Correcting for the effects of temperature on 
    material properties and minimum strength levels (as the burst 
    testing was done at room temperature), tube burst capability 
    significantly exceeds the safety-factor requirements of NRC 
    Regulatory Guide (RG) 1.121.
        Tube burst criteria are inherently satisfied during normal 
    operating conditions because of the proximity of the tube support 
    plate (TSP). Since tube-to-tube support plate proximity precludes 
    tube burst during normal operating conditions, use of the criteria 
    must retain tube integrity characteristics that maintain a margin of 
    safety of 1.43 times the bounding faulted condition steam line break 
    (SLB) pressure differential. During a postulated SLB, the TSP has 
    the potential to deflect during blowdown following a main SLB, 
    thereby uncovering the TSP intersections.
        Based on the existing database, the RG 1.121 criterion requiring 
    maintenance of a safety factor of 1.43 times the SLB pressure 
    differential on tube burst is satisfied by \7/8\-inch-diameter 
    tubing with bobbin coil indications with signal amplitudes less than 
    8.82 volts (WCAP-13990), regardless of the indicated depth 
    measurement. A 2.0-volt plugging criterion (resulting in a projected 
    end-of-cycle [EOC] voltage) compares favorably with the 8.82-volt 
    structural limit considering the extremely slow apparent voltage 
    growth rates and few numbers of indications at SQN. Using the 
    established methodology of RG 1.121, the structural limit is reduced 
    by allowances for uncertainty and growth to develop a beginning of 
    cycle (BOC) repair limit that would preclude indications at EOC 
    conditions that exceed the structural limit. The nondestructive 
    examination (NDE) uncertainty component is 20.5 percent, and is 
    based on the Electric Power Research Institute (EPRI) alternate 
    repair criteria (ARC).
        Test data indicates that tube burst cannot occur within the TSP, 
    even for tubes that have 100 percent throughwall electro-discharge 
    machining notches, 0.75 inch long, provided that the TSP is adjacent 
    to the notched area. Because of the few number of indications at 
    SQN, the EPRI methodology of applying a growth component of 35 
    percent per effective full power year (EEPY) will be used. Near-term 
    operating cycles at SQN are expected to be bounded by 1.23 years, 
    therefore, a 43 percent growth component is appropriate. When these 
    allowances are added to the BOC alternate plugging criteria (APC) of 
    2.0 volts in a deterministic bounding EOC voltage of approximately 
    3.26 volts for a Cycle 7, operation can be established. A 5.56-volt 
    deterministic safety margin exists (8.82 structural limit--3.26-volt 
    EOC equal 5.56-volt margin).
        For the voltage/burst correlation, the EOC structural limit is 
    supported by a voltage of 8.82 volts. Using this structural limit of 
    8.82 volts, a BOC maximum allowable repair limit can be established 
    using the guidance of RG 1.121. The BOC maximum allowable repair 
    limit should not permit the existence of EOC indications that exceed 
    the 8.82-volt structural limit. By adding NDE uncertainty allowances 
    and an allowance for crack growth to the repair limit, the 
    structural limit can be validated. Therefore, the maximum allowable 
    BOC repair limit (RL) based on the structural limit of 8.82 volts 
    can be represented by the expressions:
        RL+(0.205 x RL)+(0.43 x RL)=8.82 volts, or, the maximum 
    allowable BOC repair limit can be expressed as,
        RL=8.82-volt structural limit/1.64=5.4 volts.
        This RL (5.4 volts) is the appropriate limit for APC 
    implementation to repair bobbin indications greater than 2.0 volts 
    independent of rotating pancake coil (RPC) confirmation of the 
    indication. This 5.4-volt upper limit for non-confirmed RPC calls is 
    consistent with other recently approved APC programs (Farley Nuclear 
    Plan, Unit 2).
        The conservatism of the growth allowance used to develop the 
    repair limit is shown by the most recent SQN eddy current data. Two 
    tubes plugged in Unit 1 during the last outage had less than one 
    volt of growth over the past five operating cycles. Only seven tubes 
    in Unit 2 required repair because of outside diameter stress 
    corrosion cracking (ODSCC) at the TSP intersections.
        Relative to the expected leakage during accident condition 
    loadings, it has been previously established that a postulated main 
    SLB outside of containment, but upstream of the main steam isolation 
    valve (MSIV), represents the most limiting radiological condition 
    relative to the APC. Implementation of the APC will determine 
    whether the distribution of cracking indications at the TSP 
    intersections is projected to be such that primary-to-
    
    [[Page 39190]]
    secondary leakage would result in site boundary doses within a small 
    fraction of the 10 CFR part 100 guidelines. A separate analysis has 
    determined this allowable SLB leakage limit to be 4.3 gallons per 
    minute (gpm) in the faulted loop. This limit uses the TS reactor 
    coolant system (RCS) Iodine-131 activity level of 1.0 microcuries 
    per gram dose equivalent Iodine-131 and the recommended Iodine-131 
    transient spiking values consistent with NUREG-0800. The analysis 
    method is WCAP-14277, which is consistent with the guidance of the 
    NRC draft generic letter (GL) and will be used to calculate EOC 
    leakage. Because of the relatively low number of indications at SQN, 
    it is expected that the actual leakage values will be far less than 
    this limit. Additionally, the current Iodine-131 levels at SQN range 
    from about 25 to 100 times less than the TS limit.
        Application of the criteria requires the projection of 
    postulated SLB leakage, based on the projected EOC voltage 
    distribution for Cycle 8 operation. Projected EOC voltage 
    distribution is developing using the most recent EOC eddy current 
    results and a voltage measurement uncertainty. Data indicates that a 
    threshold voltage of 2.8 volts would result in throughwall cracks 
    long enough to leak at SLB condition. The draft GL requires that all 
    indications to which the APC are applied must be included in the 
    leakage projection. Tube pull results from another plant with \7/8\-
    inch tubing with a substantial voltage growth database have shown 
    that tube wall degradation of greater than 40 percent throughwall 
    was readily detectable either by the bobbin or RPC probe.
        The tube with maximum throughwall penetration of 56 percent (42 
    average) had a voltage of 2.02 volts. The SQN Unit 1 pulled tube had 
    a 1.93-volt indication with a maximum depth of 91 percent and did 
    not leak at SLB condition. Based on the SQN pulled tube and industry 
    pulled tube data supporting a lower threshold for SLB leakage of 2.8 
    volts, inclusion of all APC intersections in the leakage model is 
    quite conservative. The ODSCC occurring at SQN is in its earliest 
    stages of development. The conservative bounding growth estimations 
    to be applied to the expected small number of indications for the 
    upcoming inspection should result in very small levels of predicted 
    SLB leakage. Historically, SQN has not identified ODSCC as a 
    contributor to operational leakage.
        I order to assess the sensitivity of an indication's BOC voltage 
    to EOC leakage potential, a Monte Carlo simulation was performed for 
    a 2.0-volt BOC indication. The maximum EOC voltage (at 99.8 percent 
    cumulative probability) was found to be 4.8 volts. The leakage 
    component from an indication of this magnitude, using either the 
    NUREG-1477 or EPRI leakage models, is 0.12 or 0.028 gpm, 
    respectively.
        Therefore, as implementation of the 2.0-volt APC does not 
    adversely affect steam generator (S/G) tube integrity and 
    implementation will be shown to result in acceptable dose 
    consequences, the proposed amendment does not result in significant 
    increase in the probability or consequences of an accident 
    previously evaluated.
        2. Create the possibility of a new or different kind of accident 
    from any previously analyzed.
        Implementation of the proposed S/G tube APC does not introduce 
    any significant changes to the plant design basis. Use of the 
    criteria does not provide a mechanism that could result in an 
    accident outside of the region of the TSP elevations; no ODSCC is 
    occurring outside the thickness of the TSP. Neither a single or 
    multiple tube rupture event would be expected in a S/G in which the 
    plugging criteria is applied (during all plant conditions).
        TVA will implement a maximum leakage rate limit of 150 gallon 
    per day per S/G to help preclude the potential for excessive leakage 
    during all plant conditions. The SQN TS limits on primary-to-
    secondary leakage at operating conditions include a maximum of 0.42 
    gpm (600 gallons per day [gpd]) for all S/Gs, or, a maximum of 150 
    gpd for any one S/G. The RG 1.121 criterion for establishing 
    operational leakage rate limits that require plant shutdown is based 
    upon leak-before-break considerations to detect a free-span crack 
    before potential tube rupture during faulted plant conditions. The 
    150-gpd limit should provide for leakage detection and plant 
    shutdown in the event of the occurrence of an unexpected single 
    crack resulting in leakage that is associated with the longest 
    permissible crack length. RG 1.121 acceptance criteria for 
    establishing operating leakage limits are based on leak-before-break 
    considerations such that plant shutdown is initiated if the leakage 
    associated with the longest permissible crack is exceeded. The 
    longest permissible crack is the length that provides a factor of 
    safety of 1.43 against bursting at faulted conditions maximum 
    pressure differential. A voltage amplitude of 8.82 volts for typical 
    ODSCC corresponds to meeting this tube burst requirement at a lower 
    95 percent prediction limit on the burst correlation coupled with 
    95/95 lower tolerance limit material properties. Alternate crack 
    morphologies can correspond to 8.82 volts so that a unique crack 
    length is not defined by the burst pressure versus voltage 
    correlation. Consequently, typical burst pressure versus through-
    wall crack length correlations are used below to define the 
    ``longest permissible crack'' for evaluating operating leakage 
    limits.
        The single through-wall crack lengths that result in tube burst 
    at 1.43 times the SLB pressure differential and the SLB pressure 
    differential alone are approximately 0.57 inch and 0.84 inch, 
    respectively. A leak rate of 150 gpd will provide for detection of 
    0.4-inch-long cracks at nominal leak rates and 0.6-inch-long cracks 
    at the lower 95 percent confidence level leak rates. Since tube 
    burst is precluded during normal operation because of the proximity 
    of the TSP to the tube and the potential exists for the crevice to 
    become uncovered during SLB conditions, the leakage from the maximum 
    permissible crack must preclude tube burst at SLB conditions. Thus, 
    the 150-gpd limit provides for plant shutdown before reaching 
    critical crack lengths for SLB conditions. Additionally, this leak-
    before-break evaluation assumes that the entire crevice area is 
    uncovered during blowdown. Partial uncover will provide benefit to 
    the burst capacity of the intersection.
        As S/G tube integrity upon implementation of the 2.0-volt APC 
    continues to be maintained through in-service inspection and 
    primary-to-secondary leakage monitoring, the possibility of a new or 
    different kind of accident from any accident previously evaluated is 
    not created.
        3. Involve a significant reduction in a margin of safety.
        The use of the voltage based APC at SQN is demonstrated to 
    maintain S/G tube integrity commensurate with the criteria of RG 
    1.121. RG 1.121 describes a method acceptable to the NRC Staff for 
    meeting General Design Criteria (GDC) 14, 15, 31, and 32 by reducing 
    the probability or the consequences of S/G tube rupture. This is 
    accomplished by determining the limiting conditions of degradation 
    of S/G tubing, as established by in-service inspection, for which 
    tubes with unacceptable cracking should be removed from service. 
    Upon implementation of the criteria, even under the worst-case 
    conditions, the occurrence of ODSCC at the TSP elevations is not 
    expected to lead to a S/G tube rupture event during normal or 
    faulted plant conditions. The EOC distribution of crack indications 
    at the TSP elevations will be confirmed to result in acceptable 
    primary-to-secondary leakage during all plant conditions and 
    radiological consequences are not adversely impacted.
        In addressing the combined effects of loss-of-coolant accident 
    (LOCA), plus safe shutdown earthquake (SSE) on the S/G component (as 
    required by GDC 2), it has been determined that tube collapse may 
    occur in the S/Gs at some plants. This is the case as the TSP may 
    become deformed as a result of lateral loads at the wedge supports 
    at the periphery of the plate because of the combined effects of the 
    LOCA rarefaction wave and SSE loadings. Then, the resulting pressure 
    differential on the deformed tubes may cause some of the tubes to 
    collapse.
        There are two issues associated with S/G tube collapse. First, 
    the collapse of S/G tubing reduces the RCS flow area through the 
    tubes. The reduction in flow area increases the resistance to flow 
    of steam from the core during a LOCA, which in turn, may potentially 
    increase peak clad temperature (PCT). Second, there is a potential 
    that partial through-wall cracks in tubes could progress to through-
    wall cracks during tube deformation or collapse.
        Consequently, since the leak-before-break methodology is 
    applicable to the SQN reactor coolant loop piping, the probability 
    of breaks in the primary loop piping is sufficiently low that they 
    need not be considered in the structural design of the plant. The 
    limiting LOCA event becomes either the accumulator line break or the 
    pressurize surge line break. LOCA loads for the primary pipe breaks 
    were used to bound the conditions at SQN for smaller breaks. The 
    results of the analysis using the larger break inputs show that the 
    LOCA loads were found to be of insufficient magnitude to result in 
    S/G tube collapse or significant deformation. The LOCA, plus SSE 
    tube collapse evaluation performed for another plant with Series 51 
    S/Gs using 
    
    [[Page 39191]]
    bounding input conditions (large-break loadings), is applicable to SQN. 
    Therefore, at SQN, no tubes will be excluded from using the voltage 
    repair criteria due to deformation of collapse of S/G tubes 
    following a LOCA plus an SSE.
        Addressing RG 1.83 considerations, implementation of the bobbin 
    probe voltage based interim tube plugging criteria of 2.0 volt is 
    supplemented by: (1) Enhanced eddy current inspection quidelines to 
    provide consistency in voltage normalization, (2) a 100 percent eddy 
    current inspection sample size at the TSP elevations, and (3) RPC 
    inspection requirements for the larger indications left in service 
    to characterize the principal degradation as ODSCC.
        As noted previously, implementation of the TSP elevation 
    plugging criteria will decrease the number of tubes that must be 
    repaired. The installation of S/G tube plugs reduces the RCS flow 
    margin. Thus, implementation of the alternate plugging criteria will 
    maintain the margin of flow that would otherwise be reduced in the 
    event of increased tube plugging.
        Based on the above, it is concluded that the proposed license 
    amendment request does not result in a significant reduction in 
    margin of safety.
    
        The NRC staff has reviewed the licensee's analysis and, based on 
    this review, it appears that the three standards of 10 CFR 50.92(c) are 
    satisfied. Therefore, the NRC staff proposes to determine that the 
    amendment request involves no significant hazards consideration.
        The Commission is seeking public comments on this proposed 
    determination. Any comments received within 30 days after the date of 
    publication of this notice will be considered in making any final 
    determination.
        Normally, the Commission will not issue the amendments until the 
    expiration of the 30-day notice period. However, should circumstances 
    change during the notice period such that failure to act in a timely 
    way would result, for example, in derating or shutdown of the facility, 
    the Commission may issue the license amendment before the expiration of 
    the 30-day notice period, provided that its final determination is that 
    the amendments involve no significant hazards consideration. The final 
    determination will consider all public and State comments received. 
    Should the Commission take this action, it will publish in the Federal 
    Register a notice of issuance and provide for opportunity for a hearing 
    after issuance. The Commission expects that the need to take this 
    action will occur very infrequently.
        Written comments may be submitted by mail to the Rules Review and 
    Directives Branch, Division of Freedom of Information and Publications 
    Services, Office of Administration, U.S. Nuclear Regulatory Commission, 
    Washington, DC 20555, and should cite the publication date and page 
    number of this Federal Register notice. Written comments may also be 
    delivered to Room 6D22, Two White Flint North, 11545 Rockville Pike, 
    Rockville, Maryland, from 7:30 a.m. to 4:15 p.m. Federal workdays. 
    Copies of written comments received may be examined at the NRC Pubic 
    Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC.
        The filing of requests for hearing and petitions for leave to 
    intervene is discussed below.
        By August 31, 1995, the licensee may file a request for a hearing 
    with respect to issuance of the amendment to the subject facility 
    operating license and any person whose interest may be affected by this 
    proceeding and who wishes to participate as a party in the proceeding 
    must file a written request for a hearing and a petition for leave to 
    intervene. Requests for a hearing and a petition for leave to intervene 
    shall be filed in accordance with the Commission's ``Rules of Practice 
    for Domestic Licensing Proceedings'' in 10 CFR part 2. Interested 
    persons should consult a current copy of 10 CFR 2.714 which is 
    available at the Commission's Public Document Room, the Gelman 
    Building, 2120 L Street, NW., Washington, DC, and at the local public 
    document room located at the Chattanooga-Hamilton County Library, 1101 
    Broad Street, Chattanooga, Tennessee 37402. If a request for a hearing 
    or petition for leave to intervene is filed by the above date, the 
    Commission or an Atomic Safety and Licensing Board, designated by the 
    Commission or by the Chairman of the Atomic Safety and Licensing Board 
    Panel, will rule on the request and/or petition; and the Secretary or 
    the designated Atomic Safety and Licensing Board will issue a notice of 
    hearing or an appropriate order.
        As required by 10 CFR 2.714, a petition for leave to intervene 
    shall set forth with particularity the interest of the petitioner in 
    the proceeding, and how that interest may be affected by the results of 
    the proceeding. The petition should specifically explain the reasons 
    why intervention should be permitted with particular reference to the 
    following factors: (1) The nature of the petitioner's right under the 
    Act to be made party to the proceeding; (2) the nature and extent of 
    the petitioner's property, financial, or other interest in the 
    proceeding; and (3) the possible effect of any order which may be 
    entered in the proceeding on the petitioner's interest. The petition 
    should also identify the specific aspect(s) of the subject matter of 
    the proceeding as to which petitioner wishes to intervene. Any person 
    who has filed a petition for leave to intervene or who has been 
    admitted as a party may amend the petition without requesting leave of 
    the Board up to 15 days prior to the first prehearing conference 
    scheduled in the proceeding, but such an amended petition must satisfy 
    the specificity requirements described above.
        Not later than 15 days prior to the first prehearing conference 
    scheduled in the proceeding, a petitioner shall file a supplement to 
    the petition to intervene which must include a list of the contentions 
    which are sought to be litigated in the matter. Each contention must 
    consist of a specific statement of the issue of law or fact to be 
    raised or controverted. In addition, the petitioner shall provide a 
    brief explanation of the bases of the contention and a concise 
    statement of the alleged facts or expert opinion which support the 
    contention and on which the petitioner intends to rely in proving the 
    contention at the hearing. The petitioner must also provide references 
    to those specific sources and documents of which the petitioner is 
    aware and on which the petitioner intends to rely to establish those 
    facts or expert opinion. Petitioner must provide sufficient information 
    to show that a genuine dispute exists with the applicant on a material 
    issue of law or fact. Contentions shall be limited to matters within 
    the scope of the amendment under consideration. The contention must be 
    one which, if proven, would entitle the petitioner to relief. A 
    petitioner who fails to file such a supplement which satisfies these 
    requirements with respect to at least one contention will not be 
    permitted to participate as a party. Those permitted to intervene 
    become parties to the proceeding, subject to any limitations in the 
    order granting leave to intervene, and have the opportunity to 
    participate fully in the conduct of the hearing, including the 
    opportunity to present evidence and cross-examine witnesses.
        If a hearing is requested, the Commission will make a final 
    determination on the issue of no significant hazards consideration. The 
    final determination will serve to decide when the hearing is held.
        If the final determination is that the amendment request involves 
    no significant hazards consideration, the Commission may issue the 
    amendment and make it immediately effective, notwithstanding the 
    request for a 
    
    [[Page 39192]]
    hearing. Any hearing held would take place after issuance of the 
    amendment.
        If the final determination is that the amendment request involves a 
    significant hazards consideration, any hearing held would take place 
    before the issuance of any amendment.
        A request for a hearing or a petition for leave to intervene must 
    be filed with the Secretary of the Commission, U.S. Nuclear Regulatory 
    Commission, Washington, DC 20555, Attention: Docketing and Services 
    Branch, or may be delivered to the Commission's Public Document Room, 
    the Gelman Building, 2120 L Street, NW., Washington, DC, by the above 
    date. Where petitions are filed during the last 10 days of the notice 
    period, it is requested that the petitioner promptly so inform the 
    Commission by a toll-free telephone call to Western Union at 1-(800) 
    248-5100 (in Missouri 1-(800) 342-6700). The Western Union operator 
    should be given Datagram Identification Number N1023 and the following 
    message addressed to Frederick J. Hebdon: petitioner's name and 
    telephone number, date petition was mailed, plant name, and publication 
    date and page number of this Federal Register notice. A copy of the 
    petition should also be sent to the Office of the General Counsel, U.S. 
    Nuclear Regulatory Commission, Washington, DC 20555, and to General 
    Council, Tennessee Valley Authority, ET 11H, 400 West Summit Hill 
    Drive, Knoxville, Tennessee 37902, attorney for the licensee.
        Nontimely filings of petitions for leave to intervene, amended 
    petitions, supplemental petitions and/or requests for hearing will not 
    be entertained absent a determination by the Commission, the presiding 
    officer or the presiding Atomic Safety and Licensing Board that the 
    petition and/or request should be granted based upon a balancing of the 
    factors specified in 10 CFR 2.714(a)(1) (i)-(v) and 2.714(d).
        For further details with respect to this action, see the 
    application for amendment dated July 19, 1995, which is available for 
    public inspection at the Commission's Public Document Room, the Gelman 
    Building, 2120 L Street, NW., Washington, DC, and at the local public 
    document room located at the Chattanooga-Hamilton County Library, 1101 
    Broad Street, Chattanooga, Tennessee 37402.
    
        Dated at Rockville, MD, this 26th day of July 1995.
    
        For the Nuclear Regulatory Commission,
    David E. LaBarge, Sr.
    Project Manager, Project Directorate II-3, Division of Reactor 
    Projects--I/II, Office of Nuclear Reactor Regulation.
    [FR Doc. 95-18805 Filed 7-31-95; 8:45 am]
    BILLING CODE 7590-01-M
    
    

Document Information

Published:
08/01/1995
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Document Number:
95-18805
Pages:
39189-39192 (4 pages)
Docket Numbers:
Docket Nos. 50-327 and 328
PDF File:
95-18805.pdf