E8-18471. Alabama Power Company; Notice of Intent To File License Application, Filing of Pre-Application Document, Commencement of Licensing Proceeding, and Scoping; Request for Comments on the PAD and Scoping Document, and Identification of Issues ...  

  • Start Preamble August 5, 2008.

    a. Type of Filing: Notice of Intent to File License Application for a New License and Commencing Licensing Proceeding.

    b. Project No.: 349-150.

    c. Dated Filed: June 5, 2008.

    d. Submitted by: Alabama Power Company.

    e. Name of Project: Martin Dam Hydroelectric.

    f. Location: On the Tallapoosa River, in Tallapoosa, Coosa, and Elmore counties. The project does not occupy federal lands.

    g. Filed Pursuant to: 18 CFR part 5 of the Commission's Regulations.

    h. Potential Applicant Contact: Mr. Jerry L. Stewart, Senior Vice President, Alabama Power Company, 600 North 18th Street, P.O. Box 2641, Birmingham, AL 35291. Tel. (205) 257-6227.

    i. FERC Contact: Lee Emery at (202) 502-8379 or e-mail at lee.emery@ferc.gov.

    j. We are asking federal, state, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues to cooperate with us in the preparation of the environmental document. Agencies who would like to request cooperating status should follow the instructions for filing comments described in paragraph o below. Cooperating agencies should note the Commission's policy that agencies that cooperate in the preparation of the environmental document cannot also intervene. See, 94 FERC ¶ 61,076 (2001).

    k. With this notice, we are initiating informal consultation with: (a) The U.S. Fish and Wildlife Service and/or NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR part 402 and (b) the State Historic Preservation Officer, as required by section 106, National Historical Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2.

    l. With this notice, we are designating Alabama Power Company as the Commission's non-federal representative for carrying out informal consultation, pursuant to section 7 of the Endangered Species Act and section 106 of the National Historic Preservation Act.

    m. Alabama Power Company filed a Pre-Application Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission's regulations.

    n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site (http://www.ferc.gov), using the “eLibrary” link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659. A copy is also available for inspection and reproduction at the address in paragraph h.

    Register online at http://ferc.gov/​esubscribenow.htm to be notified via e-mail of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support.

    o. With this notice, we are soliciting comments on the PAD and Scoping Document 1 (SD1), as well as study requests. All comments on the PAD and SD1, and study requests should be sent to the address above in paragraph h. In addition, all comments on the PAD and SD1, study requests, requests for cooperating agency status, and all communications to and from Commission staff related to the merits of the potential application (original and eight copies) must be filed with the Commission at the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. All filings with the Commission must include on the first page, the project name (Martin Dam Hydroelectric Project) and number (P-349-150), and bear the heading “Comments on Pre-Application Document,” “Study Requests,” “Comments on Scoping Document 1,” “Request for Cooperating Agency Status,” or “Communications to and from Commission Staff.” Any individual or entity interested in submitting study requests, commenting on the PAD or SD1, and any agency requesting cooperating status must do so by October 3, 2008.

    Comments on the PAD and SD1, study requests, requests for cooperating agency status, and other permissible forms of communications with the Commission may be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site (http://www.ferc.gov) under the “e-filing” link.

    p. Although our current intent is to prepare an environmental assessment (EA), there is the possibility that an Environmental Impact Statement (EIS) will be required. Nevertheless, this meeting will satisfy the NEPA scoping requirements, irrespective of whether an EA or EIS is issued by the Commission. Start Printed Page 46610

    Scoping Meetings

    Commission staff will hold two scoping meetings in the vicinity of the project at the time and place noted below. The daytime meeting will focus on resource agency, Indian tribes, and non-governmental organization concerns, while the evening meeting is primarily for receiving input from the public. We invite all interested individuals, organizations, and agencies to attend one or both of the meetings, and to assist staff in identifying particular study needs, as well as the scope of environmental issues to be addressed in the environmental document. The times and locations of these meetings are as follows:

    Daytime Scoping Meeting

    Date: Thursday, September 11, 2008.

    Time: 9 a.m. to 12 noon (CST).

    Location: Central Alabama Community College, Betty Carol Graham Center at Alexander City Campus, 1675 Cherokee Road, Alexander City, AL 35010.

    Phone: (205) 257-2211.

    Evening Scoping Meeting

    Date: Thursday, September 11, 2008.

    Time: 6 p.m. to 8 p.m. (CST).

    Location: Central Alabama Community College, Betty Carol Graham Center at Alexander City Campus, 1675 Cherokee Road, Alexander City, AL 35010.

    Phone: (205) 257-2211.

    Scoping Document 1 (SD1), which outlines the subject areas to be addressed in the environmental document, was mailed to the individuals and entities on the Commission's mailing list. Copies of SD1 will be available at the scoping meetings, or may be viewed on the Web at http://www.ferc.gov, using the “eLibrary” link. Follow the directions for accessing information in paragraph n. Based on all oral and written comments, a Scoping Document 2 (SD2) may be issued. SD2 may include a revised process plan and schedule, as well as a list of issues, identified through the scoping process.

    Site Visit

    The potential applicant and Commission staff will conduct a site visit of the project on Wednesday, September 10, 2008, starting at 9 a.m. (CST). All participants should meet at the parking lot for the Martin Dam powerhouse, located at 675 Overlook Drive, Dadeville, AL 36853. All participants are responsible for their own transportation to the powerhouse site. Anyone with questions about the site visit should contact Viki Pate, Alabama Power Company at (205) 257-2211 on or before September 3, 2008.

    Meeting Objectives

    At the scoping meetings, staff will: (1) Initiate scoping of the issues; (2) review and discuss existing conditions and resource management objectives; (3) review and discuss existing information and identify preliminary information and study needs; (4) review and discuss the process plan and schedule for pre-filing activity that incorporates the time frames provided for in Part 5 of the Commission's regulations and, to the extent possible, maximizes coordination of federal, state, and tribal permitting and certification processes; and (5) discuss the appropriateness of any federal or state agency or Indian tribe acting as a cooperating agency for development of an environmental document.

    Meeting participants should come prepared to discuss their issues and/or concerns. Please review the PAD in preparation for the scoping meetings. Directions on how to obtain a copy of the PAD and SD1 are included in item n. of this document.

    Meeting Procedures

    The meetings will be recorded by a stenographer and will become part of the formal record of the Commission proceeding on the project.

    Start Signature

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. E8-18471 Filed 8-8-08; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Comments Received:
0 Comments
Published:
08/11/2008
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
E8-18471
Dates:
Thursday, September 11, 2008.
Pages:
46609-46610 (2 pages)
Docket Numbers:
Project No. 349-150
EOCitation:
of 2008-08-05
PDF File:
e8-18471.pdf