2015-19815. Safety Zone; TriMet Tilikum Crossing Bridge Fireworks Display, Willamette River, Portland, OR  

  • Start Preamble Start Printed Page 48252

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Temporary final rule.

    SUMMARY:

    The Coast Guard is establishing a temporary safety zone on the Willamette River in the vicinity of the TriMet Tilikum Crossing Bridge in Portland, OR. This safety zone is necessary to help ensure the safety of the maritime public during a fireworks display and will do so by prohibiting unauthorized persons and vessels from entering the safety zones unless authorized by the Sector Columbia River Captain of the Port or his designated representatives.

    DATES:

    This rule is effective from 8:30 p.m. until 9:30 p.m. on August 22, 2015.

    ADDRESSES:

    Documents mentioned in this preamble are part of docket [USCG-2015-0510]. To view documents mentioned in this preamble as being available in the docket, go to http://www.regulations.gov,, type the docket number in the “SEARCH” box and click “SEARCH.” Click on Open Docket Folder on the line associated with this rulemaking. You may also visit the Docket Management Facility in Room W12-140 on the ground floor of the Department of Transportation West Building, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    If you have questions on this rule, call or email Ken Lawrenson, Waterways Management Division, Marine Safety Unit Portland, Coast Guard; telephone 503-240-9319, email msupdxwwm@uscg.mil. If you have questions on viewing or submitting material to the docket, call Cheryl Collins, Program Manager, Docket Operations, telephone (202) 366-9826.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Table of Acronyms

    DHS Department of Homeland Security

    FR Federal Register

    NPRM Notice of Proposed Rulemaking

    TFR Temporary Final Rule

    A. Regulatory History and Information

    The Coast Guard is issuing this temporary final rule without prior notice and opportunity to comment pursuant to authority under section 4(a) of the Administrative Procedure Act (APA) (5 U.S.C. 553(b)). This provision authorizes an agency to issue a rule without prior notice and opportunity to comment when the agency for good cause finds that those procedures are “impracticable, unnecessary, or contrary to the public interest.” Under 5 U.S.C. 553(b)(B), the Coast Guard finds that good cause exists for not publishing a Notice of Proposed Rulemaking (NPRM) with respect to this rule. Waiting for a 30 day notice period to run would be impracticable. The Coast Guard did not receive the necessary information in time for this regulation to undertake both an NPRM prior to the scheduled event.

    Under 5 U.S.C. 553(d)(3), the Coast Guard finds that good cause exists for making this rule effective less than 30 days after publication in the Federal Register due to the late notification of this event and because the event will have occurred before comments could have been taken. Additionally, waiting for a 30 day notice period to run would be impracticable as delayed promulgation may result in injury or damage to persons and vessels from the hazards associated with fireworks displays.

    B. Basis and Purpose

    The legal basis for this rule is: 33 U.S.C. 1231; 50 U.S.C. 191; 33 CFR 1.05-1, 6.04-1, 6.04-6, and 160.5; Department of Homeland Security Delegation No. 0170.1; which collectively authorize the Coast Guard to establish regulatory safety zones for safety and environmental purposes.

    Fireworks displays create hazardous conditions for the maritime public because of the large number of vessels that congregate near the displays, as well as the noise, falling debris, and explosions that occur during the event. This safety zone is necessary in order to reduce vessel traffic congestion in the proximity of fireworks discharge sites and to prevent vessel traffic within the fallout zone of the fireworks.

    C. Discussion of the Temporary Final Rule

    This rule establishes one safety zone in the Sector Columbia River Captain of the Port Zone.

    The safety zone will encompass all waters, bank to bank of the Willamette River, in Portland, Oregon enclosed by the Marquam and Ross Island Bridges. This event will be held on Saturday August 22, 2015 from 8:30 p.m. to 9:30 p.m.

    D. Regulatory Analyses

    We developed this rule after considering numerous statutes and executive orders related to rulemaking. Below we summarize our analyses based on these statutes and executive orders.

    1. Regulatory Planning and Review

    This rule is not a significant regulatory action under section 3(f) of Executive Order 12866, Regulatory Planning and Review, as supplemented by Executive Order 13563, Improving Regulation and Regulatory Review, and does not require an assessment of potential costs and benefits under section 6(a)(3) of Executive Order 12866 or under section 1 of Executive Order 13563. The Office of Management and Budget has not reviewed it under those Orders. The Coast Guard has made this determination based on the fact that the safety zone created by this rule will not significantly affect the maritime public because vessels may still coordinate their transit with the Coast Guard in the vicinity of the safety zone.

    2. Impact on Small Entities

    The Regulatory Flexibility Act of 1980 (RFA), 5 U.S.C. 601-612, as amended, requires federal agencies to consider the potential impact of regulations on small entities during rulemaking. The term “small entities” comprises small businesses, not-for-profit organizations that are independently owned and operated and are not dominant in their fields, and governmental jurisdictions with populations of less than 50,000. The Coast Guard certifies under 5 U.S.C. 605(b) that this rule will not have a significant economic impact on a substantial number of small entities.

    This rule may affect the following entities, some of which may be small entities: The owners and operators of vessels intending to operate in the area covered by the safety zone. The rule will not have a significant economic impact on a substantial number of small entities because the safety zones will only be in effect for a limited period of time. Additionally, vessels can still transit through the zone with the permission of the Captain of the Port. Before the effective period, we will publish advisories in the Local Notice to Mariners available to users of the river. Maritime traffic will be able to schedule their transits around the safety zone.

    If you think that your business, organization, or governmental jurisdiction qualifies as a small entity Start Printed Page 48253and that this rule would have a significant economic impact on it, please submit a comment (see ADDRESSES) explaining why you think it qualifies and how and to what degree this rule would economically affect it.

    3. Assistance for Small Entities

    Under section 213(a) of the Small Business Regulatory Enforcement Fairness Act of 1996 (Pub. L. 104-121), we want to assist small entities in understanding this rule. If the rule would affect your small business, organization, or governmental jurisdiction and you have questions concerning its provisions or options for compliance, please contact the person listed in the FOR FURTHER INFORMATION CONTACT, above.

    Small businesses may send comments on the actions of Federal employees who enforce, or otherwise determine compliance with, Federal regulations to the Small Business and Agriculture Regulatory Enforcement Ombudsman and the Regional Small Business Regulatory Fairness Boards. The Ombudsman evaluates these actions annually and rates each agency's responsiveness to small business. If you wish to comment on actions by employees of the Coast Guard, call1-888-REG-FAIR (1-888-734-3247). The Coast Guard will not retaliate against small entities that question or complain about this rule or any policy or action of the Coast Guard.

    4. Collection of Information

    This rule will not call for a new collection of information under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520).

    5. Federalism

    A rule has implications for federalism under Executive Order 13132, Federalism, if it has a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government. We have analyzed this rule under that Order and determined that this rule does not have implications for federalism.

    6. Protest Activities

    The Coast Guard respects the First Amendment rights of protesters. Protesters are asked to contact the person listed in the FOR FURTHER INFORMATION CONTACT section to coordinate protest activities so that your message can be received without jeopardizing the safety or security of people, places or vessels.

    7. Unfunded Mandates Reform Act

    The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) requires Federal agencies to assess the effects of their discretionary regulatory actions. In particular, the Act addresses actions that may result in the expenditure by a State, local, or tribal government, in the aggregate, or by the private sector of $100,000,000 (adjusted for inflation) or more in any one year. Though this rule will not result in such expenditure, we do not discuss the effects of this rule elsewhere in this preamble.

    8. Taking of Private Property

    This rule will not cause a taking of private property or otherwise have taking implications under Executive Order 12630, Governmental Actions and Interference with Constitutionally Protected Property Rights.

    9. Civil Justice Reform

    This rule meets applicable standards in sections 3(a) and 3(b)(2) of Executive Order 12988, Civil Justice Reform, to minimize litigation, eliminate ambiguity, and reduce burden.

    10. Protection of Children

    We have analyzed this rule under Executive Order 13045, Protection of Children from Environmental Health Risks and Safety Risks. This rule is not an economically significant rule and does not create an environmental risk to health or risk to safety that may disproportionately affect children.

    11. Indian Tribal Governments

    This rule does not have tribal implications under Executive Order 13175, Consultation and Coordination with Indian Tribal Governments, because it does not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes.

    12. Energy Effects

    This action is not a “significant energy action” under Executive Order 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use.

    13. Technical Standards

    This rule does not use technical standards. Therefore, we did not consider the use of voluntary consensus standards.

    14. Environment

    We have analyzed this rule under Department of Homeland Security Management Directive 023-01 and Commandant Instruction M16475.lD, which guide the Coast Guard in complying with the National Environmental Policy Act of 1969 (NEPA) (42 U.S.C. 4321-4370f), and have determined that this action is one of a category of actions that do not individually or cumulatively have a significant effect on the human environment. This rule involves the creation of one safety zone during fireworks displays to protect maritime public. This rule is categorically excluded from further review under paragraph 34(g) of Figure 2-1 of the Commandant Instruction. An environmental analysis checklist supporting this determination and a Categorical Exclusion Determination are available in the docket where indicated under ADDRESSES. We seek any comments or information that may lead to the discovery of a significant environmental impact from this rule.

    Start List of Subjects

    List of Subjects in 33 CFR Part 165

    • Harbors
    • Marine safety
    • Navigation (water)
    • Reporting and recordkeeping requirements
    • Security measures
    • Waterways
    End List of Subjects

    For the reasons discussed in the preamble, the Coast Guard is amending 33 CFR part 165 as follows:

    Start Part

    PART 165—REGULATED NAVIGATION AREAS AND LIMITED ACCESS AREAS

    End Part Start Amendment Part

    1. The authority citation for part 165 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 33 U.S.C. 1231; 50 U.S.C. 191; 33 CFR 1.05-1, 6.04-1, 6.04-6, and 160.5; Department of Homeland Security Delegation No. 0170.1.

    End Authority Start Amendment Part

    2. Add § 165.T13-510 to read as follows:

    End Amendment Part
    Safety Zone; TriMet Tilikum Crossing Bridge. Fireworks Display, Willamette River, Portland, OR.

    (a) Safety Zones. The following area is a designated safety zone:

    (1) Location. The safety zone will encompass all waters, bank to bank of the Willamette River, in Portland, Oregon enclosed by the Marquam and Ross Island Bridges.

    (2) Enforcement Period. This event will be held on Saturday August 22, 2015 from 8:30 p.m. to 9:30 p.m.

    (b) Regulations. In accordance with the general regulations in 33 CFR part 165, subpart C, no person may enter or remain in the safety zone created in this section or bring, cause to be brought, or allow to remain in the safety zone created in this section any vehicle, vessel, or object unless authorized by the Captain of the Port or his designated Start Printed Page 48254representative. The Captain of the Port may be assisted by other Federal, State, or local agencies with the enforcement of the safety zone.

    (c) Authorization. All vessel operators who desire to enter the safety zone must obtain permission from the Captain of the Port or Designated Representative by contacting either the on-scene patrol craft on VHF Ch 13 or Ch 16 or the Coast Guard Sector Columbia River Command Center via telephone at (503) 861-6211.

    (d) Definitions. As used in this section, designated representative means any Coast Guard commissioned, warrant, or petty officer who has been authorized by the Sector Columbia River Captain of the Port to assist in enforcing the security zones described in paragraph (a) of this section.

    Start Signature

    Dated: June 23, 2015.

    D.J. Travers,

    Captain, U.S. Coast Guard, Captain of the Port, Sector Columbia River.

    End Signature End Supplemental Information

    [FR Doc. 2015-19815 Filed 8-11-15; 8:45 am]

    BILLING CODE 9110-04-P

Document Information

Effective Date:
8/22/2015
Published:
08/12/2015
Department:
Coast Guard
Entry Type:
Rule
Action:
Temporary final rule.
Document Number:
2015-19815
Dates:
This rule is effective from 8:30 p.m. until 9:30 p.m. on August 22, 2015.
Pages:
48252-48254 (3 pages)
Docket Numbers:
Docket Number USCG-2015-0510
RINs:
1625-AA00: Safety Zone Regulations
RIN Links:
https://www.federalregister.gov/regulations/1625-AA00/safety-zone-regulations
Topics:
Harbors, Marine safety, Navigation (water), Reporting and recordkeeping requirements, Security measures, Waterways
PDF File:
2015-19815.pdf
CFR: (1)
33 CFR 165.T13-510