95-20087. Northwest Pipeline Corporation; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 60, Number 157 (Tuesday, August 15, 1995)]
    [Notices]
    [Pages 42152-42153]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-20087]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP95-655-000]
    
    
    Northwest Pipeline Corporation; Notice of Request Under Blanket 
    Authorization
    
    August 9, 1995.
        Take notice that on August 1, 1995, Northwest Pipeline Corporation 
    (Northwest), 295 Chipeta Way, Salt Lake City, Utah 84108, filed a 
    request with the Commission in Docket No. CP95-655-000 pursuant to 
    Sections 157.205, 157.211 and 157.216(b) of the Commission's 
    Regulations under the Natural Gas Act (NGA) for permission to, 
    authorized in blanket certificate issued in Docket No. CP82-433-000, 
    all as more fully set forth in the request on file with the Commission 
    and open to public inspection.
        Northwest proposes to remove and retire two existing 8-inch 
    regulators and appurtenances at the North Seattle Meter Station (Meter 
    Station) in Smohomish County, Washington, at the request of Washington 
    Natural Gas Company (Washington Natural). Northwest further proposes to 
    construct and operate appurtenant replacement facilities at the Meter 
    Station which would accommodate a higher delivery pressure and 
    additional delivery capacity. Northwest states that the removal of the 
    regulators will change the design capacity of the Meter Station from 
    117,500 Dth per day at the 260 psig to approximately 165,000 Dth per 
    day at a minimum of 500 psig, with higher capacities and pressures. The 
    estimated cost of the proposed facility upgrade would be approximately 
    $75,646 which would be reimbursed by Washington Natural.
        Any person or the Commission's staff may, within 45 days after the 
    Commission has issued this notice, file pursuant to Rule 214 of the 
    Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or 
    notice of intervention and pursuant to Section 157.205 of the 
    Regulations under the NGA (18 CFR 157.205) a protest to the request. If 
    no protest is filed within the allowed time, the proposed activity 
    shall be deemed to be authorized effective the day after the time 
    allowed 
    
    [[Page 42153]]
    for filing a protest. If a protest is filed and not withdrawn within 30 
    days after the time allowed for filing a protest, the instant request 
    shall be treated as an application for authorization pursuant to 
    Section 7 of the NGA.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 95-20087 Filed 8-14-95; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
08/15/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-20087
Pages:
42152-42153 (2 pages)
Docket Numbers:
Docket No. CP95-655-000
PDF File:
95-20087.pdf