94-20076. Proposed Changes to FERC Gas Tariff; Southern Natural Gas Company  

  • [Federal Register Volume 59, Number 157 (Tuesday, August 16, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-20076]
    
    
    [[Page Unknown]]
    
    [Federal Register: August 16, 1994]
    
    
    -----------------------------------------------------------------------
    
    Federal Energy Regulatory Commission
    [Docket No. RP94-353-000]
    
     
    
    Proposed Changes to FERC Gas Tariff; Southern Natural Gas Company
    
    August 10, 1994.
        Take notice that on August 5, 1994, Southern Natural Gas Company 
    (Southern) tendered for filing as part of its FERC Gas Tariff, Seventh 
    Revised Volume No. 1, the following tariff sheets to be effective 
    September 1, 1994:
    
    Second Revised Sheet No. 3
    Second Revised Sheet No. 139
    Original Sheet No. 139a
    Second Revised Sheet No. 144
    Original Sheet Nos. 403a-o
    
        Southern states that the purpose of this filing is to revise the 
    allocation methodologies in its transportation tariff to allow it to 
    enter into balancing agreements with operators at pipeline 
    interconnects so that shippers can be allocated their nominations and 
    any imbalances at the point of interconnection can be resolved between 
    the interconnecting pipelines under a mutually agreeable Pipeline 
    Balancing Agreement.
        Southern has requested all waivers necessary to make these sheets 
    effective September 1, 1994.
        Southern states that copies of the filing will be served upon its 
    shippers and interested state commissions.
        Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C. 
    20426, in accordance with Rules 211 and 214 of the Commission's Rules 
    of Practice and Procedure (18 CFR Sections 385.211 and 385.214). All 
    such motions and protests should be filed on or before August 17, 1994. 
    Protests will not be considered by the Commission in determining the 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 94-20076 Filed 8-15-94; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
08/16/1994
Department:
Federal Energy Regulatory Commission
Entry Type:
Uncategorized Document
Document Number:
94-20076
Pages:
0-0 (1 pages)
Docket Numbers: