01-20607. Northwest Pipeline Corporation; Notice of Availability of the Environmental Assessment for the Proposed Everett Delta Lateral Project  

  • Start Preamble August 10, 2001.

    The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared an environmental assessment (EA) on the natural gas pipeline facilities proposed by Northwest Pipeline Corporation (Northwest) in the above-referenced docket.

    The EA was prepared to satisfy the requirements of the National Environmental Policy Act. The staff concludes that approval of the proposed project, with appropriate mitigating measures, would not constitute a major Federal action significantly affecting the quality of the human environment.

    The EA assesses the potential environmental effects of the construction and operation of the proposed gas pipeline and aboveground facilities including:

    • About 9.0 mile of a 20-inch-diameter pipeline in Snohomish County, Washington, which would tie in with Northwest's existing mainline and mainline loop north of the City of Lake Stevens; the lateral would extend from the interconnect with Northwest's existing system to Northwest Power Company's (NPC) power plant in Everett, Washington;
    • Two meter stations at a joint meter station site at the end of the pipeline for deliveries to NPC and for deliveries to Puget Sound Energy (PSE); and
    • Other aboveground facilities include two 12-inch-diameter mainline taps, a pig launcher, one 20-inch-diameter block valve assembly, a liquids separator; and a pig receiver.Start Printed Page 43007

    The purpose of the proposed facilities would be to supply natural gas to NPC's 248-megawatt combined-cycle power generating plant in Everett, Washington. The Everett Delta Lateral would have a design capacity of approximately 133,000 dekatherms per day (Dth/day), of which up to 90,000 Dth/day would be delivered to fuel NPC's power plant, and 43,000 Dth/day would be delivered to PSE to supply its existing local distribution system. Initially, the power plant would require approximately 45,000 Dth/day of natural gas for full operation.

    The EA has been placed in the public files of the FERC. A limited number of copies of the EA are available for distribution and public inspection at: Federal Energy Regulatory Commission, Public Reference and Files Maintenance Branch, 888 First Street, NE., Room 2A, Washington, DC 20426, (202) 208-1371.

    Copies of the EA have been mailed to Federal, state and local agencies, public interest groups, interested individuals, newspapers, and parties to this proceeding.

    Any person wishing to comment on the EA may do so. To ensure consideration prior to a Commission decision on the proposal, it is important that we receive your comments before the date specified below. Please carefully follow these instructions to ensure that your comments are received in time and properly recorded:

    • Send two copies of your comments to: Secretary, Federal Energy Regulatory Commission, 888 First St., NE., Room 1A, Washington, DC 20426.
    • Label one copy of the comments for the attention of Gas Group 2, PJ-11.2
    • Reference Docket No. CP01-49-000; and
    • Mail your comments so that they will be received in Washington, DC on or before September 10, 2001.

    Comments may also be filed electronically via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's web site at http://www.ferc.gov under the “e-Filing” link and the link to the User's Guide. Before you can file comments you will need to create an account which can be created by clicking on “Login to File” and then “New User Account.”

    Comments will be considered by the Commission but will not serve to make the commentor a party to the proceeding. Any person seeking to become a party to the proceeding must file a motion to intervene pursuant to Rule 214 of the Commission's Rules of Practice and Procedures (18 CFR 385.214).[1] Only intervenors have the right to seek rehearing of the Commission's decision.

    Affected landowners and parties with environmental concerns may be granted intervenor status upon showing good cause by stating that they have a clear and direct interest in this proceeding which would not be adequately represented by any other parties. You do not need intervenor status to have your comments considered.

    Additional information about the proposed project is available from the Commission's Office of External Affairs, at (202) 208-1088 or on the FERC Internet website (www.ferc.gov) using the “RIMS” link to information in this docket number. Click on the “RIMS” link, select “Docket #” from the RIMS Menu, and follow the instructions. For assistance with access to RIMS, the RIMS helpline can be reached at (202) 208-2222.

    Similarly, the “CIPS” link on the FERC Internet website provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. From the FERC Internet website, click on the “CIPS” link, select “Docket #” from the CIPS menu, and follow the instructions. For assistance with access to CIPS, the CIPS helpline can be reached at (202) 208-2474.

    Start Signature

    Linwood A. Watson, Jr.,

    Acting Secretary.

    End Signature End Preamble

    Footnotes

    1.  Interventions may also be filed electronically via the Internet in lieu of paper. See the previous discussion on filing comments electronically.

    Back to Citation

    [FR Doc. 01-20607 Filed 8-15-01; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
08/16/2001
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
01-20607
Pages:
43006-43007 (2 pages)
Docket Numbers:
Docket No. CP01-49-000
EOCitation:
of 2001-08-10
PDF File:
01-20607.pdf