98-21446. Northern Border Pipeline Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 63, Number 154 (Tuesday, August 11, 1998)]
    [Notices]
    [Pages 42838-42839]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-21446]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP98-692-000]
    
    
    Northern Border Pipeline Company; Notice of Request Under Blanket 
    Authorization
    
    August 6, 1998.
        Take notice that on July 24, 1998, Northern Border Pipeline Company 
    (Northern Border), 1111 South 103rd Street, Omaha, Nebraska 68124-1000 
    filed in Docket No. CP98-692-000 a request pursuant to Sections 157.205 
    and 157.212 of the Commission's Regulations under the Natural Gas Act 
    (18 CFR 157.205, 157.212) for authorization to operate an existing 
    valve setting and to construct and operate certain measurement 
    facilities as a new delivery point (Tyler delivery point) to the town 
    of Tyler, Minnesota under Northern Border's blanket certificate issued 
    in Docket No. CP84-420-000 pursuant to Section 7 of the natural Gas 
    Act, all as more fully set forth in the request that is on file with 
    the Commission and open to public inspection.
        Specifically, Northern Border requests authorization to operate an 
    existing 4-inch valve setting and to construct and operate a single 2-
    inch rotary meter and associated piping, RTU, and meter building to 
    serve as a delivery point to the town of Tyler, Minnesota. The 
    estimated cost of the proposed facilities is $220,000. Northern Border 
    will be reimbursed for all costs incurred for constructing the proposed 
    delivery point.
        The natural gas volumes to be delivered at the proposed delivery 
    point are volumes currently being transported by Northern Border. 
    Northern Border will deliver to the town of Tyler up to 700 Mcf on a 
    peak day and an estimated 110,000 Mcf annually. The natural gas volumes 
    delivered at the Tyler delivery point will be used to serve the town of 
    Tyler, Minnesota. There will not be any impact on the peak day 
    capability of Northern Border's existing shippers as a result of the 
    proposed interconnect and
    
    [[Page 42839]]
    
    any impact on annual deliveries will be de minimis.
        Northern Border further states that the proposed change is not 
    prohibited by Northern Border's existing tariff. Northern Border 
    asserts that it has sufficient capacity in its system to accomplish 
    delivery of gas to the proposed delivery point without detriment or 
    disadvantage to any other customer.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    David P. Boergers,
    Secretary.
    [FR Doc. 98-21446 Filed 8-10-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
08/11/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-21446
Pages:
42838-42839 (2 pages)
Docket Numbers:
Docket No. CP98-692-000
PDF File:
98-21446.pdf