2018-17292. Puget Sound Energy, Inc.; SOCCO, Inc.; Sumas Pipeline Company; Sumas Dry Kilns, Inc.; Notice of Application  

  • Start Preamble

    Take notice that on July 20, 2018 Puget Sound Energy, Inc. (Puget), SOCCO, Inc. (SOCCO), Sumas Pipeline Company (Sumas) and Sumas Dry Kilns, Inc. (Dry Kilns), filed in Docket No. CP18-532-000, a joint application pursuant to section 3 of the Natural Gas Act (NGA), to amend authorization under NGA section 3 and Presidential Permit to reflect that Sumas has transferred a portion of its ownership interest in the border crossing facility and natural gas pipeline located in Whatcom County, Washington to Puget and SOCCO and the subsequent, pending transfer of SOCCO's resulting ownership interest to Sumas Dry Kilns, Inc. Puget, SOCCO, and Dry Kilns propose no construction or modification to the previously-approved facilities, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at http://www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY, contact (202) 502-8659.

    Any questions regarding this application should be directed to Pamela J. Anderson, Perkins Coie LLP, 10885 NE 4th Street, Suite 700, Bellevue, Washington 98033, by phone at (425) 635-1417 or by email at PJAnderson@perkinscoie.com.

    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission's public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff's issuance of the EA for this proposal. The filing of the EA in the Commission's public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff's EA.

    There are two ways to become involved in the Commission's review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the below listed comment date, file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission's Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit five copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding.

    However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission's rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest.

    Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission's environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission's environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission's final order.

    The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the eFiling link at http://www.ferc.gov. Persons unable to file electronically should submit original and five copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426.

    Comment Date: 5 p.m. Eastern Time on August 23, 2018.

    Start Signature

    Dated: August 2, 2018.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2018-17292 Filed 8-10-18; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
08/13/2018
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2018-17292
Dates:
5 p.m. Eastern Time on August 23, 2018.
Pages:
40027-40027 (1 pages)
Docket Numbers:
Docket No. CP18-532-000
PDF File:
2018-17292.pdf