-
Start Preamble
August 9, 2004.
In an order issued July 30, 2004,[1] the Commission directed staff to convene a technical conference to discuss numerous issues raised by Northwest Pipeline Corporation's filing, including the appropriateness of pipeline capacity reductions, the structure and eligibility criteria for open seasons contemplated by the tariff changes (“reverse” open seasons), the exit fee, including how the fee is derived and why it must be paid as a lump sum. Other issues were raised by protestors/intervenors as well.
Take notice that a technical conference will be held on Tuesday August 24, 2004, at 10 a.m. e.s.t.), in a room to be designated at the offices of the Federal Energy Regulatory Commission, 888 First Street, NE., Washington DC 20426.
All interested parties and staff are permitted to attend. For further information please contact: Harris Wood at (202) 502-8224.
Start SignatureMagalie R. Salas,
Secretary.
Footnotes
1. Northwest Pipeline Company, 108 FERC ¶ 61,103 (2004).
Back to Citation[FR Doc. E4-1817 Filed 8-12-04; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 08/13/2004
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- E4-1817
- Pages:
- 50188-50188 (1 pages)
- Docket Numbers:
- Docket No. RP04-386-000
- EOCitation:
- of 2004-08-09
- PDF File:
- e4-1817.pdf