96-20404-Filed. Texas Eastern Transmission Corporation; Notice of Compliance Filing  

  • [Federal Register Volume 61, Number 156 (Monday, August 12, 1996)]
    [Notices]
    [Pages 41782-41783]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-20404-Filed]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. RP96-279-001]
    
    
    Texas Eastern Transmission Corporation; Notice of Compliance 
    Filing
    
    August 6, 1996.
        Take notice that on August 1, 1996, Texas Eastern Transmission 
    Corporation (Texas Eastern) tendered for filing
    
    [[Page 41783]]
    
    detailed information showing how Texas Eastern developed the compressor 
    fuel projections contained in its Interim ASA filing of June 18, 1996 
    in Docket No. RP96-279-000.
        Texas Eastern asserts that the purpose of this filing is to comply 
    with the Commission's order issued July 17, 1996 in Docket No., RP96-
    279-000.
        Texas Eastern states that the compressor fuel projections were 
    developed by using a linear regression analysis model designed to 
    forecast compressor fuel consumption for Texas Eastern's system. Texas 
    Eastern also states that the ultimate test of a projection model is the 
    comparison of the projections developed to the actual results 
    experienced and that the month of June 1996 actual compressor fuel has 
    already proven to be within 3% tolerance of its projection.
        Texas Eastern states that copies of the filing were served on all 
    parties in Docket No. RP96-279-000. The July 17, Order provides that 
    parties are permitted to file comments within 15 days of the filing.
        Any person desiring to protest said filing should file a protest 
    with the Federal Energy Regulatory Commission, 888 First Street, N.E., 
    Washington, D.C. 20426, in accordance with 18 CFR 385.214 of the 
    Commission's Rules and Regulations. All such protests must be filed as 
    provided in Section 154.210 of the Commission's Regulations. Protests 
    will be considered by the Commission in determining appropriate action 
    to be taken, but will not serve to make protestants parties to the 
    proceeding. Copies of this filing are on file with the Commission and 
    are available for public inspection in the Public Reference Room.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 96-20404-Filed 8-9-96; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
08/12/1996
Department:
Energy Department
Entry Type:
Notice
Document Number:
96-20404-Filed
Pages:
41782-41783 (2 pages)
Docket Numbers:
Docket No. RP96-279-001
PDF File:
96-20404-filed.pdf