2014-18865. Drawbridge Operation Regulation; Gulf Intracoastal Waterway, St. Petersburg Beach, FL  

  • Start Preamble

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Final rule.

    SUMMARY:

    The Coast Guard is removing the existing drawbridge operation regulation for the Pinellas Bayway Structure “C” Bridge across the Gulf Intracoastal Waterway mile 114, St Petersburg Beach, Florida. The drawbridge was replaced with a fixed bridge in 2014 and the operating regulation is no longer applicable or necessary.

    DATES:

    This rule is effective August 12, 2014.

    ADDRESSES:

    The docket for this final rule, [USCG-2014-0437] is available at http://www.regulations.gov. Type the docket number in the “SEARCH” box and click “SEARCH.” Click on Open Docket Folder on the line associated with this final rule. You may also visit the Docket Management Facility in Room W12-140 on the ground floor of the Department of Transportation West Building, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    If you have questions on this rule, call or email Mr. Gene Stratton, Coast Guard; telephone 305-415-6744, email allen.e.stratton@uscg.mil. If you have questions on viewing the docket, call Cheryl Collins, Program Manager, Docket Operations, telephone 202-366-9826.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    A. Regulatory History and Information

    The Coast Guard is issuing this final rule without prior notice and opportunity to comment pursuant to authority under section 4(a) of the Administrative Procedure Act (APA) (5 U.S.C. 553(b)). This provision authorizes an agency to issue a rule without prior notice and opportunity to comment when the agency for good cause finds that those procedures are “impracticable, unnecessary, or contrary to the public interest.” Under 5 U.S.C. 553(b), the Coast Guard finds that good cause exists for not publishing a notice of proposed rulemaking (NPRM) with respect to this rule because the Pinellas Bayway Structure “C” Bridge, that once required draw operations in 33 CFR 117.287(e), was removed from Gulf Intracoastal Waterway mile 114.0 and replaced with a fixed bridge in 2014. Therefore, the regulation is no longer applicable and shall be removed from publication. It is unnecessary to publish an NPRM because this regulatory action does not purport to place any restrictions on mariners but rather removes a restriction that has no further use or value.

    Under 5 U.S.C. 553(d)(3), the Coast Guard finds that good cause exists for making this rule effective in less than 30 days after publication in the Federal Register. The bridge has been a fixed bridge for 1 year and this rule merely requires an administrative change, in order to omit a regulatory requirement that is no longer applicable or necessary. The modification has already taken place and the removal of the regulation will not affect mariners currently operating on this waterway. Therefore, a delayed effective date is unnecessary.

    B. Basis and Purpose

    The Pinellas Bayway Structure “C” Bridge across the Gulf Intracoastal Waterway mile 114.0 was removed and replaced with a fixed bridge in 2014. It has come to the attention of the Coast Guard that the governing regulation for this drawbridge was never removed subsequent to the completion of the fixed bridge that replaced it. The elimination of this drawbridge necessitates the removal of the drawbridge operation regulation, 33 CFR 117.287(e), that pertains to the former drawbridge.

    The purpose of this rule is to remove paragraph (e) of 33 CFR 117.287 that refers to the Pinellas Bayway Structure “C” Bridge at mile 114.0, from the Code of Federal Regulations since it governs a bridge that is no longer able to be opened.

    C. Discussion of Rule

    The Coast Guard is changing the regulation in 33 CFR 117.287(e) by removing restrictions and the regulatory burden related to the draw operations for this bridge that is no longer in existence [is no longer a drawbridge]. The change removes the paragraph (e) of the regulation governing the Pinellas Bayway Structure “C” Bridge since the bridge has been replaced with a fixed bridge and the old bascule bridge was removed from the waterway. This Final Rule seeks to update the Code of Federal Regulations by removing language that governs the operation of the Pinellas Bayway Structure “C” Bridge, which no longer operates as a drawbridge. This change does not affect waterway or land traffic. This change does not affect nor does it alter the operating schedules in 33 CFR 117.287 that govern the remaining active drawbridges on the Gulf Intracoastal Waterway.

    D. Regulatory Analyses

    We developed this rule after considering numerous statutes and Start Printed Page 47003executive orders related to rulemaking. Below we summarize our analyses based on these statutes or executive orders.

    1. Regulatory Planning and Review

    This rule is not a significant regulatory action under section 3(f) of Executive Order 12866, Regulatory Planning and Review, as supplemented by Executive Order 13563, Improving Regulation and Regulatory Review, and does not require an assessment of potential costs and benefits under section 6(a)(3) of Order 12866 or under section 1 of Executive Order 13563. The Office of Management and Budget has not reviewed it under those Orders.

    The Coast Guard does not consider this rule to be “significant” under that Order because it is an administrative change and does not affect the way vessels operate on the waterway.

    2. Impact on Small Entities

    The Regulatory Flexibility Act of 1980 (RFA), 5 U.S.C. 601-612, as amended, requires federal agencies to consider the potential impact of regulations on small entities during rulemaking. The term “small entities” comprises small businesses, not-for-profit organizations that are independently owned and operated and are not dominant in their fields, and governmental jurisdictions with populations of less than 50,000. The Coast Guard certifies under 5 U.S.C. 605(b) that this rule will not have a significant economic impact on a substantial number of small entities.

    This rule will have no effect on small entities since this drawbridge has been removed and replaced with a fixed bridge and the regulation governing draw operations for this bridge is no longer applicable. There is no new restriction or regulation being imposed by this rule; therefore, the Coast Guard certifies under 5 U.S.C. 605(b) that this final rule will not have a significant economic impact on a substantial number of small entities

    3. Collection of Information

    This rule calls for no new collection of information under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520).

    4. Federalism

    A rule has implications for federalism under Executive Order 13132, Federalism, if it has a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government. We have analyzed this rule under that Order and have determined that it does not have implications for federalism.

    5. Protest Activities

    The Coast Guard respects the First Amendment rights of protesters. Protesters are asked to contact the person listed in the FOR FURTHER INFORMATION CONTACT section to coordinate protest activities so that your message can be received without jeopardizing the safety or security of people, places or vessels.

    6. Unfunded Mandates Reform Act

    The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) requires Federal agencies to assess the effects of their discretionary regulatory actions. In particular, the Act addresses actions that may result in the expenditure by a State, local, or tribal government, in the aggregate, or by the private sector of $100,000,000 (adjusted for inflation) or more in any one year. Though this rule will not result in such an expenditure, we do discuss the effects of this rule elsewhere in this preamble.

    7. Taking of Private Property

    This rule will not cause a taking of private property or otherwise have taking implications under Executive Order 12630, Governmental Actions and Interference with Constitutionally Protected Property Rights.

    8. Civil Justice Reform

    This rule meets applicable standards in sections 3(a) and 3(b)(2) of Executive Order 12988, Civil Justice Reform, to minimize litigation, eliminate ambiguity, and reduce burden.

    9. Protection of Children

    We have analyzed this rule under Executive Order 13045, Protection of Children from Environmental Health Risks and Safety Risks. This rule is not an economically significant rule and does not create an environmental risk to health or risk to safety that might disproportionately affect children.

    10. Indian Tribal Governments

    This rule does not have tribal implications under Executive Order 13175, Consultation and Coordination with Indian Tribal Governments, because it does not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes.

    11. Energy Effects

    This action is not a “significant energy action” under Executive Order 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use.

    12. Technical Standards

    This rule does not use technical standards. Therefore, we did not consider the use of voluntary consensus standards.

    13. Environment

    We have analyzed this rule under Department of Homeland Security Management Directive 023-01 and Commandant Instruction M16475.lD, which guides the Coast Guard in complying with the National Environmental Policy Act of 1969 (NEPA) (42 U.S.C. 4321-4370f), and have concluded that this action is one of a category of actions that do not individually or cumulatively have a significant effect on the human environment. This rule simply removes the operating regulations or procedures for a fixed bridge. This rule is categorically excluded, under figure 2-1, paragraph (32)(e), of the Instruction.

    Under figure 2-1, paragraph (32)(e), of the Instruction, an environmental analysis checklist and a categorical exclusion determination are not required for this rule.

    Start List of Subjects

    List of Subjects in 33 CFR Part 117

    • Bridges
    End List of Subjects

    For the reasons discussed in the preamble, the Coast Guard amends 33 CFR part 117 as follows:

    Start Part

    PART 117—DRAWBRIDGE OPERATION REGULATIONS

    End Part Start Amendment Part

    1. The authority citation for part 117 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 33 U.S.C. 499; 33 CFR 1.05-1; Department of Homeland Security Delegation No. 0170.1.

    End Authority
    [Amended]
    Start Amendment Part

    2. In § 117.287, remove and reserve paragraph (e).

    End Amendment Part Start Signature

    Dated: June 18, 2014.

    J.H. Korn,

    Rear Admiral, U.S. Coast Guard, Commander, Seventh Coast Guard District.

    End Signature End Supplemental Information

    [FR Doc. 2014-18865 Filed 8-11-14; 8:45 am]

    BILLING CODE 9110-04-P

Document Information

Effective Date:
8/12/2014
Published:
08/12/2014
Department:
Coast Guard
Entry Type:
Rule
Action:
Final rule.
Document Number:
2014-18865
Dates:
This rule is effective August 12, 2014.
Pages:
47002-47003 (2 pages)
Docket Numbers:
Docket No. USCG-2014-0437
RINs:
1625-AA09: Drawbridge Regulations
RIN Links:
https://www.federalregister.gov/regulations/1625-AA09/drawbridge-regulations
Topics:
Bridges
PDF File:
2014-18865.pdf
CFR: (1)
33 CFR 117.287