96-20947. Environmental Impact Statements; Notice of Availability  

  • [Federal Register Volume 61, Number 160 (Friday, August 16, 1996)]
    [Notices]
    [Pages 42608-42609]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-20947]
    
    
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    [ER-FRL-5472-3]
    
    
    Environmental Impact Statements; Notice of Availability
    
        Responsible Agency: Office of Federal Activities, General 
    Information (202) 564-7167 OR (202) 564-7153.
        Weekly receipt of Environmental Impact Statements filed August 5, 
    1996 through August 9, 1996 pursuant to 40 CFR 1506.9.
    
    EIS No. 960370, Draft EIS, COE, CA, Santa Rosa Subregional Long-Term 
    Wastewater Project, Implementation, Reclaimed Water Disposal from the 
    Laguna Wastewater Treatment Plant, COE Section 10 and 404 Permits, 
    Sonoma County, CA, Due: October 07, 1996, Contact: Wade Eakle (415) 
    977-8438.
    EIS No. 960371, Draft EIS, FHW, WI, US 141 Highway Transportation 
    Project, Improvement between WI-22 and WI-64 (LeMere Road--6th Road), 
    Funding and COE Section 4 Permit, Marinette and Oconto Counties, WI, 
    Due: October 01, 1996, Contact: Peter Garcia (608) 829-7500.
    EIS No. 960372, Final EIS, AFS, OR, Trail System and Off-Highway 
    Vehicle Management and Development, Implementation, Ochoco National 
    Forest and Crooked River National Grassland, Crook, Grant, Jefferson, 
    Harney and Wheeler Counties, OR, Due: September 16, 1996, Contact: Sue 
    Kocis (541) 416-6530.
    EIS No. 960373, Draft EIS, BLM, NV, Ruby Hill Gold Mining Operations 
    Project, Implementation, Battle Mountain District, Plan of Operations 
    and COE Section 404 Permit, Eureka County, NV, Due: October 08, 1996, 
    Contact: Christopher Stubbs (702) 635-4000.
    EIS No. 960374, Draft EIS, FHW, TX, Loop 49 Southern Section 
    Construction, TX-155 to TX-110, Funding, Tyler, Smith County, TX, Due: 
    September 30, 1996, Contact: Gus Shanine (512) 916-5988.
    EIS No. 960375, Final EIS, ICC, WV, Elk River Railroad Railline (Docket 
    No. 31989), Construction Exemption and Operation, NPDES Permit and 
    Approval of Permits, Clay and Kanawha Counties, WV, Due: September 16, 
    1996, Contact: Michael Dalton (202) 927-6197.
    EIS No. 960376, Draft EIS, BLM, ID, Owyhee Resource Management Plan, 
    Implementation, Lower Snake River District, Owyhee County, ID, Due: 
    November 16, 1996, Contact: Fred Minckler (208) 384-3396.
    EIS No. 960377, Final EIS, FHW, RI, I-195 Transportation Improvements, 
    between the west end of the Washington Bridge and Interstate Route I-95 
    through Providence, Funding, COE Section 404 and US Coast Guard Bridge 
    Permits, Providence County, RI, Due: September 23, 1996, Contact: 
    Gordon Hoxie (401) 528-4551.
    EIS No. 960378, Final EIS, NOA, NC, Black Sea Bass (Centropristis 
    striata) Fishery Management Plan (FMP), Implementation, in the western 
    Atlantic Ocean, from Cape Hatteras, NC northward to the US-Canadian 
    Border, Due: September 16, 1996, Contact: Rolland A. Schmitten (301) 
    713-2239.
    EIS No. 960379, Draft Supplement, FHW, NC, US 17, New Bern Bypass 
    Construction, Jones-Craven County Line to NC-1438 near Vanceboro, 
    Additional Information Concerning Three Additional Alternatives, 
    Funding, COE Section 404 and US Coast Guard Bridge Permits Issuance, 
    Craven County, NC, Due:
    
    [[Page 42609]]
    
    September 30, 1996, Contact: Nicholas L. Graf (919) 856-4356.
    EIS No. 960380, Final EIS, UAF, AZ, Luke Air Force Base, Construction 
    and Operation of 18-Hole Golf Course, In a Detention Basin to Prevent 
    Flood Damage, Dysart Drain Improvement Project, Maricopa County, AZ, 
    Due: September 16, 1996, Contact: Robert Maxwell (602) 856-3817.
    
    Amended Notices
    
    EIS No. 960217, Legislative Draft, AFS, CA, Tahoe National Forest and 
    Portion of Plumas and EL Dorado National Forests, Implementation, 
    Twenty-Two Westside Rivers for Suitability and inclusion in the 
    National Wild and Scenic Rivers System, Wild and Scenic River Study, 
    Placer, Nevada, Sierra, Plumas, EL Dorado and Yuba Counties, CA, Due: 
    September 09, 1996, Contact: Phil Horning (916) 478-6210. Published 
    FR--05-2-96--Due Date Correction.
    EIS No. 960268, Draft EIS, USN, FL, VA, USS SEAWOLF Submarine Shock 
    Testing, Implementation, located in the Offshore Mayport, FL or 
    Norfolk, VA, Due: September 17, 1996, Contact: Will Sloger (803) 820-
    5797. Published FR--06-14-96--Review Period Reopened.
    EIS No. 960287, Draft EIS, TVA, TN, GA, MS, VA, AL, KY, NC, Shoreline 
    Management Initiative: An Assessment of Residential Shoreline 
    Development Impacts in the Tennessee Valley, Mainstream Tennessee River 
    and Tributary Reservoirs in AL, KY, NC, TN, GA, MS and VA, Due: October 
    15, 1996, Contact: Ronald D. Davis, Sr. (800) (800) 882-5263. Published 
    FR 06-28-96--Review Period Extended.
    
        Dated: August 13, 1996.
    William D. Dickerson,
    Director, NEPA Compliance Division, Office of Federal Activities.
    [FR Doc. 96-20947 Filed 8-15-96; 8:45 am]
    BILLING CODE 6560-50-U 
    
    
    

Document Information

Published:
08/16/1996
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
96-20947
Pages:
42608-42609 (2 pages)
Docket Numbers:
ER-FRL-5472-3
PDF File:
96-20947.pdf