[Federal Register Volume 64, Number 154 (Wednesday, August 11, 1999)]
[Notices]
[Pages 43695-43697]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-20759]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP99-576-000]
Williams Gas Pipelines Central, Inc.; Notice of Intent To Prepare
an Environmental Assessment for the Proposed Empire District Electric
Company State Line Plant Project and Request for Comments on
Environmental Issues
August 5, 1999.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Empire District Electric
Company State Line Plant (Empire) Project involving construction and
operation of facilities by Williams Gas Pipelines Central, Inc.
(Williams) in Kay, Osage, and Washington Counties, Oklahoma; Labette
and Cherokee Counties, Kansas; and Jasper County, Missouri.\1\ These
facilities would require the replacement of various minor facilities
along about 84.3 miles of its Blackwell-Cotton
[[Page 43696]]
Valley pipeline (Blackwell-Cotton Uprate); the installation of about
36.8 miles of pipeline loop (Southern Trunk Loop); and the construction
of measurement facilities at the Empire Electric Power Plant (Empire
Facilities). This EA will be used by the Commission in its decision-
making process to determine whether the project is in the public
convenience and necessity.
---------------------------------------------------------------------------
\1\ Williams' application was filed with the Commission under
Section 7 of the Natural Gas Act and Part 157 of the Commission's
regulations.
---------------------------------------------------------------------------
If you are a landowner receiving this notice, you may be contacted
by a pipeline company representative about the acquisition of an
easement to construct, operate, and maintain the proposed facilities.
The pipeline company would seek to negotiate a mutually acceptable
agreement. However, if the project is approved by the Commission, that
approval conveys with it the right of eminent domain. Therefore, if
easement negotiations fail to produce an agreement, the pipeline
company could initiate condemnation proceedings in accordance with
state law. A fact sheet addressing a number of typically asked
questions, including the use of eminent domain, is attached to this
notice as appendix 1.\2\
---------------------------------------------------------------------------
\2\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies are available from the
Commission's Public Reference and Files Maintenance Branch, 888
First Street, NE., Washington, DC 20426, or call (202) 208-1371.
Copies of the appendices were sent to all those receiving this
notice in the mail.
---------------------------------------------------------------------------
Summary of the Proposed Project
Williams wants to expand the capacity of its facilities in
Oklahoma, Kansas, and Missouri to transport an additional 55,000
decatherms per day of natural gas to Empire District Electric Company's
(Empire) State Line Plant. (This would result in a total of 83,800
decatherms per day of natural gas to the State Line Plant.) Williams
seeks authority to:
Reclaim three mainline valves and two mainline drips,
replace fine mainline valves and one mainline drip, replace 11 road
crossings, and install a 16-inch-diameter pig launcher and appurtenant
piping along the existing 16-inch-diameter, 85-mile-long Blackwell-
Cotton Valley pipeline in Kay, Osage, and Washington Counties,
Oklahoma;
Upgrade 14 domestic meters, which would include upgrading/
replacing regulators and valves as needed, along with Blackwell-Cotton
Valley pipeline in Kay, Osage, and Washington Counties, Oklahoma;
Increase the maximum allowable pressure along the
Blackwell-Cotton Valley pipeline from 500 psig to 690 psig in Kay,
Osage, and Washington Counties, Oklahoma;
Extend the existing 20-inch-diameter Southern Trunk Loop
an additional 36.8 miles in Labette and Cherokee Counties, Kansas;
Relocate the existing 20-inch-diameter pig receiver to the
end of the 36.8-mile Southern Trunk Loop and install two mainline
valves in Cherokee County, Kansas;
Install a dual 6-inch regulator setting, a dual 8-inch
turbine meter setting, an 8-inch flow control setting, and about 450
feet of 16-inch-diameter pipeline at a new location within the existing
Empire property area in Jasper County, Missouri; and
Install a 4-inch flow control setting at Empire's existing
site in Jasper County, Missouri.
The general location of the project facilities as well as a
detailed version of the Southern Trunk Loop are shown in appendix 2.
Land Requirements for Construction
Construction of the proposed Blackwell-Cotton Uprate, Southern
Trunk Loop, and Empire Facilities would require a total construction
area of about 3.5, 401.5, and 1.2 acres of land respectively. The
Blackwell-Cotton Uprate and the Southern Trunk Loop have no aboveground
facilities associated with them. Construction of the Blackwell-Cotton
Uprate would temporarily effect 3.5 acres. No new right-of-way would be
created. Construction of the Southern Trunk Loop would disturb about
401.5 acres. Of this, only about 111.5 acres would convert to permanent
right-of-way. Following construction, about 0.9 acre of the Empire
Facilities would be maintained as new aboveground facility sites. The
remaining 0.35 acre of the Empire Facilities land would be restored and
allowed to revert to its former use.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
to discover and address concerns the public may have about proposals.
We call this ``scoping''. The main goal of the scoping process is to
focus the analysis in the EA on the important environmental issues. By
this Notice of Intent, the Commission requests public comments on the
scope of the issues it will address in the EA. All comments received
are considered during the preparation of the EA. State and local
government representatives are encouraged to notify their constituents
of this proposed action and encourage them to comment on their areas of
concern.
The EA will discuss impacts that could occur as a result of the
construction and operation of the proposed project under these general
headings:
Geology and soils
Water resources, fisheries, and wetlands
Vegetation and wildlife
Endangered and threatened species
Public safety
Land use
Cultural resources
Air quality and noise
Hazardous waste
We will also evaluate possible alternatives to the proposed or
portions of the project, and make recommendations on how to lessen or
avoid impacts on the various resource areas.
Our independent analysis of the issues will be in the EA. Depending
on the comments received during the scoping process, the EA may be
published and mailed to Federal, state, and local agencies, public
interest groups, interested individuals, affected landowners,
newspapers, libraries, and the Commission's official service list for
this proceeding. A comment period will be allotted for review if the EA
is published. We will consider all comments on the EA before we make
our recommendations to the Commission.
To ensure your comments are considered, please carefully follow the
instructions in the public participation section beginning on page 5.
Currently Identified Environmental Issues
We have already identified several issues that we think deserve
attention based on a preliminary review of the proposed facilities and
the environmental information provided by Williams. This preliminary
list of issues may be changed based on your comments and our analysis.
Five streams would be crossed (using either horizontal
directional drill or horizontal boring methods) by the Southern Trunk
Loop; and
One federally listed species may be present in the Neosho
River. Among the five streams to be crossed, the Neosho River is
designated as critical habitat for the federally threatened Neosho
madtom.
[[Page 43697]]
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. By becoming a commentor, your
concerns will be addressed in the EA and considered by the Commission.
You should focus on the potential environmental effects of the
proposal, alternatives to the proposal (including alternative
locations/routes), and measures to avoid or lessen environmental
impact. The more specific your comments, the more useful they will be.
Please carefully follow these instructions to ensure that your comments
are received in time and properly recorded:
Send two copies of your letter to: David P. Boergers,
Secretary, Federal Energy Regulatory Commission, 888 First St., NE.,
Room 1A, Washington, DC 20426;
Lable one copy of the comments for the attention of the
Environmental Review and Compliance Branch, PR-11.1;
Reference Docket No. CP99-576-000; and
Mail your comments so that they will be received in
Washington, DC on or before September 7, 1999.
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an official party to the proceeding know as an
``intervenor''. Intervenors play a more formal role in the process.
Among other things, intervenros have the fight to receive copies of
case-related Commission documents and filings by other intervenors.
Likewise, each intervenor must provide 14 copies of its filings to the
Secretary of the Commission and must send a copy of its filings to all
other parties on the Commission's service list for this proceeding. If
you want to become an intervenor you must file a motion to intervene
according to Rule 214 of the Commission's Rules of Practice and
Procedures (18 CFR 385.214) (see appendix 3). Only intervenors have the
right to seek rehearing of the Commission's decision.
You do not need intervenor status to have your environmental
comments considered. Additional information about the proposed project
is available from Mr. Paul McKee of the Commission's Office of External
Affairs at (202) 208-1088 or on the FERC website (www.ferc.fed.us)
using the ``RIMS'' link to information in this docket number. Click on
the ``RIMS'' links, select ``Docket #'' from the RIMS Menu, and follow
the instructions. For assistance with access to RIMS, the RIMS helpline
can be reached at (202) 208-2222.
Similarly, the ``CIPS'' link on the FERC Internet website provides
access to the texts of formal documents issued by the Commission, such
as orders, notices, and rulemakings. From the FERC Internet website,
click on the ``CIPS'' link, select ``Docket #'' from the CIPS menu, and
follow the instructions. For assistance with access to CIPS, the CIPS
helpline can be reached at (202) 208-2474.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 99-20759 Filed 8-10-99; 8:45 am]
BILLING CODE 6717-01-M