97-20737. National Environmental Policy Act Implementing Procedures  

  • [Federal Register Volume 62, Number 154 (Monday, August 11, 1997)]
    [Proposed Rules]
    [Pages 42958-42964]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-20737]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    POSTAL SERVICE
    
    39 CFR Parts 775, 777 and 778
    
    
    National Environmental Policy Act Implementing Procedures
    
    AGENCY: Postal Service (USPS).
    
    ACTION: Proposed rule.
    
    -----------------------------------------------------------------------
    
    SUMMARY: This proposal would revise existing procedures and categorical 
    exclusions governing the Postal Service's compliance with the National 
    Environmental Policy Act (NEPA). The proposed amendments are based upon 
    experience with existing regulations and new policies and 
    infrastructure that have been implemented since the restructuring of 
    the Postal Service in 1992. The proposed changes are intended to comply 
    with the requirements of NEPA while improving quality and reducing 
    administrative processes and preparation.
    
    DATE: Comments must be received by September 10, 1997.
    
    ADDRESSES: Please submit written comments to Charles E. Bravo, Manager, 
    Environmental Management Policy, U.S. Postal Service, 475 L'Enfant 
    Plaza SW Room 1P830, Washington, DC 20260-2810, fax (202) 268-6016.
    
    FOR FURTHER INFORMATION CONTACT: Charles A. Vidich, Environmental 
    Coordinator, U.S. Postal Service, 8 Griffin Rd. N., Windsor, CT 06006-
    7030, phone (860) 285-7254, or Gary W. Bigelow, Senior Counsel, 
    Environmental Law, 4200 Wake Forest Rd., Raleigh, NC 27668-1121, phone 
    (919) 501-9439.
    
    SUPPLEMENTARY INFORMATION: Historically, the U.S. Postal Service has 
    implemented the provisions of the National Environmental Policy Act 
    (NEPA) through policies and procedures established by the Postal 
    Service's Facilities organization. Certainly, most of the ``major 
    federal actions'' undertaken by the Postal Service have been associated 
    with the construction or disposal of postal facilities. However, in 
    recent years it has become increasingly evident that other postal 
    organizations also have a role in implementing the provisions of NEPA. 
    The Postal Service is revising its regulations to clarify the scope of 
    the applicability of NEPA.
        The proposed changes revise procedures for implementing the 
    requirements of NEPA. They require Postal Service officials to consider 
    potential impacts of major federal actions to the human environment. To 
    properly implement the provisions of the Act, responsible Postal 
    Service officials must perform adequate environmental analyses to 
    determine whether identified impacts are significant. An Environmental 
    Impact Statement (EIS) is required if the impacts are determined to be 
    significant; otherwise, an environmental assessment (EA) is prepared, 
    unless the action is categorically excluded or there is no potential 
    for significant impact.
        Responsible officials will complete an environmental checklist to 
    identify potential environmental concerns outside of the NEPA process, 
    such as permitting requirements, and to determine the need for 
    preparing an EA. Although NEPA does not require the preparation of an 
    environmental checklist, it is Postal Service policy to use the 
    environmental checklist as a planning tool to better identify the 
    environmental consequences of proposed actions that have potential for 
    impacts upon the environment.
        The proposed changes respond to numerous suggestions for additional 
    categorical exclusions (CATEXs), modifications to existing exclusions, 
    and clarification of the scope of the NEPA requirements. The changes 
    are connected with experience with the types of actions that generally 
    do not require an EA or result in a finding of no significant impact 
    (FONSI). In addition, the Postal Service reorganized in 1992 and its 
    missions, programs, and policies have evolved to meet the requirements 
    of the competitive market and to continue to provide a business-like 
    public service to the American public. Accordingly, the Postal Service 
    needs to make changes to its NEPA regulations consistent with its 
    restructured operation.
        In order to produce an update of the CATEXs, the Postal Service 
    reviewed EAs and FONSIs that it has issued. It also reviewed other 
    federal agency CATEXs to ensure the appropriateness of the exclusions. 
    The results form the basis for the proposed amendments. The proposed 
    changes are consistent with guidance provided by the Council on 
    Environmental Quality (CEQ), which encourages flexibility in the NEPA 
    implementing procedures to reduce administrative burdens and promote 
    efficiency. The Postal Service has consulted the CEQ regarding these 
    proposed amendments. The proposed CATEXs would not affect the Postal 
    Service's responsibility for compliance with other applicable federal, 
    state, or local environmental laws, including the Clean Air Act, Clean 
    Water Act, and existing postal floodplain and wetland regulations.
        The proposed changes are intended to adjust the Postal Service's 
    normal levels of NEPA review and to add, modify, and clarify classes of 
    actions based upon experience in applying NEPA. The listings do not 
    constitute a conclusive determination regarding the appropriate level 
    of review for a proposed action. The identified categories of CATEXs 
    and actions that normally require an EA presume that the level of 
    review is appropriate. The presumptions do not apply when unusual or 
    extraordinary circumstances related to the action that may affect the 
    significance of the proposed action. An example of an extraordinary 
    circumstance could be the proposed construction of a small structure in 
    the middle of wetlands that harbor protected endangered species.
    
    Description of Proposed Amendments
    
        This section describes the proposed amendments to the Postal 
    Service NEPA regulations at 39 CFR part 775. Subchapter K is renamed 
    Environmental Regulations to more accurately describe the subchapter 
    that contains NEPA and wetland and floodplain regulations. Parts 777 
    and 778 are redesignated from Subchapter K to the formerly reserved 
    Subchapter L, Special Regulations.
        Part 775 is similarly renamed National Environmental Policy Act 
    Procedures. Section 775.1, Purpose, is revised by deleting the language 
    in the second sentence.
        Section 775.3(a), Responsibilities, is revised to indicate that the 
    Chief Environmental Officer of the Postal Service is the person 
    responsible for overall development of policy regarding NEPA, and each 
    39 CFR part 4 officer with responsibility over the proposed program, 
    project, action, or facility is responsible for compliance with NEPA as 
    the responsible official. The officer who is in charge of the 
    facilities organization is responsible for the development of NEPA 
    policy as it affects real estate and construction or disposal of postal 
    facilities. Paragraph (b) is revised to state that environmental 
    coordinators are designated by postal management to assist in 
    compliance with NEPA requirements because the Postal Service has 
    reorganized and renamed many of the groups referenced in the original 
    regulation.
    
    [[Page 42959]]
    
        Section 775.4 is a new section with definitions. The Postal Service 
    incorporates by reference those definitions set forth in CEQ's 
    regulations contained in 40 CFR part 1508. Additional definitions 
    pertaining to postal documents or types of officials are also listed.
        Existing Sec. 775.4, Typical classes of action, is split up and 
    renamed and renumbered as Sec. 775.5, Classes of Actions, and 
    Sec. 775.6, Categorical Exclusions. Section 775.4(a) is renumbered as 
    Sec. 775.5 and revised to state that the Postal Service does not 
    normally conduct actions requiring an EIS, but will prepare an EIS 
    based on the factors in the CEQ regulations. Classes of actions that 
    normally require EAs have been revised and include:
        1. Any project that includes the conversion, purchase, or any other 
    alteration of the fuel source for 25 percent or more of USPS vehicles 
    operating with fuel other than diesel or gasoline in any carbon 
    monoxide or ozone nonattainment area.
        2. Any action that would adversely affect a federally listed 
    threatened or endangered species or its habitat.
        3. Any action that would directly affect public health.
        4. Any action that would require development within park lands, or 
    be located in close proximity to a wild or scenic river or other 
    ecologically critical area.
        5. Any action affecting the quality of the physical environment 
    that would be scientifically highly controversial.
        6. Any action that may have highly uncertain or unknown risks on 
    the human environment.
        7. Any action that threatens a violation of applicable federal, 
    state, or local law or requirements imposed for the protection of the 
    environment.
        8. New construction of a facility with vehicle maintenance or 
    petroleum fuel dispensing capabilities, whether owned or leased.
        9. Acquisition or lease of an existing building involving new uses 
    or a change in use to a greater environmental intensity.
        10. Real property disposal involving a known change in use to a 
    greater environmental intensity.
        11. Postal facility function changes involving new uses of greater 
    environmental intensity.
        12. Reduction in force involving more than 1000 positions.
        13. Relocation of 300 or more employees more than 50 miles.
        14. Initiation of legislation.
        Paragraph (b) of existing Sec. 775.4, Categorical Exclusions, is 
    revised and renumbered as Sec. 775.6, Categorical Exclusions. The 
    classes of actions in paragraphs (b) through (e) of this section are 
    those that the Postal Service has determined do not individually or 
    cumulatively have a significant impact on the human environment and, 
    therefore, do not require the preparation of an EA or EIS. In order to 
    be categorically excluded, a proposed action must be based on a 
    determination that the action fits within a class listed and that there 
    are no extraordinary circumstances that may affect the significance of 
    the proposal. Extraordinary circumstances are those unique situations 
    presented by specific proposals, such as scientific controversy about 
    the environmental impacts of the proposal or uncertain effects or 
    effects involving unique resources or unknown risks. The proposed 
    action must also not be connected to other actions with potentially 
    significant actions or is not related to other proposed actions with 
    potentially significant impacts.
        The CATEXs are listed in the following order: Those relating to 
    general agency actions; emergency and restoration actions; maintenance 
    and repair actions; and real estate and construction activities. The 
    general agency actions relate to activities that in and of themselves 
    do not normally impact the environment, such as policy development, 
    planning, procurement, training, research, and other administrative 
    processes. The emergency and environmental restoration actions relate 
    to emergency, disaster-related, and environmental restoration or 
    remediation activities. The maintenance and repair actions involve 
    activities that are minor or involve replacement of equipment and 
    upkeep of buildings. Real estate and construction activities concern 
    the acquisition, construction, and disposal of real property.
        Paragraph (b) states that the listed CATEXs that relate to general 
    agency actions are classes of actions that have been determined to not 
    have a significant impact upon the environment and therefore do not 
    require an EA or EIS. These are new CATEXs except where indicated.
        (1) Policy development, planning, and implementation that relate to 
    routine activities such as personnel, organizational changes, or 
    similar administrative functions.
        (2) Routine actions, including the management of programs or 
    activities necessary to support the normal conduct of agency business, 
    such as administrative, financial, operational, and personnel actions 
    that involve no commitment of resources other than manpower and funding 
    allocations.
        (3) Award of contracts for technical support services, management 
    and operation of a government-owned facility, and personal services.
        (4) Research activities and studies and routine data collection 
    when such actions are clearly limited in context and intensity.
        (5) Educational and informational programs and activities.
        (6) Reduction in force resulting from workload adjustments, reduced 
    personnel or funding levels, skill imbalances, or other similar causes 
    that do not affect more than 1,000 positions.
        (7) Postal rate or mail classification actions, address information 
    system changes, post office name changes, and ZIP Code changes. 
    (Revised and renumbered from existing Sec. 775.4(b)(14).)
        (8) Property protection, law enforcement, and other legal 
    activities undertaken by the Postal Inspection Service, General 
    Counsel, the Judicial Officer, and the Inspector General.
        (9) Activities related to trade representation and market 
    development activities abroad.
        (10) Emergency preparedness planning activities, including 
    designation of on-site evacuation routes.
        (11) Minor reassignment of motor vehicles and purchase or 
    deployment of motor vehicles to new locations that do not adversely 
    impact traffic safety, congestion, or air quality. (Revised and 
    renumbered from Sec. 775.4(b)(13).)
        (12) Procurement or disposal of mail handling or transport 
    equipment. (Revised and renumbered from Sec. 775.4(b)(13).)
        (13) Acquisition, installation, operation, removal, or disposal of 
    communication systems, computers, and data processing equipment.
        (14) Postal facility function changes not involving construction, 
    where there are no substantial relocations of employees or no 
    substantial increase in the number of motor vehicles at a facility. 
    (Revised and renumbered from Sec. 775.4(b)(15).)
        (15) Closure or consolidation of post offices under 39 U.S.C. 
    404(b).
        (16) Minor operational changes at an existing facility to minimize 
    waste generation and for reuse of materials. These changes include, but 
    are not limited to, adding filtration and recycling systems to allow 
    reuse of vehicle or machine oil, setting up sorting areas to improve 
    process efficiency, and segregating waste streams previously mingled 
    and assigning new identification codes to the two resulting streams.
        (17) Actions that have an insignificant effect upon the environment 
    as
    
    [[Page 42960]]
    
    established in a previously written Environmental Assessment (EA) and 
    Finding of No Significant Impact (FONSI) or Environmental Impact 
    Statement (EIS). Such repetitive actions shall be considered 
    ``reference actions,'' and a record of all decisions concerning these 
    ``reference actions'' shall be maintained by the Chief Environmental 
    Officer or designee. The proposed action must be essentially the same 
    in context and the same or less in intensity or must create fewer 
    impacts than the ``reference action'' previously studied under an EA or 
    EIS in order to qualify for this exclusion.
        (18) Rulemakings that are strictly procedural, and interpretations 
    and rulings with existing regulations, or modifications or rescissions 
    of such interpretations and rulings.
        Paragraph (c) lists emergency or restoration actions that are 
    CATEXs. These are new CATEXs.
        (1) Any cleanup, remediation, or removal action conducted under the 
    provisions of the Comprehensive Environmental Response Compensation and 
    Liability Act (CERCLA) or the Resource Conservation Recovery Act 
    (RCRA), any asbestos abatement actions regulated under the provisions 
    of the Occupational Safety and Health Act (OSHA) or the Clean Air Act, 
    or any polychlorinated biphenyls (PCB) transformer replacement or any 
    lead-based paint abatement actions regulated under the provisions of 
    the Toxic Substances Control Act (TSCA), OSHA, or RCRA.
        (2) Testing associated with environmental cleanups or site 
    investigations.
        Paragraph (d) lists CATEXs concerning maintenance or repair actions 
    at existing facilities that do not have a significant impact upon the 
    environment. Revised and renumbered CATEXs are indicated.
        (1) Siting, construction or operation of temporary support 
    buildings or support structures.
        (2) Routine maintenance and minor activities, such as fencing, that 
    occur in floodplains or state and local wetlands or pursuant to the 
    nationwide permitting process of the Corps of Engineers.
        (3) Routine actions normally conducted to protect and maintain 
    properties and which do not alter the configuration of the building. 
    (Renumbered from Sec. 775.4(b)(6)).
        (4) Changes in buildings required to promote handicapped 
    accessibility pursuant to the Architectural Barriers Act.
        (5) Repair to, or replacement in kind or equivalent of building 
    equipment or components (e.g., electrical distribution, HVAC systems, 
    doors, windows, roofs, etc.). (Revised and renumbered 
    Sec. 775.4(b)(7)).
        (6) Internal modifications or improvements to structures or 
    buildings to accommodate mail processing, computer, communication or 
    other similar types of equipment or other actions which do not involve 
    modification to the external walls of the facility.
        (7) Joint development and/or joint use projects that only involve 
    internal modifications to an existing facility. (Revised and renumbered 
    from Sec. 775.4(b)(12)).
        (8) Noise abatement measures, such as construction of noise 
    barriers and installation of noise control materials.
        (9) Actions which require concurrence or approval of another 
    federal agency where the action is a categorical exclusion under the 
    NEPA regulations of that federal agency.
        Paragraph (e) concerns CATEXs applicable to real estate actions. 
    Revised and renumbered CATEXs are indicated.
        (1) Obtaining, granting, disposing, or changing of easements, 
    licenses and permits, rights-of-way and similar interests. (Renumbered 
    from Sec. 775.4(b)(8)).
        (2) Extension, renewal, renegotiation, or termination of existing 
    lease agreements. (Renumbered from Sec. 775.4(b)(11)).
        (3) Purchase of Postal Service occupied leased property where the 
    planned postal uses do not differ significantly from the past uses of 
    the site. (Renumbered from Sec. 775.4(b)(10).
        (4) Acquisition or disposal of existing facilities and real 
    property where the planned uses do not differ significantly from past 
    uses of the site. (Renumbered and revised from Sec. 775.4(b)(2) & (9)).
        (5) Acquisition of real property not connected to specific facility 
    plans or when necessary to protect the interests of the Postal Service 
    in advance of final project approval. This categorical exclusion only 
    applies to the acquisition. Any subsequent use of the site for a 
    facility project must be considered under this part. (Revised and 
    renumbered from Sec. 775.4(b)(5)).
        (6) Disposal through sale or outlease of unimproved real property 
    (Renumbered and revised from Sec. 775.4(b)(9)).
        (7) Disposal through sale, outlease, transfer or exchange of real 
    property to other federal or state agencies.
        (8) Acquisition or disposal through sale, lease, transfer or 
    exchange of real property that do not involve any increase in volumes, 
    concentrations, or discharge rates of wastes, air emissions, or water 
    effluents, and that under reasonably foreseeable uses, have generally 
    similar environmental impacts as compared to those before the 
    acquisition or disposal. A determination that the proposed action is 
    categorically excluded can be based upon a previous reference action.
        (9) Acquisition or disposal through sale, lease, transfer, 
    reservation or exchange of real property for nature and habitat 
    preservation, conservation, a park or wildlife management.
        (10) New construction, Postal Service owned or leased, or joint 
    development and/or joint use projects, of any facility unless the 
    proposed action is listed as requiring an EA in Sec. 775.5 (Revised and 
    renumbered from Sec. 775.4(b)(1)).
        (11) Expansion or improvement of an existing facility where the 
    expansion is within the boundaries of the site or occurs in a 
    previously developed area unless the proposed action is listed as 
    requiring an EA in Sec. 775.5.
        (12) Construction and disturbance pursuant to a nationwide permit 
    issued by the Corp of Engineers.
        (13) Any activity in floodplains being regulated pursuant to Part 
    776 and which is not listed as requiring an EA in Sec. 775.5.
        Section 775.5 is renumbered to Sec. 775.8. No revisions are made to 
    this section.
        A new Sec. 775.7 is added entitled Planning and early coordination. 
    This section outlines the necessity for planning and early coordination 
    for all NEPA documents. Operational personnel and facilities personnel 
    must cooperate in the early concept stages of a program or project in 
    order to fully evaluate the ramifications of the proposed action since 
    certain decisions made early in the planning concept may fix later 
    impacts and results.
        Section 775.6 Environmental evaluation process is renumbered to 
    Sec. 775.9 and revised extensively. Paragraph (a) is revised to 
    indicate that an environmental checklist can be used to support a 
    record of environmental consideration that a proposed action either was 
    categorically excluded and there were no extraordinary circumstances 
    that may cause the action to have a significant impact upon the 
    environment; or the action clearly indicates the absence of 
    environmental impacts upon the environment; or that the proposed action 
    will require the preparation of an environmental assessment.
        The use of the environmental checklist can act as an internal check 
    for the responsible official to assist in the determination that 
    environmental issues have been considered. Although NEPA
    
    [[Page 42961]]
    
    does not require the use of a checklist, the Postal Service has found 
    that the use of a checklist can serve important NEPA and non-NEPA 
    functions such as whether a permit may be necessary or further 
    investigations may be required to verify the presence of hazardous 
    substances on a property.
        The use of a mitigated FONSI is conditioned upon the implementation 
    of the identified mitigation measures that support a FONSI. When the 
    FONSI relies upon implementation of the proposed mitigation measures, 
    those mitigation measures must be funded and implemented or the FONSI 
    is not valid. Unless the identified mitigation measures are implemented 
    by the responsible official, an EIS must be prepared.
        Paragraph (b) is revised to indicate that alternatives to the 
    proposed action are to be considered as well as alternate sites for a 
    new facility. The use of alternative analysis is broader than 
    comparison of alternate sites and the revisions reflect the expansion 
    of NEPA beyond the facilities program and projects. The identification 
    of decision makers have been expanded to reflect that many persons or 
    groups have authority within the Postal Service to make a decision that 
    may impact the environment. The decision to prepare an EIS has been 
    delegated to the responsible officer with authority over that project 
    or program.
        Present Sec. 775.7 is renumbered to Sec. 775.10 and revised in 
    paragraph (a) to add a requirement that the EA contain a list of 
    applicable environmental permits necessary to complete the proposed 
    action.
        Section 775.8 is renumbered to Sec. 775.11 and revised to change 
    section references.
        Section 775.9 is renumbered to Sec. 775.12.
        Section 775.10 is renumbered to Sec. 775.13 and revised in (a)(4) 
    to correct the title of the legislative counsel.
        Section 775.11 is renumbered to Sec. 775.14 and revised to change 
    section references.
    
                               Distribution Table                           
    ------------------------------------------------------------------------
                                             New                            
              Existing section             section           Action         
    ------------------------------------------------------------------------
    775.1...............................     775.1  Revised.                
    775.2...............................     775.2  Unchanged.              
    775.3...............................     775.3  Revised.                
                                             775.4  New.                    
    775.4(a)............................     775.5  Revised.                
    775.4(b)............................     775.6  Revised.                
                                             775.7  New.                    
    775.5...............................     775.8  Unchanged.              
    775.6...............................     775.9  Revised.                
    775.7...............................    775.10  Amended.                
    775.8...............................    775.11  Amended.                
    775.9...............................    775.12  Amended.                
    775.10..............................    775.13  Amended.                
    775.11..............................    775.14  Amended.                
    ------------------------------------------------------------------------
    
        In view of the matters discussed above, although exempt from the 
    notice and comment requirements of the Administrative Procedure Act (5 
    U.S.C. 553 (b), (c)) regarding proposed rulemaking by 39 U.S.C. 410(a), 
    the Postal Service invites comments on the following proposed 
    amendments to part 775 of subchapter K and subchapter L of title 39, 
    Code of Federal Regulations.
    
    List of Subjects in 39 CFR Part 775
    
        Environmental impact statements.
    
        For the reasons set out in this document, the Postal Service 
    proposes to amend 39 CFR subchapter K, part 775, and subchapter L, 
    parts 777 and 778, as follows:
    
    SUBCHAPTER K--ENVIRONMENTAL REGULATIONS
    
    PART 775--NATIONAL ENVIRONMENTAL POLICY ACT PROCEDURES
    
        1. The authority citation for 39 CFR part 775 is revised to read as 
    follows:
    
        Authority: 39 U.S.C. 401; 42 U.S.C. 4321 et seq.; 40 CFR 1500.4.
    
        2. The heading for subchapter K is revised to read as set forth 
    above.
        3. The heading of part 775 is revised to read as set forth above.
        4. Section 775.1 is revised to read as follows:
    
    
    Sec. 775.1  Purpose.
    
        These procedures implement the National Environmental Policy Act 
    (NEPA) regulations (40 CFR part 1500) issued by the Council on 
    Environmental Quality (CEQ).
        5. Section 775.3 is revised to read as follows:
    
    
    Sec. 775.3  Responsibilities.
    
        (a) The Chief Environmental Officer is responsible for overall 
    development of policy regarding NEPA and other environmental policies. 
    The officer in charge of the facilities or real estate organization is 
    responsible for the development of NEPA policy as it affects real 
    estate or acquisition, construction and disposal of postal facilities 
    consistent with overall NEPA policy. Each officer with responsibility 
    over the proposed program, project, action, or facility is responsible 
    for compliance with NEPA as the responsible official.
        (b) Postal managers will designate environmental coordinators to 
    assist with compliance with NEPA procedures.
    
    
    Secs. 775.5 through 775.11  [Redesignated as Secs. 775.8 through 
    775.14]; Sec. 775.4(a) [Redesignated as Sec. 775.5] and Sec. 775.4(b) 
    [Redesignated as Sec. 775.6].
    
        6. Sections 775.5 through 775.11 are redesignated as Secs. 775.8 
    through 775.14 and Sec. 775.4(a) is redesignated as Sec. 775.5 and 
    Sec. 775.4(b) is redesignated as Sec. 775.6.
        7. Newly redesignated Sec. 775.5 is revised to read as follows:
    
    
    Sec. 775.5  Classes of actions.
    
        (a) Actions which normally require an environment impact statement. 
    None, however the Postal Service will prepare an EIS when necessary 
    based on the factors identified in 40 CFR 1508.27.
        (b) Actions requiring an environmental assessment.Classes of 
    actions that will require an environmental assessment unless 
    categorically excluded include:
        (1) Any project that includes the conversion, purchase, or any 
    other alteration of the fuel source for 25 percent or more of USPS 
    vehicles operating with fuel other than diesel or gasoline in any 
    carbon monoxide or ozone non-attainment area;
        (2) Any action that would adversely affect a federally listed 
    threatened or endangered species or its habitat;
        (3) Any action that would directly affect public health;
        (4) Any action that would require development within park lands, or 
    be located in close proximity to a wild or scenic river or other 
    ecologically critical area;
        (5) Any action affecting the quality of the physical environment 
    that would be scientifically highly controversial;
        (6) Any action that may have highly uncertain or unknown risks on 
    the human environment;
        (7) Any action that threatens a violation of applicable federal, 
    state, or local law or requirements imposed for the protection of the 
    environment;
        (8) New construction of a facility with vehicle maintenance or fuel 
    dispensing capabilities, whether owned or leased;
        (9) Acquisition or lease of an existing building involving new uses 
    or a change in use to a greater environmental intensity;
        (10) Real property disposal involving a known change in use to a 
    greater environmental intensity;
        (11) Postal facility function changes involving new uses of greater 
    environmental intensity;
    
    [[Page 42962]]
    
        (12) Reduction in force involving more than 1000 positions;
        (13) Relocation of 300 or more employees more than 50 miles;
        (14) Initiation of legislation.
        8. In newly redesignated Sec. 775.9, paragraphs (a)(1) through (4), 
    the first sentence in (b)(1), and paragraphs (b)(2), (b)(3), 
    introductory text, and (b)(3)(i) are revised and a new sentence is 
    added after the first sentence in paragraph (b)(1) to read as follows:
    
    
    Sec. 775.9  Environmental evaluation process.
    
        (a) All Actions--(1) Assessment of actions. An environmental 
    checklist may be used to support a record of environmental 
    consideration as the written determination that the proposed action 
    does not require an environmental assessment. An environmental 
    assessment must be prepared for each proposed action, except that an 
    assessment need not be made if a written determination is made that:
        (i) The action is one of a class listed in Sec. 775.6, Categorical 
    Exclusions, and
        (ii) The action is not affected by extraordinary circumstances 
    which may cause it to have a significant environmental effect, or
        (iii) The action is a type that is not a major federal action with 
    a significant impact upon the environment.
        (2) Findings of no significant impact. If an environmental 
    assessment indicates that there is no significant impact of a proposed 
    action on the environment, an environmental impact statement is not 
    required. A ``finding of no significant impact'' is prepared and 
    published in accordance with Sec. 775.13. When the proposed action is 
    approved, it may be accomplished without further environmental 
    consideration. A ``finding of no significant impact'' document briefly 
    presents the reasons why an action will not have a significant effect 
    on the human environment and states that an environmental impact 
    statement will not be prepared. It must refer to the environmental 
    assessment and any other environmentally pertinent documents related to 
    it. The assessment may be included in the finding if it is short, in 
    which case the discussion in the assessment need not be repeated in the 
    finding. The FONSI may be a mitigated FONSI in which case the required 
    mitigation factors should be listed in the FONSI. The use of a 
    mitigated FONSI is conditioned upon the implementation of the 
    identified mitigation measures in the EA that support the FONSI. Unless 
    the mitigation measures are implemented by the responsible official, 
    the use of an EA in lieu of an EIS is not acceptable.
        (3) Impact statement preparation decision and notices. If an 
    environmental assessment indicates that a proposed major action would 
    have a significant impact on the environment, a notice of intent to 
    prepare an impact statement is published (see Sec. 775.13) and an 
    environmental impact statement is prepared.
        (4) Role of impact statement in decision making. An environmental 
    impact statement is used, with other analyses and materials, to decide 
    which alternative should be pursued, or whether a proposed action 
    should be abandoned or other courses of action pursued. See Sec. 775.12 
    for restrictions on the timing of this decision.
    * * * * *
        (b) * * *
        (1) The environmental assessment of any action which involves the 
    construction or acquisition of a new mail processing facility must 
    include reasonable alternatives to the proposed action and not just 
    consideration of contending sites for a facility. This process must be 
    started early in the planning of the action.* * *
        (2) When an environmental assessment indicates that an 
    environmental impact statement may be needed for a proposed facility 
    action, the responsible officer will make the decision whether to 
    prepare an environmental impact statement for presentation to the 
    Capital Investment Committee, and to the Board of Governors if the 
    Board considers the proposal.
        (3) If an environmental impact statement is presented to the 
    Committee or the Board, and an analysis indicates that it would be more 
    cost-effective to proceed immediately with continued control of sites, 
    (including advance acquisition, if necessary, and where authorized by 
    postal procedures), environmental impact statement preparation, and 
    project designs, a budgetary request will include authorization of 
    funds to permit:
        (i) The preparation of an impact statement encompassing all 
    reasonable alternatives and site alternatives,
    * * * * *
        9. Newly redesignated Sec. 775.6 is revised to read as follows:
    
    
    Sec. 775.6  Categorical exclusions.
    
        (a) The classes of actions in this section are those that the 
    Postal Service has determined do not individually or cumulatively have 
    a significant impact on the human environment. A proposed action, to be 
    categorically excluded, is based upon a determination that the action 
    fits within a class listed and there are no extraordinary circumstances 
    that may affect the significance of the proposal. The action must not 
    be connected to other actions with potentially significant impacts or 
    is not related to other proposed actions with potentially significant 
    impacts. Extraordinary circumstances are those unique situations 
    presented by specific proposals, such as scientific controversy about 
    the environmental impacts of the proposal; uncertain effects or effects 
    involving unique or unknown risks.
        (b) Categorical exclusions relating to general agency actions:
        (1) Policy development, planning and implementation that relate to 
    routine activities such as personnel, organizational changes or similar 
    administrative functions.
        (2) Routine actions, including the management of programs or 
    activities necessary to support the normal conduct of agency business, 
    such as administrative, financial, operational and personnel actions 
    that involve no commitment of resources other than manpower and funding 
    allocations.
        (3) Award of contracts for technical support services, management 
    and operation of a government owned facility, and personal services.
        (4) Research activities and studies and routine data collection 
    when such actions are clearly limited in context and intensity.
        (5) Educational and informational programs and activities.
        (6) Reduction in force resulting from workload adjustments, reduced 
    personnel or funding levels, skill imbalances or other similar causes 
    that do not affect more than 1,000 positions.
        (7) Postal rate or mail classification actions, address information 
    system changes, post office name and zip code changes.
        (8) Property protection, law enforcement and other legal activities 
    undertaken by the Postal Inspection Service, the Law Department, the 
    Judicial Officer, and the Inspector General.
        (9) Activities related to trade representation and market 
    development activities abroad.
        (10) Emergency preparedness planning activities, including 
    designation of on-site evacuation routes.
        (11) Minor reassignment of motor vehicles and purchase or 
    deployment of motor vehicles to new locations that do not adversely 
    impact traffic safety, congestion or air quality.
        (12) Procurement or disposal of mail handling or transport 
    equipment.
    
    [[Page 42963]]
    
        (13) Acquisition, installation, operation, removal or disposal of 
    communication systems, computers and data processing equipment.
        (14) Postal facility function changes not involving construction, 
    where there are no substantial relocation of employees, or no 
    substantial increase in the number of motor vehicles at a facility.
        (15) Closure or consolidation of post offices under 39 U.S.C. 
    404(b).
        (16) Minor operational changes at an existing facility to minimize 
    waste generation and for reuse of materials. These changes include but 
    are not limited to, adding filtration and recycling systems to allow 
    reuse of vehicle or machine oil, setting up sorting areas to improve 
    process efficiency, and segregating waste streams previously mingled 
    and assigning new identification codes to the two resulting streams.
        (17) Actions which have an insignificant effect upon the 
    environment as established in a previously written Environmental 
    Assessment (EA) and Finding of No Significant Impact (FONSI) or 
    Environmental Impact Statement (EIS). Such repetitive actions shall be 
    considered ``reference actions'' and a record of all decisions 
    concerning these ``reference actions'' shall be maintained by the Chief 
    Environmental Officer or designee. The proposed action must be 
    essentially the same in context and the same or less in intensity or 
    create fewer impacts than the ``reference action'' previously studied 
    under an EA or EIS in order to qualify for this exclusion.
        (18) Rulemakings that are strictly procedural, and interpretations 
    and rulings with existing regulations, or modifications or rescissions 
    of such interpretations and rulings.
        (c) Categorical exclusions relating to emergency or restoration 
    actions:
        (1) Any cleanup, remediation or removal action conducted under the 
    provisions of the Comprehensive Environmental Response compensation and 
    Liability Act (CERCLA) or the Resource Conservation and Recovery Act 
    (RCRA), any asbestos abatement actions regulated under the provisions 
    of the Occupational Safety and Health Act (OSHA), or the Clean Air Act 
    or any PCB transformer replacement or any lead based paint abatement 
    actions regulated under the provisions of the Toxic Substances Control 
    Act (TSCA), OSHA or RCRA.
        (2) Testing associated with environmental cleanups or site 
    investigations.
        (d) Categorical exclusions relating to maintenance or repair 
    actions at existing facilities:
        (1) Siting, construction or operation of temporary support 
    buildings or support structures.
        (2) Routine maintenance and minor activities, such as fencing, that 
    occur in floodplains or state and local wetlands or pursuant to the 
    nationwide permitting process of the Corps of Engineers.
        (3) Routine actions normally conducted to protect and maintain 
    properties and which do not alter the configuration of the building.
        (4) Changes in configuration of buildings required to promote 
    handicapped accessibility pursuant to the Architectural Barriers Act.
        (5) Repair to, or replacement in kind or equivalent of building 
    equipment or components (e.g., electrical distribution, HVAC systems, 
    doors, windows, roofs, etc.).
        (6) Internal modifications or improvements to structures or 
    buildings to accommodate mail processing, computer, communication or 
    other similar types of equipment or other actions which do not involve 
    modification to the external walls of the facility.
        (7) Joint development and/or joint use projects that only involve 
    internal modifications to an existing facility.
        (8) Noise abatement measures, such as construction of noise 
    barriers and installation of noise control materials.
        (9) Actions which require concurrence or approval of another 
    federal agency where the action is a categorical exclusion under the 
    NEPA regulations of that federal agency.
        (e) Categorical exclusions relating to real estate actions.
        (1) Obtaining, granting, disposing, or changing of easements, 
    licenses and permits, rights-of-way and similar interests.
        (2) Extension, renewal, renegotiation, or termination of existing 
    lease agreements.
        (3) Purchase of Postal Service occupied leased property where the 
    planned postal uses do not differ significantly from the past uses of 
    the site.
        (4) Acquisition or disposal of existing facilities and real 
    property where the planned uses do not differ significantly from past 
    uses of the site.
        (5) Acquisition of real property not connected to specific facility 
    plans or when necessary to protect the interests of the Postal Service 
    in advance of final project approval. This categorical exclusion only 
    applies to the acquisition. Any subsequent use of the site for a 
    facility project must be considered under this part.
        (6) Disposal through sale or outlease of unimproved real property.
        (7) Disposal through sale, outlease, transfer or exchange of real 
    property to other federal or state agencies.
        (8) Acquisition and disposal through sale, lease, transfer or 
    exchange of real property that does not involve an increase in volumes, 
    concentrations, or discharge rates of wastes, air emissions, or water 
    effluents, and that under reasonably foreseeable uses, have generally 
    similar environmental impacts as compared to those before the 
    acquisition or disposal. A determination that the proposed action is 
    categorically excluded can be based upon previous ``reference actions'' 
    documented under Sec. 775.5(b)(17).
        (9) Acquisition and disposal through sale, lease, transfer, 
    reservation or exchange of real property for nature and habitat 
    preservation, conservation, a park or wildlife management.
        (10) New construction, Postal Service owned or leased, or joint 
    development and joint use projects, of any facility unless the proposed 
    action is listed as requiring an EA in Sec. 775.5.
        (11) Expansion or improvement of an existing facility where the 
    expansion is within the boundaries of the site or occurs in a 
    previously developed area unless the proposed action is listed as 
    requiring an EA in Sec. 775.5.
        (12) Construction and disturbance pursuant to a nationwide permit 
    issued by the Corps of Engineers.
        (13) Any activity in floodplains being regulated pursuant to 
    Sec. 776 and is not listed as requiring an EA in Sec. 775.5.
        10. Section 775.4 is removed, and a new Sec. 775.4 is added to read 
    as follows:
    
    
    Sec. 775.4  Definitions.
    
        (a) The definitions set forth in 40 CFR part 1508 apply to this 
    part 775.
        (b) In addition to the terms defined in 40 CFR part 1508, the 
    following definitions apply to this part:
        Approving official means the person or group of persons, who 
    authorizes funding as established through the delegations of approval 
    authority issued by the finance organization. That person or group of 
    persons may not have proposed the action for which financial approval 
    is sought.
        Environmental checklist means a Postal Service form that identifies 
    potential environmental impacts for proposed actions initiated by 
    postal managers.
        Mitigated FONSI means a FONSI which requires the implementation of 
    specified mitigation measures in order to ensure that there are no 
    significant impacts to the environment.
    
    [[Page 42964]]
    
        Record of environmental consideration means the Postal Service form 
    that identifies the Postal Service's review of proposed activities 
    under NEPA.
        Responsible official means the person, or designated 
    representative, who proposes an action and is responsible for 
    compliance with NEPA. For larger projects, that person may not have the 
    financial authority to approve such action. The responsible official 
    signs the NEPA documents (FONSI, ROD) and the REC.
        11. In newly redesignated Sec. 775.10, paragraph (a)(4) is added to 
    read as follows:
    
    
    Sec. 775.10  Environmental assessments.
    
        (a) * * *
        (4) A list of applicable environmental permits necessary to 
    complete the proposed action.
    * * * * *
        12. A new Sec. 775.7 is added.
    
    
    Sec. 775.7  Planning and early coordination.
    
        Early planning and coordination among postal functional groups is 
    required to properly consider environmental issues that may be 
    attributable to the proposed action. Operational and facility personnel 
    must cooperate in the early concept stages of a program or project. If 
    it determined that more than one postal organization will be involved 
    in any action, a lead organization will be selected to complete the 
    NEPA process before any NEPA documents are prepared. If it is 
    determined that a project has both real estate and non-real estate 
    actions, the facilities functional organization will take the lead.
        13. Newly redesignated Sec. 775.11 is amended by revising the last 
    sentence of paragraph (a)(1) and by revising paragraphs (b)(2)(ii), 
    (c)(2), (c)(4), (c)(5) introductory text, (c)(5)(iv), and (d)(1) to 
    read as follows:
    
    
    Sec. 775.11  Environmental impact statements.
    
        (a) * * *
        (1) * * * Notice is given in accordance with Sec. 775.13.
        (b) * * *
        (2) * * *
        (ii) Contain discussions of impacts in proportion to their 
    significance. Insignificant impacts eliminated during the process under 
    Sec. 775.11(a) to determine the scope of issues must be discussed only 
    to the extent necessary to state why they will not be significant.
    * * * * *
        (c) * * *
        (2) Summary. The section should compare and summarize the findings 
    of the analyses of the affected environment, the environmental impacts, 
    the environmental consequences, the alternatives, and the mitigation 
    measures. The summary should sharply define the issues and provide a 
    clear basis for choosing alternatives.
        (3) * * *
        (4) Proposed action. This section should clearly outline the need 
    for the EIS and the purpose and description of the proposed action. The 
    entire action should be discussed, including connected and similar 
    actions. A clear discussion of the action will assist in consideration 
    of the alternatives.
        (5) Alternatives and mitigation. This portion of the environmental 
    impact statement is vitally important. Based on the analysis in the 
    Affected Environment and Environmental Consequences section (see 
    Sec. 775.11(c)(6)), the environmental impacts and the alternatives are 
    presented in comparative form, thus sharply defining the issues and 
    providing a clear basis for choosing alternatives. Those preparing the 
    statement must:
    * * * * *
        (iv) Describe appropriate mitigation measures not considered to be 
    an integral part of the proposed action or alternatives. See 
    Sec. 775.9(a)(7).
    * * * * *
        (d) * * *
        (1) Any completed draft environmental impact statement which is 
    made the subject of a public hearing, must be made available to the 
    public as provided in Sec. 775.13, of this chapter at least 15 days in 
    advance of the hearing.
    * * * * *
        14. In newly redesignated Sec. 775.12, the heading is revised to 
    read as follows:
    
    
    Sec. 775.12  Time frames for environmental impact statement actions.
    
    * * * * *
        15. In newly redesignated Sec. 775.13, paragraph (a)(4) is revised 
    to read as follows:
    
    
    Sec. 775.13  Public notice and information.
    
        (a)* * *
        (4) A copy of every notice of intent to prepare an environmental 
    impact statement must be furnished to the Chief Counsel, Legislative, 
    Law Department, who will have it published in the Federal Register.
    * * * * *
        16. In newly redesignated Sec. 775.14, paragraph (b) is revised to 
    read as follows:
    
    
    Sec. 775.14  Hearings.
    
    * * * * *
        (b) The distribution and notice requirements of Sec. 775.11(d)(1) 
    and 775.13 must be complied with whenever a hearing is to be held.
        17. A heading for Subchapter L is added to read as follows:
    
    Subchapter L--Special Regulations
    
        18. Parts 777 and 778 are redesignated from Subchapter K to 
    Subchapter L.
    
    PARTS 777 AND 778--[REDESIGNATED TO SUBCHAPTER L]
    
    Stanley F. Mires,
    Chief Counsel, Legislative.
    [FR Doc. 97-20737 Filed 8-8-97; 8:45 am]
    BILLING CODE 7710-12-P
    
    
    

Document Information

Published:
08/11/1997
Department:
Postal Service
Entry Type:
Proposed Rule
Action:
Proposed rule.
Document Number:
97-20737
Dates:
Comments must be received by September 10, 1997.
Pages:
42958-42964 (7 pages)
PDF File:
97-20737.pdf
CFR: (21)
39 CFR 775.9(a)(7)
39 CFR 775.11(a)
39 CFR 775.4(b)(7))
39 CFR 775.4(b)
39 CFR 775.11(c)(6))
More ...